| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.4 CrRejected-Finance | ₹1.4 Cr | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹1.4 CrRejected-Finance | ₹1.4 Cr | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹1.4 CrRejected-Finance | ₹1.4 Cr | L4 | Rejected-Finance Other than L1 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Complete documents as asked vide tender specification of Instructions on filling and submission of tender not found enclosed |
| Sl No | Description | Qty | Unit | Emm Gee Tradres L1 | Munish Enterprises L2 | parveen trading company L4 | Kanchan Traders L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Lumpsum price worked out by the contractor for Prefabricated Living Shelter (10 Men) of Size 10 m x 6.1 m and 2.6 m clear height up to ceiling with one side verndah of width 1.2 m. Steel Columns, trusses, Purlins for Structure as per specification and drawing listed in Schedule 'A' Part -I | 6 | Nos | 8,17,995 ₹49,07,970 | 8,82,128 ₹52,92,768 | 2,60,577 ₹15,63,462 Lowest | 8,85,715 ₹53,14,290 |
| 2.00 | Lumpsum price worked out by the contractor for Living Shelter (10 Men) of 10 m x 6.1 m and 2.6 m clear height up to ceiling with one side verndah of width 1.2 m, Foundation , Flooring, Plinth Protection and Pathway for Construction Material as per specification and drawing in Schedule 'A' Part II | 6 | Nos | 2,92,250 ₹17,53,500 | 3,22,425 ₹19,34,550 | 2,60,577 ₹15,63,462 Lowest | 3,20,700 ₹19,24,200 |
| 3.00 | Lumpsum price worked out by the contractor for Living Shelter (10 Men) of 10 m x 6.1 m and 2.6 m clear height up to ceiling with one side verndah of width 1.2 m, for Internal Electrification & services as per specification in Schedule 'A' Part III | 6 | Nos | 43,975 ₹2,63,850 Lowest | 47,615 ₹2,85,690 | 2,60,577 ₹15,63,462 | 48,850 ₹2,93,100 |
| 4.00 | Lumpsum price worked out by the contractor for Living Shelter (10 Men) of 10 m x 6.1 m and 2.6 m clear height up to ceiling with one side verndah of width 1.2 m, for Furniture Items as per specification in Schedule 'A' Part IV | 6 | Nos | 2,49,500 ₹14,97,000 Lowest | 2,78,740 ₹16,72,440 | 2,60,577 ₹15,63,462 | 2,75,500 ₹16,53,000 |
| 5.00 | Lumpsum price worked out by the contractor for Living Shelter (10 Men) of 10 m x 6.1 m and 2.6 m clear height up to ceiling with one side verndah of width 1.2 m, for Earthing, Lightning conductor & Misc as per specification in Schedule 'A' Part V | 6 | Nos | 14,900 ₹89,400 Lowest | 15,890 ₹95,340 | 2,60,577 ₹15,63,462 | 16,900 ₹1,01,400 |
| 6.00 | Lumpsum price worked out by the contractor for Constr of Toilet Cum Bathing Cubicle by using Pre-fab colns, Trusses,wall of PUF panel for Structure as per specification and drawing listed in Schedule 'A' Part -1 | 6 | Nos | 2,86,900 ₹17,21,400 | 2,95,720 ₹17,74,320 | 2,60,577 ₹15,63,462 Lowest | 2,97,800 ₹17,86,800 |
| 7.00 | Lumpsum price worked out by the contractor for Constr of Toilet Cum Bathing Cubicle by using Pre-fab colns, Trusses,wall of PUF panel for Construction Material as per specification and drawing listed in Schedule 'A' Part -2 | 6 | Nos | 1,55,698 ₹9,34,188 Lowest | 1,59,707 ₹9,58,242 | 2,60,577 ₹15,63,462 | 1,68,725 ₹10,12,350 |
| 8.00 | Lumpsum price worked out by the contractor for Constr of Toilet Cum Bathing Cubicle by using Pre-fab colns, Trusses,wall of PUF panel for Plumbing & Sanitary Items as per specification and drawing listed in Schedule 'A' Part -3 | 6 | Nos | 2,25,875 ₹13,55,250 Lowest | 2,26,500 ₹13,59,000 | 2,60,577 ₹15,63,462 | 2,27,690 ₹13,66,140 |
| 9.00 | Lumpsum price worked out by the contractor for Constr of Toilet Cum Bathing Cubicle by using Pre-fab colns, Trusses,wall of PUF panel for Electrical Items,Internal Electrifications and miscellaneous items as per specification and drawing listed in Schedule 'A' Part -4 | 6 | Nos | 85,715 ₹5,14,290 Lowest | 89,875 ₹5,39,250 | 2,60,584 ₹15,63,504 | 87,725 ₹5,26,350 |
| 10.00Note: In case doubling/duplicancy of BOQ items , the lowest quoted rate shall be applicable for payment. | |||||||
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
23 May 2026, 6:00 pmClosed
Commanding Officer
113 Engineer Regiment Firozepur Punjab-152001
Material and labour for construction of 06 x Living Shelter (10 Men) with Toilet Cum Bathing Cubicle in Ferozepur
2026_ARMY_764373_1
4147/OT/10 MEN TBBC/26-27 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
Firozepur
As per Tender Documents
7 documents required · 7 mandatory
₹0
₹2.0 L
Firozepur
15 Jun 2026
9 May 2026
29 May 2026
9 May 2026
23 May 2026
16 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lumpsum price worked out by the contractor for Prefabricated Living Shelter (10 Men) of Size 10 m x 6.1 m and 2.6 m clear height up to ceiling with one side verndah of width 1.2 m. Steel Columns, trusses, Purlins for Structure as per specification and drawing listed in Schedule 'A' Part -I | 6 | Nos | - | - |
| 2 | Lumpsum price worked out by the contractor for Living Shelter (10 Men) of 10 m x 6.1 m and 2.6 m clear height up to ceiling with one side verndah of width 1.2 m, Foundation , Flooring, Plinth Protection and Pathway for Construction Material as per specification and drawing in Schedule 'A' Part II | 6 | Nos | - | - |
| 3 | Lumpsum price worked out by the contractor for Living Shelter (10 Men) of 10 m x 6.1 m and 2.6 m clear height up to ceiling with one side verndah of width 1.2 m, for Internal Electrification & services as per specification in Schedule 'A' Part III | 6 | Nos | - | - |
| 4 | Lumpsum price worked out by the contractor for Living Shelter (10 Men) of 10 m x 6.1 m and 2.6 m clear height up to ceiling with one side verndah of width 1.2 m, for Furniture Items as per specification in Schedule 'A' Part IV | 6 | Nos | - | - |
| 5 | Lumpsum price worked out by the contractor for Living Shelter (10 Men) of 10 m x 6.1 m and 2.6 m clear height up to ceiling with one side verndah of width 1.2 m, for Earthing, Lightning conductor & Misc as per specification in Schedule 'A' Part V | 6 | Nos | - | - |
| 6 | Lumpsum price worked out by the contractor for Constr of Toilet Cum Bathing Cubicle by using Pre-fab colns, Trusses,wall of PUF panel for Structure as per specification and drawing listed in Schedule 'A' Part -1 | 6 | Nos | - | - |
| 7 | Lumpsum price worked out by the contractor for Constr of Toilet Cum Bathing Cubicle by using Pre-fab colns, Trusses,wall of PUF panel for Construction Material as per specification and drawing listed in Schedule 'A' Part -2 | 6 | Nos | - | - |
| 8 | Lumpsum price worked out by the contractor for Constr of Toilet Cum Bathing Cubicle by using Pre-fab colns, Trusses,wall of PUF panel for Plumbing & Sanitary Items as per specification and drawing listed in Schedule 'A' Part -3 | 6 | Nos | - | - |
| 9 | Lumpsum price worked out by the contractor for Constr of Toilet Cum Bathing Cubicle by using Pre-fab colns, Trusses,wall of PUF panel for Electrical Items,Internal Electrifications and miscellaneous items as per specification and drawing listed in Schedule 'A' Part -4 | 6 | Nos | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
Tender4147.pdf
Tender Documents • 3.23 MB
BOQ_856136.xls
BOQ • 1.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].