Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.5 L C/o STP of 500 KLD for existing hostels, new building along with sewer line connection unfiltered water line distribution an drain beside stadium including operation for 6 months SH C/o RCC drain beside stadium (Balance work) | C/o STP of 500 KLD for existing hostels, new building along with sewer line connection unfiltered water line distribution an drain beside stadium including operation for 6 months SH C/o RCC drain beside stadium (Balance work) | ₹14.5 L | L1 | - |
| 2 | L2₹16.6 L+₹2.1 L (14.3%)Financial bid opened C/o STP of 500 KLD for existing hostels, new building along with sewer line connection unfiltered water line distribution an drain beside stadium including operation for 6 months SH C/o RCC drain beside stadium (Balance work) | C/o STP of 500 KLD for existing hostels, new building along with sewer line connection unfiltered water line distribution an drain beside stadium including operation for 6 months SH C/o RCC drain beside stadium (Balance work) | ₹16.6 L+₹2.1 L (14.3%) | L2 | Financial bid opened |
| 3 | L3₹17.2 L+₹2.7 L (18.8%)Financial bid opened C/o STP of 500 KLD for existing hostels, new building along with sewer line connection unfiltered water line distribution an drain beside stadium including operation for 6 months SH C/o RCC drain beside stadium (Balance work) | C/o STP of 500 KLD for existing hostels, new building along with sewer line connection unfiltered water line distribution an drain beside stadium including operation for 6 months SH C/o RCC drain beside stadium (Balance work) | ₹17.2 L+₹2.7 L (18.8%) | L3 | Financial bid opened |
| 4 | L4₹17.3 L+₹2.8 L (19.1%) C/o STP of 500 KLD for existing hostels, new building along with sewer line connection unfiltered water line distribution an drain beside stadium including operation for 6 months SH C/o RCC drain beside stadium (Balance work) | C/o STP of 500 KLD for existing hostels, new building along with sewer line connection unfiltered water line distribution an drain beside stadium including operation for 6 months SH C/o RCC drain beside stadium (Balance work) | ₹17.3 L+₹2.8 L (19.1%) | L4 | - |
| 5 | - | - | - | - |
| Sl No | Description | Qty | Unit | AJEET KUMAR L4 | ASHISH KUMAR L1 | DEEPAK KUMAR L2 | AYUSH ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1 | CIVIL WORK | - | - | -12.5 ₹17,28,897.63 | -26.54 ₹14,51,483.65 Lowest | -16.01 ₹16,59,544.13 | -12.76 ₹17,23,760.33 |
Tender Value
₹19.8 L
EMD Value
₹39,518
Closing Date
4 Aug 2025, 3:00 pmClosed
EE&SM( C)-1
Ramcharan Meena
O/o CE cum ED, Bodhgaya Project Zone-I ,CPWD Bodhgaya
C/o STP of 500 KLD for existing hostels, new building along with sewer line connection unfiltered water line distribution an drain beside stadium including operation for 6 months SH C/o RCC drain beside stadium (Balance work)
121633
NIQ.13/EE&SM(C)-I/ BGPD/ CPWD/2025
OPEN
Civil Works - Buildings
NCB
20 days
Gaya, Bihar
6 documents required · 6 mandatory
₹39,518
Not Applicable
4 Aug 2025
31 Jul 2025
4 Aug 2025
4 Aug 2025
1 Aug 2025
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Quotation+13.pdf
document • 1.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .