Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25.9 LAccepted-AOC | ₹25.9 L | 1 | Accepted-AOC FDR accpted |
| 2 | 2₹29.6 LRejected-Finance | ₹29.6 L | 2 | Rejected-Finance 2 |
| 3 | 3₹30.7 LRejected-Finance NIVASI BALASINGHKHEDA POST KARORA DISTRICT LUCKNOW LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹30.7 L | 3 | Rejected-Finance 3 |
| 4 | 4₹30.7 LRejected-Finance 12 471 CHURCH ROAD KANPUR GWALTOLI KANPUR NAGAR UTTAR PRADESH 208001 | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹30.7 L | 4 | Rejected-Finance 4 |
| Sl No | Description | Qty | Unit | M/S Kamlesh Kumar Singh L2 | M/S J.P. INTERPRISES L3 | M/S ABHAY DATA CONSTRUCTION L1 | M/S ROHIT ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in constructing channels manually or by any other means where ever possible and applicable, escape of above 01 Cumecs discharge including hard clay, charri bajri upto 5% lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles. | 337.5 | M3 | 65 ₹21,937.50 | 180 ₹60,750 | 90 ₹30,375 | 90 ₹30,375 |
| 1.02 | Earthwork in excavation in foundation including chharri-bajari, wet earth, slush kanker which is not separable i.e. all type of soils including dewatering with all leads, lifts, labour, T&P and proper disposal etc complete. | 383.75 | M3 | 78 ₹29,932.50 | 180 ₹69,075 | 110 ₹42,212.50 | 100 ₹38,375 |
| 1.03 | Providing and laying plain cement concrete A20-M15 mix (1:2:4) Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material labour T&P and dewatering if any etc. but excluding centering and shuttering to complete the job to complete the jobas per sanctioned drawing and in the direction of Engineer- In - Charge Per cum. | 15.72 | M3 | 7,500 ₹1.2 L | 6,800 ₹1.1 L | 6,600 ₹1.0 L | 7,000 ₹1.1 L |
| 1.04 | Providing and laying plain cement concrete A20-M 20 mix (1:1.5:3) Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material labour T&P and dewatering if any etc. but excluding centering and shuttering to complete the job to complete the jobas per sanctioned drawing and in the direction of Engineer- In - Charge Per cum. | 56.15 | M3 | 8,500 ₹4.8 L | 7,800 ₹4.4 L | 7,700 ₹4.3 L | 8,500 ₹4.8 L |
| 1.05 | Providing and Laying A20-M25 mix (1:1:2) Reinforced Cement Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material, labour & T&P required for proper completion of work but excluding centering and shuttering to complete the job as per sanctioned drawing and in the direction of Engineer- In - Charge Per cum. | 46.38 | M3 | 8,500 ₹3.9 L | 9,100 ₹4.2 L | 8,300 ₹3.8 L | 10,463 ₹4.9 L |
| 1.06 | Centering & Shuttering of RCC work including rent of shuttering material labour & T&P required for proper completion of work in Sqm. | 339.33 | M2 | 800 ₹2.7 L | 800 ₹2.7 L | 725 ₹2.5 L | 906 ₹3.1 L |
| 1.07 | Providing bending, binding, and placing of reinforcement Fe-500 / Fe-550 TMT deformed bars conforming to IS code to complete all respect including cost of material , labour, binding wire, T&P etc. per M.T | 8.05 | MT | 1,09,000 ₹8.8 L | 78,000 ₹6.3 L | 78,500 ₹6.3 L | 1,09,512.2 ₹8.8 L |
| 1.08 | Providing and fixing of P.V.C.Pipe 75 mm dia 1.0 m c/c ,average length 0.60 m each for drainage spout and weep hole pipe. | 42.8 | Rm. | 60 ₹2,568 | 110 ₹4,708 | 60 ₹2,568 | 74 ₹3,167.20 |
| 1.09 | Earth work in restoring canal section or drain section and dismentalling of diversion after construction of pacca work including all initial lead and lift , all labour and T&P with proper dressing to profile per Cum. | 652.9 | M3 | 65 ₹42,438.50 | 210 ₹1.4 L | 61 ₹39,826.90 | 50 ₹32,645 |
| 1.10 | Hiring charges of 5 KV Gen set Including operator and P.O.L. for 8 hours running in night time. (Unit per day) | 30 | PER DAY | 1,200 ₹36,000 | 1,700 ₹51,000 | 1,100 ₹33,000 | 1,000 ₹30,000 |
Tender Value
₹33.2 L
EMD Value
₹3.3 L
Closing Date
14 Feb 2026, 5:00 pmClosed
EE
ee rdsc
jamodi mr km 1.455 par jalsetu nirman ka karya lot 02
2026_UPIDC_1107000_2
3993/rkd/notice08/ lot 2
Open Tender
Civil Works - Canal
60 days
raebareli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,590
₹3.3 L
Yes
30 Mar 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
14 Feb 2026
9 Feb 2026
Earth work in constructing channels manually or by any other means where ever possible and applicable, escape of above 01 Cumecs discharge including hard clay, charri bajri upto 5% lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles.
Earthwork in excavation in foundation including chharri-bajari, wet earth, slush kanker which is not separable i.e. all type of soils including dewatering with all leads, lifts, labour, T&P and proper disposal etc complete.
Providing and laying plain cement concrete A20-M15 mix (1:2:4) Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material labour T&P and dewatering if any etc. but excluding centering and shuttering to complete the job to complete the jobas per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Providing and laying plain cement concrete A20-M 20 mix (1:1.5:3) Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material labour T&P and dewatering if any etc. but excluding centering and shuttering to complete the job to complete the jobas per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Providing and Laying A20-M25 mix (1:1:2) Reinforced Cement Concrete with OPC cement, Kabrai quarry Stone ballast (size 4.75 - 20 mm) & Banda c-sand (F.M 1.5 - 2.0) complete in all respect including all cost of material, labour & T&P required for proper completion of work but excluding centering and shuttering to complete the job as per sanctioned drawing and in the direction of Engineer- In - Charge Per cum.
Centering & Shuttering of RCC work including rent of shuttering material labour & T&P required for proper completion of work in Sqm.
Providing bending, binding, and placing of reinforcement Fe-500 / Fe-550 TMT deformed bars conforming to IS code to complete all respect including cost of material , labour, binding wire, T&P etc. per M.T
Providing and fixing of P.V.C.Pipe 75 mm dia 1.0 m c/c ,average length 0.60 m each for drainage spout and weep hole pipe.
Earth work in restoring canal section or drain section and dismentalling of diversion after construction of pacca work including all initial lead and lift , all labour and T&P with proper dressing to profile per Cum.
Hiring charges of 5 KV Gen set Including operator and P.O.L. for 8 hours running in night time. (Unit per day)
Providing and fixing 5 HP capacity diesel pump for dewatering in foundation of Syphon.
Providing Earth filled gunny bags with poperly sewing with sutli and placed at proper place as per direction of Engineer-In-Charge to complete the work
Supplying and placing Bamboo khunta and braces of 60 to 80 mm dia. including all cost of material ,labour and T&P . As per direction of Engineer-In-Charge to complete the work.
Boring with 100 mm casing including lowering of casing assembling and extracting casing pipe with contractor T & P and equipment upto 32 M. per R.M.
Making Sub grade in lining work including watering, compection and preparation of surface.
Brick masonry in 1:4 C.M with OPC cement and banda c-sand (F.M 1.5 - 2.0) mortar using M-150 class Bricks complete in all respect including all lead, lifts, all cost of material, labour, curing ,T&P required for proper completion of work as per sanctioned drawing & specification in the direction of Engineer-In -Charge. (Unit Cum.)
Preparation of sand/silt bed for pannel construction after compaction and to achieve 65%relative density at OMC including all materials ,labour etc compelet in respect as per drawing and specification in cum.
10 mm thick brick cement plaster on brick massonary in 1:4 cement sand mortar with floated neat cement including all cost of materials, labour and T&P etc. as per drawing & specification in SQM.
Providing brick lining in on edge with 1:3 cement sand mortar complete in all respect including all material, labour, curing, T&P required for proper completion of work as per drawing and specification in sq.m.
Dry earth filling for Dismentalling divert drain, including manual compaction, dressing, lead upto 30 m & lift upto 1.5 m in building and Masonry works.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_2063471.xls
BOQ • 0.30 MB
BD1.pdf
Tender Documents • 1.57 MB
retendarjamodi.pdf
Additional Documents • 0.11 MB
Download all tender documents and submit your bid