| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Finance | -6.78% | ₹4.1 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 L+₹9,801.23 (2.39%)Admitted-Finance | -4.55% | ₹4.2 L+₹9,801.23 (2.39%) | L2 | Admitted-Finance |
| 3 | L3₹4.2 L+₹12,438.33 (3.04%)Admitted-Finance | -3.95% | ₹4.2 L+₹12,438.33 (3.04%) | L3 | Admitted-Finance |
Tender Value
₹4.4 L
EMD Value
₹43,952
Closing Date
3 Sept 2026, 12:00 pmClosed
Chief Engineer civil
NAGAR NIGAM AGRA
Zone 1, Ward No. 78, Motiganj Construction work on a damaged chamber on the main road in Chhatta Bazar and on a culvert near Jai Bajrang Rice in Motiganj market.
2026_DOLBU_1180599_1
03-08-2026/NAGAR NIGAM AGRA/03-09-2026/178
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Nagar Nigam
₹43,952
21 Sept 2026
29 Aug 2026
3 Sept 2026
29 Aug 2026
3 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30m form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) | 15.34 | Cum | 150 | ₹2,301 |
| 2 | Removal of sludge, kankar, brick bats, organic or inorganic material in faul position or in liquid mud including lead 30m and 3.00 meter lift with specials T&P labour etc. all complete. | 15.34 | Cum | 239 | ₹3,666.26 |
| 3 | Providing and fixing of barricading of 100mm average ballies with in a distance of 1.50 meter for 3 rows of 3Q. 3 Nosof cross ballies, two supporting ballies of 3 meter ballies and 2 Nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including labour component (material will be property of contractor after dismantling). | 60 | Rmt | 225 | ₹13,500 |
| 4 | Cartage of Ballast, Kankar, Coal, Grit or Sand etc, including loading and unloading but excluding stackings on pucca roads. (Chapter No.3Si.No.8)8km. | 27.6 | Cum | 230.1 | ₹6,350.76 |
| 5 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. ( Chapter No. 06 S.I. No. 2) | 20.58 | Cum | 5,650 | ₹1,16,277 |
| 6 | Providing and laying cement concrete in 1:5:10 (1 cement :5 fine sand 10 stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter S.I. No. 01) | 3.07 | Cum | 5,325 | ₹16,347.75 |
| 7 | 12mm cement plaster in single coat on rough site of single of half brick wall for interior plastering up to floor to level including internal rounded angles not excluding 80mm in girth and finished even and smooth.
(b) 1cement : 6 Coarse sand.
(Chapter No.13 Si.No. 2) | 31.95 | Sqm | 200 | ₹6,390 |
| 8 | Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (2 cm. Nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors. (5-Chapter S.I.NO6) | 1.29 | Cum | 6,600 | ₹8,514 |
| 9 | RCC work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) Ch-5 SI No- 5.1.2 | 12.38 | Cum | 8,200 | ₹1,01,516 |
| 10 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level.
(b) 10mm to 12mm tor.
(Chapter No. 10 S.I. No. 504(B)) | 15 | Qtl | 8,500 | ₹1,27,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.81 MB
BOQ_2219888.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .