Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance CPWD | CENTRAL | DELHI | 110007 | Admitted-Finance |
| 2 | Admitted-Finance 21 JHAMRI 151 JHAMRI JHAMRI ROHTAK HARYANA 124142 UDYAM HR 07 0030314 | JHAJJAR | HARYANA | 124142 | Admitted-Finance |
| 3 | Admitted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | Admitted-Finance |
Tender Value
₹1.3 L
EMD Value
₹2,000
Closing Date
30 Apr 2021, 12:00 pmClosed
EXECUTIVE ENGINEER
EE ETD Mainpuri
Repairing and maintenance work of air conditioners at 132 KV Substation Sultanganj and Miraichi under ETD Mainpuri
2021_UPTCL_583202_1
ETD(M)-01/2021-22
Open Tender
Electrical Works
Lump-sum
30 days
SUltanganj And Miraichi
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EXECUTIVE ENGINEER
₹2,000
30 Apr 2021
17 Apr 2021
30 Apr 2021
17 Apr 2021
30 Apr 2021
17 Apr 2021
Amount
Following work are to be carried out of the following works under ETD Mainpuri.
Cleaning & checking outdoor and indoor unit, cleaning of air filter of 2Ton capacity Hitachi/Voltas make split air condition with nylon brush, soap and water and repairing of deteriorated filter if required with skilled technician. (132 KV S/S Sultanganj - 05 Nos. & 132 KV S/S Miraichi -10 Nos.)
Checking of leakage for R-22 (Freon) gas and brazing of any leakage joint perfectly of 2 Ton split AC and all other associated work including cost of material and skilled labour. (132 KV S/S Sultanganj - 05 Nos. & 132 KV S/S Miraichi -10 Nos.)
Recharging of R-22 (Freon) Gas in sufficient quantity in compressor of 2 Ton Split AC including cost of material and skilled labour. (132 KV S/S Sultanganj - 05 Nos. & 132 KV S/S Miraichi -06 Nos.)
Recharging/ Replacing of auto transformer and control circuit (PCB) and OEN relay of 15 A -230V stabilizer. (132 KV S/S Sultanganj - 01 Nos. & 132 KV S/S Miraichi -02Nos.)
Replacement of damaged R-22 (Freon) Gas pipe made of copper outdoor to indoor unit including cost of all material, labour and T&P provided by the contractor at his own cost. (132 KV S/S Sultanganj - 02 Nos. & 132 KV S/S Miraichi -06 Nos.)
Replacement/repair of fan motor for various air conditioners of 2 Ton split AC type Hitachi/Voltas make. (132 KV S/S Sultanganj - 02 Nos. & 132 KV S/S Miraichi -04 Nos.)
Replacement of compressor of 2 Ton split type AC including of material and skilled labour. (132 KV S/S Sultanganj - 01 No)
Replacement of damaged heating coils. (132 KV S/S Miraichi -06 Nos.)
M/S A.K. ENTERPRISES
Versha and Brothers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .