RequiredBid to RA enabled Type of Bid Primary product category Time allowed for Technical Clarifications during technical evaluation Evaluation Method EMD Detail Required ePBG Detail Required Splitting Bid splitting not applied. MII Purchase Preference 1/4 MII Purchase Preference MSE Purchase Preference MSE Purchase Preference 1. Purchase preference to Micro and Small Enterprises (MSEs): Purchase preference will be given to MSEs as defined in Public Procurement Policy for Micro and Small Enterprises (MSEs) Order
Required2012 dated 23.03.2012 issued by Ministry of Micro
RequiredSmall and Medium Enterprises and its subsequent Orders/Notifications issued by concerned Ministry. If the bidder wants to avail the Purchase preference
Requiredthe bidder must be the manufacturer of the offered product in case of bid for supply of goods. Traders are excluded from the purview of Public Procurement Policy for Micro and Small Enterprises. In respect of bid for Services
Requiredthe bidder must be the Service provider of the offered Service. Relevant documentary evidence in this regard shall be uploaded along with the bid in respect of the offered product or service. If L-1 is not an MSE and MSE Seller (s) has/have quoted price within L-1+ 15% (Selected by Buyer)of margin of purchase preference price band defined in relevant policy
Requiredsuch Seller shall be given opportunity to match L-1 price and contract will be awarded for 25%(selected by Buyer) percentage of total 2. Estimated Bid Value indicated above is being declared solely for the purpose of guidance on EMD amount and for determining the Eligibility Criteria related to Turn Over
RequiredPast Performance and Project/Past Experience etc. This has no relevance or bearing on the price to be quoted by the bidders and is also not going to have any impact on bid participation. Also this is not going to be used as a criteria in determining reasonableness of quoted prices which would be determined by the buyer based on its own assessment of reasonableness and based on competitive prices received in Bid/RA process. Tube Brand Type Technical Specifications Specification Document BOQ Detail Document Advisory-Please refer attached BOQ document for detailed consignee list and delivery period. Consignees/Reporting Officer and Quantity S.No. Consignee/Reporting Officer 1 Arjun Ghosh Washer Brand Type Technical Specifications Specification Document BOQ Detail Document Advisory-Please refer attached BOQ document for detailed consignee list and delivery period. 2/4 Consignees/Reporting Officer and Quantity S.No. Consignee/Reporting Officer 1 Arjun Ghosh Buyer Added Bid Specific Terms and Conditions 1 . Generic OPTION CLAUSE: The Purchaser reserves the right to increase or decrease the quantity to be ordered up to 25 percent of bid quantity at the time of placement of contract. The purchaser also reserves the right to increase the ordered quantity by up to 25% of the contracted quantity during the currency of the contract at the contracted rates. Bidders are bound to accept the orders accordingly. 2 . Generic Supplier shall ensure that the Invoice is raised in the name of Consignee with GSTIN of Consignee only. 3 . Generic 1. The Seller shall not assign the Contract in whole or part without obtaining the prior written consent of buyer. 2. The Seller shall not sub-contract the Contract in whole or part to any entity without obtaining the prior written consent of buyer. 3. The Seller shall
Requirednotwithstanding the consent and assignment/sub-contract
Requiredremain jointly and severally liable and responsible to buyer together with the assignee/sub-contractor
Requiredfor and in respect of the due performance of the Contract and the 4 . Generic While generating invoice in GeM portal
Requiredthe seller must upload scanned copy of GST invoice and the screenshot of GST portal confirming payment of GST. 5 . Generic Bidders are advised to check applicable GST on their own before quoting. Buyer will not take any responsibility in this regards. GST reimbursement will be as per actuals or as per applicable rates (whichever is lower)
Requiredsubject to the maximum of quoted GST %. 6 . Buyer Added Bid Specific ATC Buyer Added text based ATC clauses 1) Bidders shall make sure that they shall quote their rates inclusive of all charges (P&F charges
Requiredany statutory taxes etc.) on FOR NFL VIJAIPUR STORES (i.e.
RequiredFREIGHT CHARGES UPTO NFL VIJAIPUR STORES-GUNA; MADHYA PRADESH SHALL BE INCLUSIVE IN YOUR RATES). Transit Insurance shall be in NFL scope. No additional rate shall be provided in your bid as the same shall not be entertained and your bid shall be liable to be rejected instantly. 2) Bidders have to submit the technical checklist (Annexure-III) which is attached along with the bid. 3) Please confirm that the material would be properly packed in the event of placement of order. 4) Bidders has to confirm to submit the following certificates
Requiredin Original @ no extra cost to NFL in case of placement of PO: a. For item @ S.No. 1: i. Material test Certificate indicating Chemical Analysis & Mechanical. ii. Hydraulic/Pneumatic Test Certificate iii. Guarantee Certificate certifying that the item is guaranteed against manufacturing defects/bad workmanship for a period of 18 months from the date of supply or 12 months from the date of installation
Requiredwhichever is earlier. b. For item @ S.No. 2: 3/4 i. Material Test Certificate ii. Guarantee Certificate certifying that the item is guaranteed against manufacturing defects/bad workmanship for a period of 18 months from the date of supply or 12 months from the date of installation
Requiredwhichever is earlier. 5) Rest of the terms and conditions shall be as per the terms and conditions of the GeM Portal. No deviation shall be entertained in this case or else
Requiredyour offer shall be liable to be rejected in case of any deviation. . 7 . Buyer Added Bid Specific ATC Buyer uploaded ATC document Click here to view the file . Disclaimer The additional terms and conditions have been incorporated by the Buyer after approval of the Competent Authority in Buyer Organization. Buyer organization is solely responsible for the impact of these clauses on the bidding process
Requiredits outcome
Requiredand consequences thereof including any eccentricity/restriction arising in the bidding process due to these ATCs and due to modification of technical specifications and/or terms and conditions governing the bid. Any clause incorporated by the Buyer such as demanding Tender Sample
Requiredincorporating any clause against the MSME policy and Preference to make in India Policy
Requiredmandating any Brand names or Foreign Certification
Requiredchanging the default time period for Acceptance of material or payment timeline governed by OM of Department of Expenditure shall be null and void and would not be considered part of bid. Further any reference of conditions published on any external site or reference to external documents/clauses shall also be null and void. If any seller has any objection/grievance against these additional clauses or otherwise on any aspect of this bid
Requiredthey can raise their representation against the same by using the Representation window provided in the bid details field in Seller dashboard after logging in as a seller within 4 days of bid publication on GeM. Buyer is duty bound to reply to all such representations and would not be allowed to open bids if he fails to reply to such representations. Also
RequiredGeM does not permit collection of Tender fee/Auction fee in case of Bids/Forward Auction as the case may be. Any stipulation by the Buyer seeking payment of Tender Fee/Auction fee through ATC clauses would be treated as null and void. In terms of GeM GTC clause 26 regarding Restrictions on procurement from a bidder of a country which shares a land border with India
Requiredany bidder from a country which shares a land border with India will be eligible to bid in this tender only if the bidder is registered with the Competent Authority. While participating in bid
RequiredBidder has to undertake compliance of this and any false declaration and non-compliance of this would be a ground for immediate termination of the contract and further legal action in accordance with the laws. 4/4