Tender Value
₹32.7 L
EMD Value
₹32,705
Closing Date
15 Jul 2026, 5:30 pm4d left
Project Administrator ITDA Paralakhemundi,GAJAPATI
Project Administrator ITDA Paralakhemundi, GAJAPATI
Construction of Staff Qtr at Tarava Colony AS under Gumma Block
2026_STSCD_133175_18
ITDAPKD/01/2026-27
Open Tender
Civil Works - Buildings
180 days
TARAVA COLONY
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹32,705
Yes
30 Jun 2026
30 Jun 2026
17 Jul 2026
30 Jun 2026
15 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fly Ash Brick Masonry in cement mortar of mix (1:6) using Fly Ash bricks of size 23cm x 11 cm x 8 cm in Superstructure having crushing strength not less than 75 kg per square c.m, with cement and screened & washed sharp sand for mortar after immersing the bricks for 6 (Six) hours in water before use in works with all necessary projections, splays cuffing, circular moulding, corbelling, chamfering, watering and curing etc. including cost, coveyance.stacking. loading, uriloading, royalties, all taxes cost of all labour Labour cess scaffolding, sundries and T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge.
1st Floor | 88 | Cum. | 6,329.92 | ₹5,57,032.96 |
| 2 | Providing and laying in position ready mixed M20 grade concrete having compressive strength at 28 days test not lessthan 250kg/sq.cm for reinforced cement concrete work using cement content as per approved design mix etc including Rigid & smooth centering and shuttering.
RCC Plinth /Grade Beam First Floor | 3.03 | Cum. | 7,884.47 | ₹23,889.94 |
| 2.01 | RCC Coloumn First Floor | 5.15 | Cum. | 21,254.92 | ₹1,09,462.84 |
| 2.02 | RCC Beam First Floor | 10.44 | Cum. | 21,254.92 | ₹2,21,901.36 |
| 2.03 | RCC Stair Case | 2.5 | Cum. | 18,188.75 | ₹45,471.88 |
| 2.04 | RCC Lintel First Floor | 1.28 | Cum. | 18,188.75 | ₹23,281.6 |
| 2.05 | RCC Chajja First Floor | 18 | sqm | 1,274.25 | ₹22,936.5 |
| 2.06 | RCC Roof Slab First Floor | 20.62 | Cum. | 15,953.43 | ₹3,28,959.73 |
| 3 | Supplying HYSD/Tor steel reinforcement from SAIL,VIZAG STEEL OR TATA STEEL brand of required diameter of approved quality including Labour charges for cutting, bending, binding and tying the grills and placing in position including cost, conveyance & taxes of reinforcements confirming to ISI standard and binding wire 18 to 20 gauge and as per drawing, design etc. complete as per the direction of Engineer-in-Charge.
First Floor | 54.54 | Qtl | 8,876.1 | ₹4,84,102.49 |
| 4 | 12 mm thick cement plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing for seven days with cost, conveyance, royality taxes of all materials, labour, T & P required for the work etc. Complete as per the direction of Engineer-in-Charge.
First Floor | 180.49 | sqm | 203.68 | ₹36,762.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_598426.xls
BOQ • 0.32 MB
DTCN.pdf
Tender Documents • 2.78 MB
Download all tender documents and submit your bid