Loading…
Loading…
Tender Value
₹37.7 L
EMD Value
₹89,000
Closing Date
9 Sept 2026, 5:00 pm
Senior Manager (E) ED-IV
A-1/4 Lakhanpur, Kanpur
Annual Maintenance Contract of street light and high mast for 3 years at I.A. Bhuragarh Distt. Banda and Bargarh Distt. Chitrkoot.
2026_SIDC_1178267_1
ED_IV_147_03082026
Open Tender
Electrical Works
Percentage
1095 days
Bhuragarh Distt. Banda
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,295
UPSIDA
₹89,000
20 Aug 2026
20 Aug 2026
10 Sept 2026
20 Aug 2026
9 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Charges for maintenance ,proper watch and ward of entire electrical system of Street Light and High Mast Tower,cables,conductors,poles,panels etc and all other available material as per direction of engineer in charge for road lightng in IA to cover the general supervision for execution of work including dismantling and re fixing of all street light of UPSIDA during the period of AMC for 12 months (01 Electrican and 01 Helper for Each Site X 2=Rate taken form as per HO order UPSIDA Electrican 14498.00 + Helper11029.87=25527.87*2=51055.74per month for 2 site) as per complete. | 36 | month | 51,055.74 | ₹18,38,006.64 |
| 0_) | Dismantling & re-grouting of Street liht 12 Tilt/sick bend/STP pole in 1:3:6 ratio cement concrete with stone pad including stranthening of pole by providing additional 04 nNo. Support of 65X65X6mm or higher size MS angle in suitable length with the help of welding/cutting . | 50 | No | 1,027 | ₹51,350 |
| 0_) | Lowring / Lifting of 30/16/12.5 Mtr. High mast lighting system complete in T&P men & material required proper completion of work etc. | 12 | No | 2,500 | ₹30,000 |
| 0_) | S/F of Trailing Cable for High Mast lighting system complete including all T&P men and material required for proper completion of work . | 3 | No | 23,500 | ₹70,500 |
| 0_) | S/Oiling of winch machine for High Mast lighting system complete including all T&P men and material required for proper completion of work . | 12 | Ltr | 500 | ₹6,000 |
| 0_) | Supply & Fixing of Male-Femal plug & socket for Hight Mast lighting system complete including all T&P men material required for proper completion of work as complete in all respect. | 8 | Nos | 6,170 | ₹49,360 |
| 0_) | Painting of S.T.poles and all mountings on it with two coats of aluminium paint with an under coat of red oxide paint on length of the up to 10 m support above the ground level or as per direction of Engineer in charge of work/site including all T&P,men & material for proper completion of work. | 150 | No | 324 | ₹48,600 |
| 0_) | Painting letters (Pole no.) 2.5 cm upto 8.0 cm size complete on street light pole/panel/other electrical properties under UPSIDA including cost of all material men and T&P complete in all respect as per complete. | 150 | No | 10 | ₹1,500 |
| 0_) | S/F of 6 Amp.To 32 Amp. SP MCB (10KA) C curve Cat-B complete in all respect. (1st year =50%, 2nd year=25%, 3rd year=25%) | 30 | No | 206 | ₹6,180 |
| 0_) | S/F of 63 Amp. 4Pole MCB (10KA) C curve Cat-B complete in all respect.(1st year =50%, 2nd year=25%, 3rd year=25%) | 5 | No | 1,720 | ₹8,600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
etenderdocuments.pdf
Tender Documents • 0.44 MB
FEEFORMAT.xls
Tender Documents • 0.03 MB
BOQ_2214125.xls
BOQ • 0.30 MB
AMCgeneraltermsandconditions.pdf
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].