| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.4 LAdmitted-Finance | ₹70.4 L | L1 | Admitted-Finance |
| 2 | L2₹73.7 L+₹3.3 L (4.63%)Admitted-Finance | ₹73.7 L+₹3.3 L (4.63%) | L2 | Admitted-Finance |
| 3 | L3₹75.0 L+₹4.6 L (6.52%)Admitted-Finance | ₹75.0 L+₹4.6 L (6.52%) | L3 | Admitted-Finance |
| 4 | L4₹77.7 L+₹7.3 L (10.3%)Admitted-Finance | ₹77.7 L+₹7.3 L (10.3%) | L4 | Admitted-Finance |
| 5 | L5₹83.5 L+₹13.0 L (18.5%)Admitted-Finance AT MANDARBAGICHA PADA WARD NO 20 PO BHAWANIPATNA DIST KALAHANDI 766001 | KALAHANDI | ODISHA | 766001 | ₹83.5 L+₹13.0 L (18.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Harihar Nayak L3 | Ms Bichitra Kumar Jena L10 | Aakar Infra Engineers PVT Ltd L14 | SUSANTA KUMAR SWAIN L9 | M/S BHAIRAB CHARAN SWAIN L2 | Maa Dakhinakali Enterprisers L1 | Manoj Kumar Nayak L5 | NIRANJAN SAHOO L8 | PADMABATI INFRAPROJECTS PVT. LTD. L12 | Nilamani Swain L4 | M/s. Jay Jagannath Enterprises L7 | M/S TRIBHUBAN DAS L13 | M/s. Magu Charan Nayak L11 | S.S. CONSTRUCTION CO. L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Furrow cutting to the existing bituminous road surface upto 50mm depth as & where required, disposing the debrises 2KM away from work site with supplying of all labours, materials, machinery, special T&P , tollage, taxes if any excluding GST etc. all complete as required for the work and as directed by the Engineer-in-charge. | 14,754 | Each Sqm | 0.05 ₹737.7 Lowest | 4 ₹59,016 | 20 ₹2,95,080 | 19.5 ₹2,87,703 | 2.49 ₹36,737.46 | 1 ₹14,754 | 2 ₹29,508 | 2.7 ₹39,835.8 | 5 ₹73,770 | 2 ₹29,508 | 2.28 ₹33,639.12 | 20 ₹2,95,080 | 4 ₹59,016 | 2 ₹29,508 |
| 2.00Supplying, all labour, materials , T&P for laying built up spray Grouting in layers applying tack coat of 3.00 kg of bitumen for 10.00 sqm using 0.50 of 25 mm to 40 mm size hard granite chrusher broken metal 15.00 kg of penetration grade 60/70 to 80/100 bitumen for 10.00 sqm in each layer with 0.13 cum of 12 mm size H.B.G chips as key stone for 10.00 sqm in each sreading over including cleaning the road surface by brushing removing debrises, heating pouring, spreading bitumen metal, chips and rolling with PRR of approved capacity including engagement, hire & running charges PRR & all other machineris, cost of all fuel & consumables, POL cost & conveyance charges of bitumen, metal chips hand packing to proper level pouring bitumen for uniformly penetration etc. all complete with with all cost of materials, labour, T&P,curing, tollage, royalties,transportation charges, engagement, hire & running charges of all machineries and cost & carriage of water including all testing charges etc. taxes excluding GST , etc. all complete as directed by Engineer-in Charge. | |||||||||||||||||
| 2.01 | 75.00 mm spray grouting | 2,950.8 | Each Sqm | 50 ₹1,47,540 Lowest | 700 ₹20,65,560 | 500 ₹14,75,400 | 180 ₹5,31,144 | 325 ₹9,59,010 | 300 ₹8,85,240 | 330 ₹9,73,764 | 315 ₹9,29,502 | 572 ₹16,87,857.6 | 380 ₹11,21,304 | 350 ₹10,32,780 | 400 ₹11,80,320 | 480 ₹14,16,384 | 230 ₹6,78,684 |
| 2.02 | 37.50 mm spray grouting | 1,475.4 | Each Sqm | 150 ₹2,21,310 | 740 ₹10,91,796 | 320 ₹4,72,128 | 120 ₹1,77,048 Lowest | 189.5 ₹2,79,588.3 | 150 ₹2,21,310 | 180 ₹2,65,572 | 285 ₹4,20,489 | 263 ₹3,88,030.2 | 175 ₹2,58,195 | 171 ₹2,52,293.4 | 300 ₹4,42,620 | 260 ₹3,83,604 | 150 ₹2,21,310 |
| 3.00 | Supplying all materials and labour ,scrapping cleaning the road surface and providing 50mm thick bituminous macadam using (crusher broken)19mm nominal size hard granite metal, heating, pouring & spreading bitumen metal and rolling with PRR including running and hire charges of PRR ,all other machineries,fuel and consumables ,with supply of all materials, labour, T&P, royalties,tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge. | 738 | Each Cum | 4,400 ₹32,47,200 | 550 ₹4,05,900 Lowest | 9,000 ₹66,42,000 | 6,200 ₹45,75,600 | 4,357 ₹32,15,466 | 4,300 ₹31,73,400 | 5,000 ₹36,90,000 | 4,800 ₹35,42,400 | 6,500 ₹47,97,000 | 4,200 ₹30,99,600 | 5,000 ₹36,90,000 | 6,500 ₹47,97,000 | 6,000 ₹44,28,000 | 4,770 ₹35,20,260 |
| 4.00 | Supplying all materials and labour, scrapping, cleaning the road surface and removing the debries within initial lead and lift and laying 20mm thick premix carpeting using 12mm graded hard granite chips (crusher broken) 0.27 cum of chips for 10 Sqm. as per IRC specification, heating the bitumen, conveying chips from stacks, mixing by any approved means at the rate of 1.59 Kg of bitumen for 0.0283 cum of chips, applying tack coat using 9.00 Kg of bitumen for 9.29 Sqm. spreading premix materials uniformly to required thickness including dressing, leveling to proper grade and camber rolling with PRR with running and hire charges of PRR, all other machineries, fuel and consumables, including cost of bitumen, T&P, tollage, royalties, taxes if any excluding GST etc. complete as per direction of Engineer-in-charge. | 14,754 | Each Sqm | 200 ₹29,50,800 | 240 ₹35,40,960 | 200 ₹29,50,800 | 125 ₹18,44,250 Lowest | 145 ₹21,39,330 | 136 ₹20,06,544 | 170 ₹25,08,180 | 190 ₹28,03,260 | 230 ₹33,93,420 | 170 ₹25,08,180 | 172 ₹25,37,688 | 250 ₹36,88,500 | 250 ₹36,88,500 | 160 ₹23,60,640 |
| 5.00 | Supplying all materials, labour, cleaning the road surface and laying 6mm thick seal coat using 6mm size chips (Bajree) at the rate of 0.06cum/10Sqm. and as per IRC specification and for pre coating bitumen @6.8 Kg/10 Sqm. rolling with PRR including hire and running charge of PRR, including cost of bitumen, T&P, royalties, tollage, all taxes if any excluding GST etc. complete as per the direction of Engineer-in-charge. | 14,754 | Each Sqm | 60 ₹8,85,240 | 40 ₹5,90,160 | 60 ₹8,85,240 | 75 ₹11,06,550 | 39.99 ₹5,90,012.46 Lowest | 41.7 ₹6,15,241.8 | 50 ₹7,37,700 | 55 ₹8,11,470 | 72 ₹10,62,288 | 40 ₹5,90,160 | 50 ₹7,37,700 | 150 ₹22,13,100 | 70 ₹10,32,780 | 85 ₹12,54,090 |
| 6.00 | Blinding the road surface with quarry dust including conveying the same by private trucks with loading at one end and unloading at the site, spreading the same over the road surface, including supply of all labour, T&P, tollage, royalties,taxes if any excluding GST etc. all complete as per direction of Engineer- in- charge. | 14,754 | Each Sqm | 0.1 ₹1,475.4 Lowest | 100 ₹14,75,400 | 70 ₹10,32,780 | 9 ₹1,32,786 | 3.5 ₹51,639 | 2 ₹29,508 | 4 ₹59,016 | 5 ₹73,770 | 6.9 ₹1,01,802.6 | 5 ₹73,770 | 3.8 ₹56,065.2 | 10 ₹1,47,540 | 10 ₹1,47,540 | 10 ₹1,47,540 |
| 7.00 | Supply, spreading and consolidating with PRR to required thickness of quarry dust at both side of road berm with all leads and lifts including transportation, loading and unloading, tollage, royalties, taxes, T&P, etc etc. all complete as per directed by Engineer-in-charge. | 163 | Each Cum | 300 ₹48,900 Lowest | 1,100 ₹1,79,300 | 2,200 ₹3,58,600 | 720 ₹1,17,360 | 600 ₹97,800 | 600 ₹97,800 | 500 ₹81,500 | 800 ₹1,30,400 | 1,000 ₹1,63,000 | 550 ₹89,650 | 646 ₹1,05,298 | 800 ₹1,30,400 | 1,000 ₹1,63,000 | 950 ₹1,54,850 |
Tender Value
₹1.1 Cr
Closing Date
27 Sept 2021, 5:00 pmClosed
S K SETHY,EE,BCD,PPT
S K SETHY,EE,BCD,PPT
Repair of roads at CISF new complex premises near Sandhakud area, Paradip
2021_MoS_647104_1
CE/BC/ACCTS-04/2021/330
Open Tender
Civil Works
Works
180 days
Paradip
Refer Tender Document and e-TCN
4 documents required · 4 mandatory
₹1,000
Yes
Building Construction Division,Engg Dept.,PPT
Exempted
26 Nov 2021
8 Sept 2021
29 Sept 2021
8 Sept 2021
27 Sept 2021
8 Sept 2021
Amount
Furrow cutting to the existing bituminous road surface upto 50mm depth as & where required, disposing the debrises 2KM away from work site with supplying of all labours, materials, machinery, special T&P , tollage, taxes if any excluding GST etc. all complete as required for the work and as directed by the Engineer-in-charge.
Supplying, all labour, materials , T&P for laying built up spray Grouting in layers applying tack coat of 3.00 kg of bitumen for 10.00 sqm using 0.50 of 25 mm to 40 mm size hard granite chrusher broken metal 15.00 kg of penetration grade 60/70 to 80/100 bitumen for 10.00 sqm in each layer with 0.13 cum of 12 mm size H.B.G chips as key stone for 10.00 sqm in each sreading over including cleaning the road surface by brushing removing debrises, heating pouring, spreading bitumen metal, chips and rolling with PRR of approved capacity including engagement, hire & running charges PRR & all other machineris, cost of all fuel & consumables, POL cost & conveyance charges of bitumen, metal chips hand packing to proper level pouring bitumen for uniformly penetration etc. all complete with with all cost of materials, labour, T&P,curing, tollage, royalties,transportation charges, engagement, hire & running charges of all machineries and cost & carriage of water including all testing charges etc. taxes excluding GST , etc. all complete as directed by Engineer-in Charge.
75.00 mm spray grouting
37.50 mm spray grouting
Supplying all materials and labour ,scrapping cleaning the road surface and providing 50mm thick bituminous macadam using (crusher broken)19mm nominal size hard granite metal, heating, pouring & spreading bitumen metal and rolling with PRR including running and hire charges of PRR ,all other machineries,fuel and consumables ,with supply of all materials, labour, T&P, royalties,tollages, hire & running charges of all machineries, transportation charges, all taxes excluding GST etc all complete as directed by the Engineer-in-charge.
Supplying all materials and labour, scrapping, cleaning the road surface and removing the debries within initial lead and lift and laying 20mm thick premix carpeting using 12mm graded hard granite chips (crusher broken) 0.27 cum of chips for 10 Sqm. as per IRC specification, heating the bitumen, conveying chips from stacks, mixing by any approved means at the rate of 1.59 Kg of bitumen for 0.0283 cum of chips, applying tack coat using 9.00 Kg of bitumen for 9.29 Sqm. spreading premix materials uniformly to required thickness including dressing, leveling to proper grade and camber rolling with PRR with running and hire charges of PRR, all other machineries, fuel and consumables, including cost of bitumen, T&P, tollage, royalties, taxes if any excluding GST etc. complete as per direction of Engineer-in-charge.
Supplying all materials, labour, cleaning the road surface and laying 6mm thick seal coat using 6mm size chips (Bajree) at the rate of 0.06cum/10Sqm. and as per IRC specification and for pre coating bitumen @6.8 Kg/10 Sqm. rolling with PRR including hire and running charge of PRR, including cost of bitumen, T&P, royalties, tollage, all taxes if any excluding GST etc. complete as per the direction of Engineer-in-charge.
Blinding the road surface with quarry dust including conveying the same by private trucks with loading at one end and unloading at the site, spreading the same over the road surface, including supply of all labour, T&P, tollage, royalties,taxes if any excluding GST etc. all complete as per direction of Engineer- in- charge.
Supply, spreading and consolidating with PRR to required thickness of quarry dust at both side of road berm with all leads and lifts including transportation, loading and unloading, tollage, royalties, taxes, T&P, etc etc. all complete as per directed by Engineer-in-charge.
M/S BHAIRAB CHARAN SWAIN
Harihar Nayak
Nilamani Swain
Manoj Kumar Nayak
S.S. CONSTRUCTION CO.
M/s. Jay Jagannath Enterprises
NIRANJAN SAHOO
SUSANTA KUMAR SWAIN
Ms Bichitra Kumar Jena
M/s. Magu Charan Nayak
PADMABATI INFRAPROJECTS PVT. LTD.
M/S TRIBHUBAN DAS
Aakar Infra Engineers PVT Ltd
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_681118.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .