Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
14 Oct 2026, 12:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE/GCC/MDU
SE/GCC/MDU
Providing PCC RCC cable duct for the enhancement of Pr Tr at Thengamputhur SS
2026_EB_709631_1
SE/GCC/MDU 019/2026-27
Open Tender
Civil Works - Others
Works
180 days
Kanyakumari
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹35,000
30 Sept 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
14 Oct 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20.B | 277 | m³ | - | - |
| 2 | PCC 1:3:6 using 40mm size machine crushed HBG metal without formwork including cost of materials, labours, lead, lift, curing, etc. complete | 110 | m³ | - | - |
| 3 | PCC 1:2:4 using 12 to 20mm size machine crushed HBG metal without formwork including cost of materials, labours, lead, lift, curing, etc. complete | 12 | m³ | - | - |
| 4 | PCC 1:2:4 using 12 to 20mm size machine crushed HBG metal with formwork including cost of materials, labours, lead, lift, curing, etc. complete | 14 | m³ | - | - |
| 5 | RCC 1:1.5:3 using 12 to 20mm machine crushed HBG metal without formwork including cost of materials, labours, lead, lift, curing, etc. complete. But excluding cost of reinforcement. Raft | 20 | m³ | - | - |
| 6 | RCC 1:1.5:3 using 12 to 20mm machine crushed HBG metal with formwork including cost of materials, labours, lead, lift, curing, etc. complete. But excluding cost of reinforcement. Column | 3 | m³ | - | - |
| 7 | RCC 1:1.5:3 using 12 to 20mm machine crushed HBG metal without formwork including cost of materials, labours, lead, lift, curing, etc. complete. But excluding cost of reinforcement. Transformer Plinth | 5.3 | m³ | - | - |
| 8 | RCC 1:1.5:3 using 12 to 20mm machine crushed HBG metal without formwork including cost of materials, labours, lead, lift, curing, etc. complete. But excluding cost of reinforcement.Plinth beam | 1.4 | m³ | - | - |
| 9 | RCC 1:1.5:3 using 12 to 20mm machine crushed HBG metal without formwork including cost of materials, labours, lead, lift, curing, etc. complete. But excluding cost of reinforcement. Road | 28 | m³ | - | - |
| 10 | RCC 1:1.5:3 using 12 to 20mm machine crushed HBG metal without formwork including cost of materials, labours, lead, lift, curing, etc. complete. But excluding cost of reinforcement. Precast Slab | 6 | m³ | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_852687.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .