Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAccepted-AOC FLAT NO S 2 SHRI CHINTAMANI S NO 1 1148 MAHAJAN PETH MODEL COLONY SHIVAJI NAGAR PUNE 411016 | PUNE | PUNE | MAHARASHTRA | 411016 | ₹5.9 Cr | L1 | Accepted-AOC Being Reasonable and Accepted |
| 2 | L2₹6.2 Cr+₹29.9 L (5.06%)Rejected-AOC 401 7 32 CIVIL LINES ROORKEE HARIDWAR UP 247 667 | ROORKEE | HARIDWAR | UP | 247667 | ₹6.2 Cr+₹29.9 L (5.06%) | L2 | Rejected-AOC Other Than L1 |
| 3 | L3₹6.3 Cr+₹40.8 L (6.92%)Rejected-AOC 61 LAALA LAJPAT RAI COLONY BHOPAL M P 462023 | BHOPAL | MADHYA PRADESH | 462023 | ₹6.3 Cr+₹40.8 L (6.92%) | L3 | Rejected-AOC Other Than L1 |
| Sl No | Description | Qty | Unit | Horizon Construction L1 | KHANDELWAL ASSOCIATES L2 | SHREE KRISHNA INFRASTRUCTURE L3 |
|---|---|---|---|---|---|---|
| 1.00Schedule "A" Part I (B/R) Works | ||||||
| 2.00 | Disconnecting existing tanks, setting aside (or lowering if required) for repairs, cleaning etc and hoisting if required reconnecting and re-fixing in position(cleaning repairing etc measured separately) capacity exc 500 & n.exc 1000 ltrs complete all as specified and directed. | 10 | Each | 250 ₹2,500 Lowest | 360 ₹3,600 | 540 ₹5,400 |
| 3.00 | Dismantling of water tanks and removing to store of capacity exc 500 & n.exc 1000 ltrs, complete all as specified and directed. | 40 | Each | 100 ₹4,000 Lowest | 150 ₹6,000 | 270 ₹10,800 |
| 4.00 | Supply and fixing rotational moulded polyethylene water storage tank(Triple layer), cylindrical vertical with closed top, 750 litres capacity, hoisted and fixed in position,including brass ball valve, high pressure, 20 mm dia, with polyethylene float and fly nut, screwed for iron pipe or brass ferrule and fixed, complete all as specified and as directed. complete all as specified and as directed. | 40 | Each | 6,000 ₹2,40,000 Lowest | 7,500 ₹3,00,000 | 8,100 ₹3,24,000 |
| 5.00 | Supply and fixing in repairs brass ball valve, high pressure, 20 mm dia, with polyethylene float and fly nut, screwed for iron pipe or brass ferrule and fixed, complete all as specified and as directed. | 10 | Each | 350 ₹3,500 Lowest | 900 ₹9,000 | 720 ₹7,200 |
| 6.00 | Demolition of cement concrete in roofs, floors (other than ground floors), beams, staircases, landings, chajjas, and similar suspended structures, including removal of waterproofing treatment in any number of layers, and disposal of debris to a distance exceeding 250 m and not exceeding 5 km from the site, complete, as specified and as directed. | 248.8 | Cum | 200 ₹49,760 Lowest | 405 ₹1,00,764 | 450 ₹1,11,960 |
| 7.00 | Material and labour for laying 10 mm thick screed bed on concrete roof surfaces, in cement mortar 1:3, finished fair and even, without using extra cement by incorporating Dr. Fixit (or Techno-commercial Equivalent approved) at 3% by weight of cement content. The work shall include all necessary materials, tools, and labour for Complete all work as specified and directed by the Engineer-in-Charge.
Note: Water proofing compound shall be measured and paid seperately. | 6,214.2 | Sqm | 150 ₹9,32,130 | 105 ₹6,52,491 Lowest | 225 ₹13,98,195 |
| 8.00 | M&L Cement concrete Type-B0 (1:2:4) using 12.5 mm graded stone aggregate in roof padding, laid to required slope, including mixing, laying, ramming, watering, curing and finishing the surface fair and even, complete all as specified and directed | 155.4 | Cum | 6,000 ₹9,32,400 | 5,100 ₹7,92,540 | 4,500 ₹6,99,300 Lowest |
| 9.00 | M&L for APP-based modified pre-fabricated five-layer waterproofing membrane, 3 mm thick and weighing not less than 3.6 kg/m², reinforced with polyester non-woven fabric mat (160 g/m²), black finished. The surface shall be primed with compatible primer conforming to IS 3488 @ 0.30 L/m² and IS 17029 bonding material 85/25 bitumen @ 1.2 kg/m² before and after laying.The membrane shall be laid by torch method with side overlaps of 75 mm and longitudinal overlaps of 100 mm. At junctions of roof and parapet walls, a groove of 20 × 20 mm shall be provided at a height of 100 mm, into which the membrane shall be inserted and sealed with bituminous mastic. All overlaps/joints shall be sealed with hot 85/25 bitumen. Finally, two coats of waterproofing aluminium paint shall be applied over the APP membrane. Work to be executed as per specifications and directions of Engineer-in-Charge. | 5,464.8 | Sqm | 490 ₹26,77,752 Lowest | 600 ₹32,78,880 | 540 ₹29,50,992 |
| 10.00 | M&L for applying liquid membrane waterproofing on roof surface, complete, using approved polyurethane-based liquid membrane system, applied as per manufacturer’s specifications, specified below and as directed. | 749.5 | Sqm | 375 ₹2,81,062.5 Lowest | 1,050 ₹7,86,975 | 810 ₹6,07,095 |
Tender Value
₹7.9 Cr
EMD Value
₹7.2 L
Closing Date
17 Apr 2026, 6:00 pmClosed
Chief Engineer Pune Zone
HQ Chief Engineer Pune Zone Camp, Pune 411001
ADDN/ ALTRN OF CERTAIN OTM ACCN (P-543 TO P-546, P-601 AND P-669) AT CME UNDER GE (CME) KHADKI
2026_MES_756127_1
84662
Open Tender
Civil Works
Item Rate
630 days
Garrison Engineer (CME) Khadki
Class S and Category a(i)
7 documents required · 7 mandatory
₹3,000
Garrison Engineer (CME) Khadki
₹7.2 L
Yes
19 Jun 2026
20 Mar 2026
24 Apr 2026
20 Mar 2026
17 Apr 2026
10 Apr 2026
21 Mar 2026 - 28 Mar 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_847252.xls
BOQ • 34.32 MB
84662-CME-ADNALTRN-IFA.pdf
Tender Documents • 5.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .