Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.0 LAdmitted-Finance | -33.60% | ₹12.0 L | L1 | Admitted-Finance |
| 2 | L2₹12.6 L+₹64,804.71 (5.42%)Admitted-Finance | -30.00% | ₹12.6 L+₹64,804.71 (5.42%) | L2 | Admitted-Finance |
| 3 | L3₹12.6 L+₹64,984.72 (5.44%)Admitted-Finance | -29.99% | ₹12.6 L+₹64,984.72 (5.44%) | L3 | Admitted-Finance |
| 4 | L4₹12.8 L+₹88,926.46 (7.44%)Admitted-Finance | -28.66% | ₹12.8 L+₹88,926.46 (7.44%) | L4 | Admitted-Finance |
| 5 | L5₹13.1 L+₹1.1 L (9.61%)Admitted-Finance | -27.22% | ₹13.1 L+₹1.1 L (9.61%) | L5 | Admitted-Finance |
Tender Value
₹18 L
EMD Value
₹36,000
Closing Date
25 May 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_309867_5
e-NIT No.13 of 2026-27 Dated 13-05-2026
Open Tender
Civil Works
Percentage
90 days
SURANKOTE
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹36,000
11 Jun 2026
13 May 2026
26 May 2026
13 May 2026
25 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: All kinds of soil : | 45.98 | Cum | 479.3 | ₹22,038.21 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Crushed . | 10.82 | Cum | 5,202.9 | ₹56,295.38 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 10.84 | Cum | 7,275.25 | ₹78,863.71 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 26.17 | Cum | 6,591.25 | ₹1,72,493.01 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) & Extra for brick work with common burnt clay bricks /cement concrete bricks in superstructure above plinth level upto floor five level. | 16.94 | Cum | 9,027.2 | ₹1,52,920.77 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size). | 2.68 | Cum | 9,395.7 | ₹25,180.48 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 17.98 | Cum | 9,821.85 | ₹1,76,596.86 |
| 8 | Reinforcement for RCC work including straightening cutting, bending, placing in position & binding all complete with TMT bars. | 3,465 | Kg | 123.2 | ₹4,26,888 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 99.58 | Sqm | 286.35 | ₹28,514.73 |
| 10 | Centring and Shuttering including strutting, propping etc and removal of form work for Suspended floors, roofs, landings, balconies and access platform. | 79.8 | Sqm | 718.2 | ₹57,312.36 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.74 MB
BOQ_1002842.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .