Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance DIV 151 UNIT 34 ZONE 11 | CHENNAI | CHENNAI | TAMIL NADU | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance NO 90 NADUTHEGU NAROLAI VANAPURAM CIRCLE KALLAKURICHI 606205 | KALLAKURICHI | KALLAKURICHI | TAMIL NADU | 606205 | Not Admitted-Fee/PreQual/Technical/Finance Due to EMD related issues |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
5 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commissioner Tambaram City Municipal Corporation
No.1, Kalivani Street, Kamarajapuram, Chennai-73
Construction of Cut and Cover SWD at Babu Street to Balaji Avenue Near Sembakkam Chitlapakkam Main Road in Ward No.43 in Zone 3
2022_MAWS_249101_1
558/2022/E1
Open Tender
Civil Works
Works
60 days
Tambaram city municipal corporation sembakkam
Construction of Cut and Cover SWD at Babu Street to Balaji Avenue Near Sembakkam Chitlapakkam Main Road in Ward No.43 in Zone 3
1 document required · 1 mandatory
₹0
₹5,000
6 Sept 2022
29 Aug 2022
6 Sept 2022
29 Aug 2022
5 Sept 2022
29 Aug 2022
Amount
Dismantling exisisting PCC Concrete including dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls etc complete as per standard specification
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. FOR DRAIN
Supply and filling crusher stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Providing and laying in position, Standardised Concrete Mix M-25 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350 kg/mᶾ and maximum water cement ratio of 0.50, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Manufacturing Supply and fixing of 900mm dia SFRC Manhole including cost of all materials and all labour cahrges steel fabrication charges etc complete etc complete
Removal of Excavated Excess Earth away from the site to 8 K.M including loading and transportation charges etc, complete as per standard specification.
S RAGUPATHY
stage.html
html • 0.02 MB
finance_294844.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .