Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC VILL BATAHI P O PATRIGHAT TEH BALDWARA DISTT MANDI HIMACHAL PRADESH | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹8.5 L+₹1.1 L (14.5%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹9.1 L+₹1.7 L (22.2%)Rejected-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | L3 | Rejected-Finance L3 Bidder | |
| 4 | L4₹9.4 L+₹2.0 L (26.2%)Rejected-Finance | L4 | Rejected-Finance L4 Bidder | |
| 5 | Rejected-Technical | - | Rejected-Technical Non-responsive |
Tender Value
₹7.6 L
EMD Value
₹15,200
Closing Date
22 Mar 2021, 5:00 pmClosed
EE Dhami
Shimla Rural Division HPPWD Dhami
SH- Providing Fixing W metal bream crash barrier at RD 1/460 to 1/560 and at bus stop 0/00 to 0/200 and improvement of curve on Majhthai Bharyal road at Rd 0/00 to 0/660, 1/400 to 1/460, 1/700 to 1/760 and 2/400 to 2/445 UNDER SPMRM
2021_PWD_45308_1
PW-SRDD-CB-CTR-2020-21-17691 dated 15-02-2021
Open Tender
Civil Works - Roads
Item Rate
90 days
Dhami
as per tender documents
12 documents required · 12 mandatory
₹500
₹15,200
Yes
6 Sept 2021
9 Mar 2021
23 Mar 2021
9 Mar 2021
22 Mar 2021
9 Mar 2021
Amount
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads and lifts dressing of sides and bottom and backfilling in trenches with excavated suitabale material as per MORD specification directed by Engineer-in-Charge.
Providing and laying cement concrete for Plan / reinforced conc. In open foundation complete as per drawing and technical specification clause - 802,803,1202 & 1203.in P.C.C grade M-20 (1.2.4. nominal mix 20mm ) Including carriage of material upto all leads and lifts as per the directions of Engineer-in-Charge.
Providing and erecting a "W"metal beam crash barrier comprisingof 3mm thick corrugated sheet metal rail 70 cm. above road/ground level fixed on ISMC series channel vertical post 150x75x5 mm spaced 2.0 m center to center,1.8 m high,1.1 m below ground /road level, all steel part and fitments to be galvanised by hot dip process, all fitting to conferms to IS:1367 and Is:1364 metal beam rail to be fixed on the vertical post with a spacer of channel section 150x75x5mm,330mm long complete as per clause 810 including high intensity grade all weather proof reflective sheeting multi colour tape fixed with mechanical means with high visible(cautionary) from long distance i.e. in fog prone area, black spot point and narrow curve etc. including carriage of material upto all leads and lifts as per the directions of Engineer in Charge.
Cutting in earth work in all heights and depths in all kinds of soil including saturated soil comprising of pick, jumper, blasting work both in soft and hard rock with chiseling/ wedging out of rock (where blasting is prohibited) and their intermediate classification of soil including, dewatering where ever required, setting to the required line, grades, side slopes trimming bottoms and level as shown on the drawing as directed by the Engineer-in-Charge at site according to HP.PWD specifications of 1990 (One thousand Nine hundred Ninety) Volume-1 and sorting out useful/un-useful materials and stacking the same in all leads and lifts and transportation of the unuseful materials for filling in road ways, embankments for grades improvements and leveling to the required grades and then disposing of surplus excavated earth in acquired width of road or on approved dumping sites through all modes of transportation including head load , animal load or mechanical means along with its leveling fine dressing and all lobour , machineries, materials, tools equipments and safety measures and incidentals necessary to complete the work by mechanized means and labour (if any required). the cost of useful materials such as stones,shingles,aggregates and slates shall be sorted out and stacked along road side,which shall not be less than one tenth of JW,one sixth of SR and one third of HR.= 16.73 Cum Qty. which shall be proportionately increase/decrease as the qty. of earth work increase/ decreas in all cases recovered from the contracto @170/-( one hundred seventy only) plus agreement percentage above per cubic metre shall be efacted any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all respects.
SUBHASH
pawan kumar
Gaurav Parihar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .