Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -40.00% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 LAdmitted-Finance | -37.77% | ₹1.5 L | L2 | Admitted-Finance |
| 3 | L3₹1.6 LAdmitted-Finance | -32.25% | ₹1.6 L | L3 | Admitted-Finance |
| 4 | L4₹1.7 LAdmitted-Finance | -31.11% | ₹1.7 L | L4 | Admitted-Finance |
| 5 | L5₹2.1 LAdmitted-Finance | -15.00% | ₹2.1 L | L5 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,860
Closing Date
9 Feb 2026, 6:00 pmClosed
Executive Engineer REW Jammu
Executive Engineer REW Jammu
Const. of culvert near the House of Ashok Kumar Verma, W.NO.2 at D9 Pyt. Pahariwala Block Khour. UNDER THE CDF FUND FOR THE YEAR 2025-26,
2026_RDPR_301386_2
e-NIT No. 773- REWJ of 2025-26 dated 24-01-2026
Open Tender
Civil Works
Executive Engineer REW Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH 0515
₹4,860
10 Feb 2026
27 Jan 2026
10 Feb 2026
27 Jan 2026
9 Feb 2026
27 Jan 2026
Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc(not exceeding 1.5m in width)including dressing of sides and ramming of bottom lifts upto 1.5m inc. getting out excavated earth and disposal of surplus excavated earth as directed:in all kinds of soil
P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level.
P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level.
Reinforced cement concrete including curing but excluding the cost of centering,shuttering and reinforcement withl 1:1.5:3 (1 Cement:1.5 Coarse sand:3 Graded stone aggregate 20mm nominal size)
Steel Reinforcement for RCC Work including straightening,cutting,bending, placing in position and binding all complete above plinth level . Cold twisted bars
Centring & shuttering including strutting, propping etc. and removal of the formwork. FOR FOUNDATION , PLINTH , PIERS ETC.
Centring & shuttering including strutting, propping etc. and removal of the formwork FOR Suspended floor
Centring & shuttering including strutting, propping etc. and removal of the formwork FOR Edges of slab Above 20 cm wide
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate.
Head load For Sand for 150 mt.
Carriage of constructed material FOR Sand 05 KM by MT
Head Load for Aggregate for 150 mt.
Carriage of constructed material FOR Aggregate 05 KM by MT
ADD COST OF SIGN BOARD =
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_977880.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid