office of the executive engineer rew ang
office of the executive engineer rew ang
CO CULVERT AT GURGANDAN SHEIKHPORA NHO AB RASHID SHAH ANANTNAG
2026_RDPR_324181_63
ENIT107of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹6,000
10 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
16 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance by the way of engagement of labors including cutting of shrubs removal of muck from drain etc.(subject to actual) | 1 | lab | 625 | ₹625 |
| 2 | Earthwork in excavation by manual means over areas (exceeding 30 cm in depth,1.5 mtr in width as well as 10 sqm on plan)ncluding d disposal of earth, lead upto 50 m and lift upto 1.5 m in -All kinds of soil | 2.97 | cum | 479.3 | ₹1,423.52 |
| 3 | P/L of Stone soling including tamping manually incl carriage lead complete.including plums | 2.7 | cum | 1,000 | ₹2,700 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6(1 cement : 3 coarse sand : 8 graded stone aggregate 20 mm nominal size) | 9.12 | cum | 5,733.6 | ₹52,290.43 |
| 5 | Providing and laying in reinforced position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:1.5:3 (1 cement : 1.5 coarse sand : 3graded stone aggregate 20 mm nominal size) | 5.44 | cum | 9,821.85 | ₹53,430.86 |
| 6 | Reinforcement for RCC workincluding straightening,bending cutting,placing in position (all complete) | 5.44 | qtl | 9,285 | ₹50,510.4 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work forFoundations, footings, bases for columns | 30.86 | sqm | 628.95 | ₹19,409.4 |
| 8 | sand /bajri 30Km by MT | 19.79 | cum | 592.24 | ₹11,720.43 |
| 9 | Steel / cement/steel etc | 2 | trip | 1,000 | ₹2,000 |
| 10 | Filling of quarry muckh into approches and behind abuts I/C H/Load of materials | 1 | l/s | 4,900 | ₹4,900 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1093290.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .