Tender Value
₹25.6 L
EMD Value
₹51,280
Closing Date
12 Jun 2026, 6:00 pmClosed
Vipin Kumar Jindal Executive Engineer
Executive Engineer PWD City Dn Ajmer
Restoration work of Service Lane towards Ekta Nagar Ajmer under City Division Ajmer
2026_CEPWD_566826_3
NIT NO 07of 2026-27of EE PWD City DN Ajmer
Open Tender
Civil Works
60 days
Ajmer
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EE PWD CITY DN AJMER (16725)/ MD RISL JAIPUR
₹51,280
Yes
18 Jun 2026
11 Jun 2026
15 Jun 2026
11 Jun 2026
12 Jun 2026
11 Jun 2026
11 Jun 2026 - 12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part : A : Road Work | |||||
| 1.01 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 | 277.2 | CUM | 69 | ₹19,126.8 |
| 1.02 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 277.2 | CUM | 25 | ₹6,930 |
| 1.03 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete.Earth, Sand, Lime, Morrum manure or sludge FOR 10 KM | 554.4 | CUM | 79.55 | ₹44,102.52 |
| 1.04 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. | 207.9 | CUM | 773 | ₹1,60,706.7 |
| 1.05 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 138.6 | cum | 2,418 | ₹3,35,134.8 |
| 2 | Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using Fixed Form Paver and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). | 382.65 | Cum | 5,160 | ₹19,74,474 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. | 48.93 | Cum | 461 | ₹22,556.73 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.68 MB
Tendernotice_2.pdf
PDF • 16.74 MB
Tendernotice_3.pdf
PDF • 0.42 MB
Tendernotice_4.pdf
PDF • 14.15 MB
Tendernotice_5.pdf
PDF • 5.85 MB
BOQ_1008394.xls
BOQ • 0.29 MB
Agreement.pdf
Tender Documents • 16.73 MB
Download all tender documents and submit your bid