Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
₹4.1 L
EMD Value
₹8,169
Closing Date
7 Sept 2026, 10:00 amClosed
Executive Engineer
HP PWD Division
RRD on Bh Gaahar
2026_PWD_142410_1
11784-86
Open Tender
Civil Works - Roads
Percentage
30 days
Bhderawaar
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹8,169
7 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm (Thirty centimetre) in depth, 1.5 m (One point five five) metrein width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil including carriage of materials with in all leads and lifts and direction of Engineer- in- Charge. | 13.5 | Per cubic metre | 200 | ₹2,700 |
| 2 | Stone soling properily hand packed filling interstices with khranja stone and consolidating with power road rollar to the required gradient and camber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification.100mm ( one hundred milimetre ) spread thickness (finished work including materials and labour) including carriage of materials within all leads and lifts and other incidentals. | 22.5 | Per Cubic Metre | 2,000 | ₹45,000 |
| 3 | Providing and laying reinforced cement concrete 1:1.5:3 (one cement : one and half sand : three graded crushed stone aggregate 20mm ( twenty millimetre) nominal size) in super structure complete as per drawing and MORD technical specification clause 802,1205.4 and 1205.5 including cost of form work for plain/ reinforced concrete M25 work including carriage of material within all leads, lifts and other incidental charges. | 48.75 | Per cubic metre | 7,400 | ₹3,60,750 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
SBD.pdf
Tender Documents • 6.49 MB
BOQ_211579.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .