Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 440 GANDHI CHOWK SADAR BAZAR SHRI MUKATSAR SAHIB | RUPNAGAR | RUPNAGAR | PUNJAB | ₹1.2 Cr | L1 | Accepted-AOC Award of Contract DEEPAK KUMAR CONTRACTOR by the committee for the Lower Bidder than others |
| 2 | L2₹1.3 Cr+₹10.7 L (8.94%)Rejected-Finance ABOHAR | ₹1.3 Cr+₹10.7 L (8.94%) | L2 | Rejected-Finance Higher tender rates from the lowest bidder |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
9 Jan 2023, 11:00 amClosed
Executive Engineer, Abohar Canal Division Abohar
Executive Engineer, Abohar Canal Division Abohar
Estimate for Reconstruction/Rehabilitation of concrete Lining of Balance work of Alamwala Disty RD 23710 to 24900 and 37400-42055 and Lakkarwala Mr. RD 5296-8300
2022_WR_93149_2
E-Retendering Notice No.21/Abohar Canal Division /
Open Tender
Civil Works - Canal
Item Rate
Sri Muktsar Sahib
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
Yes
₹2.2 L
Yes
28 Feb 2023
30 Dec 2022
9 Jan 2023
30 Dec 2022
9 Jan 2023
30 Dec 2022
Amount
Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road with discharge upto 1.50 cumecs.
Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m.
Excavation in soil using hydraulic jcb and hydraulic trolley with disposal upto 11.69 Km including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location within all lifts and lead. (1st 1.90 km & last 2.19 km katcha, rest pucca).
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications.
Dressing of Earthwork for new work.
Dressing of Dowel in addition to payment for dressed earthwork.
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth.
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 1.50 to 3.00 mtr depth.
Earthwork excavation for sleepers under the lining.
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per PWD specification.
Laying Cement water slurry 1:3 with cement @ 2.25 kg per sqm as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and Engineer-In-Charge.
Providing and laying cement concrete lining 10 cm thick or less (60 mm thick) (manually) for irrigation channels, using cement concrete (M-15) mixed in automatic computerized batching and mixing plant and transported to site in transit mixers including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and Engineer- In-Charge.
Providing and laying cement concrete M-15 for coping mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications and Engineer-In-Charge.
Providing and laying cement concrete M-15 for Sleeper mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications.
Shuttering for faces of Concrete lining on side slopes and bed complete in all respect as per design / drawing and PWD specifications.
Filling of contraction / construction joints with sealing compound to be applied hot after applying primer coat including supply & carriage all material complete in all respect.
Extra bitumen painting at 0.69 kg per sqm.
Laying polythene film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specifications and Engineer-In-Charge.
Providing & Fixing Boundary Pillars
Providing & Fixing Distance Marks
Dismantling brick work, tile masonry or tile lining (in cement mortar).
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Supply of New APM block. (Lumsum)
PCC 1:4:8 with Stone aggregate 40 mm gauge mixing by mechanical means using concrete mixer volume metric type.
First class burnt Brick Work in Cement Sand Mortor 1:4 in foundation & plinth.
Laying Reinforced cement concrete (M-20) mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrated but excluding steel reinforcement, centering and shuttering in super structure. (For slab)
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe-500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
Extra labour for dressing of bricks for outlet with 'H' more than 0.50 m but upto 0.90 m.
Any Other
VARSHA CONSTRUCTION CO
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .