Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.4 LAdmitted-Finance | -16.11% | ₹12.4 L | L1 | Admitted-Finance |
| 2 | L2₹14.5 L+₹2.1 L (16.6%)Admitted-Finance | -2.21% | ₹14.5 L+₹2.1 L (16.6%) | L2 | Admitted-Finance |
| 3 | L3₹14.7 L+₹2.2 L (18.0%)Admitted-Finance | -1.00% | ₹14.7 L+₹2.2 L (18.0%) | L3 | Admitted-Finance |
Tender Value
₹14.8 L
EMD Value
₹29,680
Closing Date
17 Aug 2026, 6:00 pmClosed
EXECUTIVE OFFICER
LAXMANGARH SIKAR
Stage construction work at the stadium
2026_DLB_585462_1
ETENDER/1844-45
Open Tender
Civil Works
Percentage
120 days
LAXMANGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EXECUTIVE OFFICER
₹29,680
Yes
18 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
17 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retainingwalls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks | 7.02 | cum | 678 | ₹4,759.56 |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top levelIn all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 52.67 | cum | 229.5 | ₹12,087.77 |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Stone, boulders, gravelly material Earth up to 3 Km | 59.69 | cum | 209.35 | ₹12,496.1 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate
40 mm nominal size) | 4.59 | cum | 4,330 | ₹19,874.7 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 9.79 | cum | 5,510 | ₹53,942.9 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantileversSuspended floors, roofs, landings, balconies and access platform. | 130.5 | sqm | 456 | ₹59,508 |
| 7 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 85.12 | sqm | 375 | ₹31,920 |
| 8 | Lintels, beams, plinth beams, girders, bressumers and cantilevers(Form work) | - | - | - | - |
| 9 | pcc | 4.8 | sqm | 426 | ₹2,044.8 |
| 10 | pcc | 7.04 | sqm | 426 | ₹2,999.04 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
BOQ_1040142.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .