Tender Value
₹38.9 L
EMD Value
₹39,000
Closing Date
29 Jul 2022, 3:00 pmClosed
Project Director,
DRDA, Pudukkottai
Construction of Cremation Shed and other infrastructure facilities to Samathuva Burial ground_6 nos. in AGAMT-II-2021-22 Village panchayats of Arimalam Block in Pudukkottai District in Package no. 15
2022_RDTN_243507_1
PUDUKKOTTAI DISTRICT - AGAMT II - 2021-2022
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹39,000
23 Aug 2022
23 Jul 2022
29 Jul 2022
23 Jul 2022
29 Jul 2022
23 Jul 2022
Amount
1. Construction of Cremation shed, Compound wall 26m and Approach road, Water Supply with Solar Light @ Sithirambur Samathuva Mayanam in Thiruvakkudi Panchayat
Clearing the light jungle uproofing including all cutting charges and clearing etc., complete
Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Refilling the Basement with Excavated Earth including all cost and conveyance of all materials to worksite and all labour charges etc., complete
Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete for
Below Sill Level
Above Sill Level
Supply and fabrication of steel including cost and conveyance of all materials to site and labour charges etc., complete
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Ceiling plastering with cement mortor 1:3 mix to 10mm thickness including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering in CM 1:5 mix using 12mm thick including all cost and other labour charges etc., complete
C.C. 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Emulsion Painting including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete
Supply and fixing of Bituminous Tar Pad 12mm thick every 5m for expansion joint
Provision for Water Supply Arrangments
Earthwork excavation in narrow trench and depositing on bank with an initial lead of 10m and lift of 2m in all soils
Supply and delivery of following PVC Pipes 63mm OD PVC 4.00 Kg/cm2 Pips
Conveyance of the following rigd PVC pipes. Lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4.00 Kg/cm2 Pips
Refilling the excavated earth including all labour charges etc., complete
Supply and delivery of following Specials for Tap Connection
63mm PVC End Cap
20mm dia PVC Pipe
63 mm x 20 mm PVC Saddle Piece
20mm dia PVC Elbow
20mm dia PVC Coupling
20mm dia GM Ferrule
20mm dia GI Tap
2. Construction of Cremation shed, CC road - 6m @ Udayarkudieruppu Samathuva Mayanam in K.Rayavaram Panchayat
Clearing the light jungle uproofing including all cutting charges and clearing etc., complete
Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Refilling the Basement with Excavated Earth including all cost and conveyance of all materials to worksite and all labour charges etc., complete
Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete for
Below Sill Level
Above Sill Level
Supply and fabrication of steel including cost and conveyance of all materials to site and labour charges etc., complete
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Ceiling plastering with cement mortor 1:3 mix to 10mm thickness including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering in CM 1:5 mix using 12mm thick including all cost and other labour charges etc., complete
C.C. 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Emulsion Painting including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete
Supply and fixing of Bituminous Tar Pad 12mm thick every 5m for expansion joint
Provision for Water Supply Arrangments
Earthwork excavation in narrow trench and depositing on bank with an initial lead of 10m and lift of 2m in all soils
Supply and delivery of following PVC Pipes 63mm OD PVC 4.00 Kg/cm2 Pips
Conveyance of the following rigd PVC pipes. Lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4.00 Kg/cm2 Pips
Refilling the excavated earth including all labour charges etc., complete
Supply and delivery of following Specials for Tap Connection
63mm PVC End Cap
20mm dia PVC Pipe
63 mm x 20 mm PVC Saddle Piece
20mm dia PVC Elbow
20mm dia PVC Coupling
20mm dia GM Ferrule
20mm dia GI Tap
3. Construction of Cremation shed, Culvert, Compound wall 26m and Approach road, with Solar Light, Water Supply @ Elangudipatti Samathuva Mayanam in Thekkattur Panchayat
Clearing the light jungle uproofing including all cutting charges and clearing etc., complete
Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Refilling the Basement with Excavated Earth including all cost and conveyance of all materials to worksite and all labour charges etc., complete
Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete for
Below Sill Level
Above Sill Level
Supply and fabrication of steel including cost and conveyance of all materials to site and labour charges etc., complete
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Ceiling plastering with cement mortor 1:3 mix to 10mm thickness including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering in CM 1:5 mix using 12mm thick including all cost and other labour charges etc., complete
C.C. 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Emulsion Painting including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete
Supply and fixing of Bituminous Tar Pad 12mm thick every 5m for expansion joint
Provision for Water Supply Arrangments
Earthwork excavation in narrow trench and depositing on bank with an initial lead of 10m and lift of 2m in all soils
Supply and delivery of following PVC Pipes 63mm OD PVC 4.00 Kg/cm2 Pips
Conveyance of the following rigd PVC pipes. Lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4.00 Kg/cm2 Pips
Refilling the excavated earth including all labour charges etc., complete
Supply and delivery of following Specials for Tap Connection
63mm PVC End Cap
20mm dia PVC Pipe
63 mm x 20 mm PVC Saddle Piece
20mm dia PVC Elbow
20mm dia PVC Coupling
20mm dia GM Ferrule
20mm dia GI Tap
Provision for Culvert - Sub Estimate
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
FILLING WITH GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling Gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
4. Construction of Cremation shed, Compound wall 25m and Approach road, Solar Light with Water Supply @ Meenikandah Samathuva Mayanam in Kummangudi Panchayat
Clearing the light jungle uproofing including all cutting charges and clearing etc., complete
Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Refilling the Basement with Excavated Earth including all cost and conveyance of all materials to worksite and all labour charges etc., complete
Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete for
Below Sill Level
Above Sill Level
Supply and fabrication of steel including cost and conveyance of all materials to site and labour charges etc., complete
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Ceiling plastering with cement mortor 1:3 mix to 10mm thickness including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering in CM 1:5 mix using 12mm thick including all cost and other labour charges etc., complete
C.C. 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Emulsion Painting including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete
Supply and fixing of Bituminous Tar Pad 12mm thick every 5m for expansion joint
Provision for Water Supply Arrangments
Earthwork excavation in narrow trench and depositing on bank with an initial lead of 10m and lift of 2m in all soils
Supply and delivery of following PVC Pipes 63mm OD PVC 4.00 Kg/cm2 Pips
Conveyance of the following rigd PVC pipes. Lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4.00 Kg/cm2 Pips
Refilling the excavated earth including all labour charges etc., complete
Supply and delivery of following Specials for Tap Connection
63mm PVC End Cap
20mm dia PVC Pipe
63 mm x 20 mm PVC Saddle Piece
20mm dia PVC Elbow
20mm dia PVC Coupling
20mm dia GM Ferrule
20mm dia GI Tap
5. Construction of Cremation shed, Compound wall (36m) and Approach road with Solar Light @ Kadathanpatti in Kadiyapatti Panchayat
Clearing the light jungle uproofing including all cutting charges and clearing etc., complete
Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Refilling the Basement with Excavated Earth including all cost and conveyance of all materials to worksite and all labour charges etc., complete
Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete for
Below Sill Level
Above Sill Level
Supply and fabrication of steel including cost and conveyance of all materials to site and labour charges etc., complete
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Ceiling plastering with cement mortor 1:3 mix to 10mm thickness including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering in CM 1:5 mix using 12mm thick including all cost and other labour charges etc., complete
C.C. 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Emulsion Painting including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete
Supply and fixing of Bituminous Tar Pad 12mm thick every 5m for expansion joint
Provision for Water Supply Arrangments
Earthwork excavation in narrow trench and depositing on bank with an initial lead of 10m and lift of 2m in all soils
Supply and delivery of following PVC Pipes 63mm OD PVC 4.00 Kg/cm2 Pips
Conveyance of the following rigd PVC pipes. Lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4.00 Kg/cm2 Pips
Refilling the excavated earth including all labour charges etc., complete
Supply and delivery of following Specials for Tap Connection
63mm PVC End Cap
20mm dia PVC Pipe
63 mm x 20 mm PVC Saddle Piece
20mm dia PVC Elbow
20mm dia PVC Coupling
20mm dia GM Ferrule
20mm dia GI Tap
6. Construction of Cremation shed, Compound wall (32M) and Approach road, Solar Light with Water Supply @ Valaramanickam Samathuva Mayanam in Valaramanickam Panchayat
Clearing the light jungle uproofing including all cutting charges and clearing etc., complete
Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Refilling the Basement with Excavated Earth including all cost and conveyance of all materials to worksite and all labour charges etc., complete
Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Centering for sides and soffixs of all RCC works including cost and conveyance of all materials to site and all labour charges etc., complete for
Below Sill Level
Above Sill Level
Supply and fabrication of steel including cost and conveyance of all materials to site and labour charges etc., complete
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Ceiling plastering with cement mortor 1:3 mix to 10mm thickness including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering in CM 1:5 mix using 12mm thick including all cost and other labour charges etc., complete
C.C. 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Emulsion Painting including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete
Supply and fixing of Bituminous Tar Pad 12mm thick every 5m for expansion joint
Provision for Water Supply Arrangments
Earthwork excavation in narrow trench and depositing on bank with an initial lead of 10m and lift of 2m in all soils
Supply and delivery of following PVC Pipes 63mm OD PVC 4.00 Kg/cm2 Pips
Conveyance of the following rigd PVC pipes. Lowering to trenches and laying to proper grade and alignment 63mm OD PVC 4.00 Kg/cm2 Pips
Refilling the excavated earth including all labour charges etc., complete
Supply and delivery of following Specials for Tap Connection
63mm PVC End Cap
20mm dia PVC Pipe
63 mm x 20 mm PVC Saddle Piece
20mm dia PVC Elbow
20mm dia PVC Coupling
20mm dia GM Ferrule
20mm dia GI Tap
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.GANESAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .