Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.0 L+₹30,135.36 (4.53%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹7.1 L+₹48,165.07 (7.24%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹7.5 L+₹87,830.42 (13.2%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹8.1 L+₹1.5 L (22.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹12.9 L
EMD Value
₹25,760
Closing Date
14 Sept 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer Thathri
Major Repair at High school Poneja under Samagra shiksha
2026_PWDJK_322849_5
e-NIT NO. 35 OF 2026-27
Open Tender
Civil Works
Percentage
180 days
Thathri
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer PWD Division Thathri
₹25,760
Yes
25 Sept 2026
31 Aug 2026
15 Sept 2026
31 Aug 2026
14 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge | |||||
| 0.0 | All kinds of soil : | 30.01 | cum | 479.3 | ₹14,383.79 |
| 2Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | |||||
| 0.0 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% boulders | 47.4 | cum | 4,774.46 | ₹2,26,309.4 |
| 0.0 | 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) | 10.98 | cum | 5,202.9 | ₹57,127.84 |
| 3 | Providing and fixing hard board sheet ceiling of approved quality with necessary nails etc. complete (frame work to be paid for separately) Standard Quality board 4.5 mm | 369.09 | sqm | 785.85 | ₹2,90,049.38 |
| 4 | Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position :Budloo / Fir wood | 3.39 | cum | 40,509.4 | ₹1,37,326.87 |
| 5 | 15 mm Cement plaster of mix:1 : 6 ( 1 cement : 6 coarse sand) | 37.17 | sqm | 306.85 | ₹11,405.61 |
| 6 | Providing and fixing wooden moulded beading to door and window frames with iron screws, plugs and priming coat on unexposed surface etc. complete:2nd class teak wood 50 x 12 mm | 265.85 | mtr | 214.75 | ₹57,091.29 |
| 7 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note: -Butt hinges and necessary screws shall be paid separately). Second kail wood 30 mm | 12.63 | sqm | 2,597.75 | ₹32,809.58 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_1084740.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .