Loading…
Loading…
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
24 Aug 2026, 6:00 pmDue today
GE AF TUGHLAKABAD
GE AF TUGHLAKABAD SANGAM VIHAR PO NEW DELHI 110080
TERM CONTRACTS FOR ARTIFICERS WORKS TO BLDG AT VAYUSENABAD AF STN TUGHLAKABAD UNDER GE (AF) TUGHLAKABAD
2026_MES_781066_1
GE/TKD-17 of 2026-27
Open Tender
Civil Works
Item Rate
365 days
AF Stn Tughlakabad
AS per NIT conditions
7 documents required · 7 mandatory
₹500
GE (AF) Tughlakabad
₹50,000
24 Aug 2026
27 Jul 2026
26 Aug 2026
27 Jul 2026
24 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | To execute the work as per condition 4(A) of IAFW-2249 and as specified in MES SSR-2009 (Part-I) specifications priced at par SSR 2020 (Part-II) rates with errata/amendments subject to quoted percentage by the tenderer the work shall be carried out as per work order (s) placed by Engineer-in-Charge within the period of 365 days from the date of acceptance of tender.
OR
At such other rates as may be fixed under the provision of condition 62 of “General conditions of contracts (IAFW-2249)” 1989 print with errata/ amendments as applicable.
Notes :-
(i) Tenderers shall insert percentage rate at Column 6 (Six) of this BOQ.
(ii) Tender shall refer and select the option excess (+) or less (-) available at Column 6 (Six) of this BOQ to quote the percentage above/below MES Standard Schedule of rates. The percentage quoted by tenderer shall be made applicable for acceptance while publishing the acceptance letter.
(iii) Amount inserted by the MES under rate Col and the total amount reflected in the page is a rough guidance and for reference only. Similarly the quoted amount worked out (based on percentage rate quoted by contractor) shall also be treated as rough and reference only. The acceptance of tender placed on contractor shall be adjusted by percentage rate quoted by the contractor over /below the rates contained in MES standard Schedule of rates 2020 Part-II.
(iv) Contractors special attention is invited to condition “4(A) Works to be carried out (Applicable only to term contracts)” and condition “56 Termination of contract (Applicable only to term contracts)” of “General condition of contracts (IAFW-2249)”. The provisions of these conditions of “General conditions of contracts (IAFW-2249) are to be strictly followed.
(v) Irrespective of quoted amount generated by the system in the BOQ, Acceptance of Contract shall be made for the total estimated amount and percentage (Plus/Minus) quoted by the tenderer. | - | As per MES Schedule Part-II, 2020 & Part-I, 2009 | 25,00,000 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tender.pdf
Tender Documents • 1.00 MB
BOQ_874976.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].