Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAdmitted-Finance | ₹15.2 L | L1 | Admitted-Finance |
| 2 | L2₹15.4 L+₹16,586.18 (1.09%)Admitted-Finance | ₹15.4 L+₹16,586.18 (1.09%) | L2 | Admitted-Finance |
| 3 | L3₹15.4 L+₹18,912.70 (1.24%)Admitted-Finance | ₹15.4 L+₹18,912.70 (1.24%) | L3 | Admitted-Finance |
| 4 | L4₹16.0 L+₹81,580.96 (5.37%)Admitted-Finance | ₹16.0 L+₹81,580.96 (5.37%) | L4 | Admitted-Finance |
| 5 | L5₹16.0 L+₹84,828.15 (5.58%)Admitted-Finance | ₹16.0 L+₹84,828.15 (5.58%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Dhandayuthabani L1 | STALIN BROTHERS CONTRCTOR L4 | VICTORY CONSTRUCTIONS L2 | AVN Constructions L3 | HM ENTERPRISES L6 | Karunanithi V L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 277.91 | Cum | 205.9 ₹57,221.67 | 197.84 ₹54,981.71 | 200 ₹55,582 | 140 ₹38,907.4 | 220 ₹61,140.2 | 90 ₹25,011.9 Lowest |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance | 46.31 | Cum | 4,426.85 ₹2,05,007.42 | 4,039.5 ₹1,87,069.25 | 5,386 ₹2,49,425.66 | 2,300 ₹1,06,513 Lowest | 4,250 ₹1,96,817.5 | 5,399.6 ₹2,50,055.48 |
| 3.00 | Cement Concrete 1:3:6mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc complete. | 105.65 | Cum | 5,018.99 ₹5,30,256.29 | 4,606.28 ₹4,86,653.48 Lowest | 5,000 ₹5,28,250 | 5,000 ₹5,28,250 | 4,800 ₹5,07,120 | 6,155.31 ₹6,50,308.5 |
| 4.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials | 969.12 | Cum | 422.45 ₹4,09,404.74 | 410.63 ₹3,97,949.75 | 200 ₹1,93,824 Lowest | 400 ₹3,87,648 | 455 ₹4,40,949.6 | 200 ₹1,93,824 Lowest |
| 5.00 | Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials | 172.27 | Cum | 440.91 ₹75,955.57 | 440.81 ₹75,938.34 | 400 ₹68,908 | 400 ₹68,908 | 520 ₹89,580.4 | 200 ₹34,454 Lowest |
| 6.00 | Supplying fabricating and placing in position Mild steel /Ribbed tor steel grills for all RCC Works as per design given including cost of steel and GI Binding wire in all floors etc., complete complying with standard specification. ( contractor has to make his owm arrangements for the supply of steel and binding wire ) | 1.01 | MT | 4,438.21 ₹4,504.78 Lowest | 68,958.53 ₹69,992.91 | 91,944.7 ₹93,323.87 | 80,000 ₹81,200 | 89,000 ₹90,335 | 91,944.7 ₹93,323.87 |
| 7.00 | Cement concrete 1:1-1/2:3 (one cement, one and a half crushed stone M.Sand and Three hardd broken stone jelly ) using 20mm gauge hard broken granite stone jelly for all RCC Items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including | 12.35 | Cum | 459.37 ₹5,673.22 Lowest | 6,848.15 ₹84,574.65 | 9,130.87 ₹1,12,766.24 | 7,500 ₹92,625 | 6,100 ₹75,335 | 9,144.47 ₹1,12,934.2 |
| 8.00 | GST 18% | 1 | No | 2,31,844.26 ₹2,31,844.26 Lowest | 2,44,288.82 ₹2,44,288.82 | 2,34,374.36 ₹2,34,374.36 | 2,34,729.25 ₹2,34,729.25 | 2,63,029.99 ₹2,63,029.99 | 2,44,784.15 ₹2,44,784.15 |
Tender Value
Refer Docs
EMD Value
₹21,550
Closing Date
15 Sept 2026, 3:00 pmClosed
The Panchayat President,Puttuthakku panchayat
The Panchayat office,Puttuthakku panchayat
Construction of CC Drainage at Anna Nagar Long Street 1 and 2 in Cross Street 1 and 2 at Puttuthakku H/O Puttuthakku Panchayat
2026_RDTN_699815_1
A3/16/2026
Open Tender
Civil Works
Works
90 days
The Panchayat office, Puttuthakku panchayat
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹21,550
17 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 277.91 | Cum | - | - |
| 2 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance | 46.31 | Cum | - | - |
| 3 | Cement Concrete 1:3:6mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc complete. | 105.65 | Cum | - | - |
| 4 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials | 969.12 | Cum | - | - |
| 5 | Plastering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials | - | Cum | - | - |
| 6 | Supplying fabricating and placing in position Mild steel /Ribbed tor steel grills for all RCC Works as per design given including cost of steel and GI Binding wire in all floors etc., complete complying with standard specification. ( contractor has to make his owm arrangements for the supply of steel and binding wire ) | 1 | MT | - | - |
| 7 | Cement concrete 1:1-1/2:3 (one cement, one and a half crushed stone M.Sand and Three hardd broken stone jelly ) using 20mm gauge hard broken granite stone jelly for all RCC Items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including | 12.35 | Cum | - | - |
| 8 | GST 18% | 1 | No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_841230.xls
BOQ • 0.25 MB
tendoc.pdf
Tender Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .