| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.0 LAdmitted-Finance | ₹78.0 L | L1 | Admitted-Finance |
| 2 | L2₹81.4 L+₹3.5 L (4.43%)Admitted-Finance | ₹81.4 L+₹3.5 L (4.43%) | L2 | Admitted-Finance |
| 3 | L3₹83.7 L+₹5.8 L (7.40%)Admitted-Finance | ₹83.7 L+₹5.8 L (7.40%) | L3 | Admitted-Finance |
| 4 | L4₹84.2 L+₹6.2 L (7.96%)Admitted-Finance | ₹84.2 L+₹6.2 L (7.96%) | L4 | Admitted-Finance |
| 5 | L5₹94.8 L+₹16.9 L (21.6%)Admitted-Finance | ₹94.8 L+₹16.9 L (21.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Pandit Trading Co. L1 | M/s Ashu Brothers L3 | PS ELECTRICALS L4 | M S Electricals L5 | HS Associates L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Cartage of following material from ESC Noida/Sahibabad/ Ghaziabad /Any other ESC of Meerut Discom to JE Store and from JE store to various points site of work including loading and unloading at both ends : - | ||||||||
| 1.01 | PCC Pole 8.5 Mtr Long | 1 | NO | 325 ₹81,250 Lowest | 500 ₹1,25,000 | 450 ₹1,12,500 | 600 ₹1,50,000 | 600 ₹1,50,000 |
| 1.02 | PCC Pole 9 Mtr Long | 1 | NO | 450 ₹9,000 | 1,200 ₹24,000 | 500 ₹10,000 | 300 ₹6,000 Lowest | 650 ₹13,000 |
| 1.03 | PCC Pole 11 Mtr Long | 1 | NO | 900 ₹63,000 | 1,500 ₹1,05,000 | 630 ₹44,100 Lowest | 1,200 ₹84,000 | 750 ₹52,500 |
| 1.04 | STP Pole 9 Mtr Long | 1 | NO | 300 ₹6,000 | 500 ₹10,000 | 500 ₹10,000 | 100 ₹2,000 Lowest | 400 ₹8,000 |
| 1.05 | STP Pole 11 Mtr Long | 1 | NO | 350 ₹10,500 | 500 ₹15,000 | 520 ₹15,600 | 300 ₹9,000 Lowest | 400 ₹12,000 |
| 1.06 | STP Pole 13 Mtr Long | 1 | NO | 425 ₹6,375 | 500 ₹7,500 | 525 ₹7,875 | 300 ₹4,500 Lowest | 500 ₹7,500 |
| 1.07 | 25 KVA NEW TRANSFORMER | 1 | NO | 1,000 ₹45,000 Lowest | 2,000 ₹90,000 | 2,000 ₹90,000 | 1,500 ₹67,500 | 2,500 ₹1,12,500 |
| 1.08 | 63 KVA NEW TRANSFORMER | 1 | NO | 1,500 ₹30,000 Lowest | 2,200 ₹44,000 | 4,000 ₹80,000 | 1,500 ₹30,000 Lowest | 2,750 ₹55,000 |
| 1.09 | 100 KVA NEW TRANSFORMER | 1 | NO | 1,500 ₹45,000 Lowest | 2,500 ₹75,000 | 5,000 ₹1,50,000 | 1,500 ₹45,000 Lowest | 3,000 ₹90,000 |
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
6 Apr 2026, 12:00 pmClosed
SE, EUDC-TECHNICAL, NOIDA
33/11 KV SUBSTATION, SECTOR-18 FIRST FLOOR, OPPOSITE SAB MALL, NOIDA
CONSTRUCTION OR SHIFTING OF LINE POLE IN FULL DEPOSIT AREA AE 7 DADRI UNDER EUDD 11KV YEIDA NOIDA
2026_PVVNL_1128872_1
23/EUDC-T/2025-26/NOIDA (WORKS)
Open Tender
Electrical Works
Item Rate
IN AREA OF 11 KV AE-7 YEIDA (DADRI)
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Yes
SE, EUDC-TECHNICAL, NOIDA
₹1 L
Yes
23 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Cartage of following material from ESC Noida/Sahibabad/ Ghaziabad /Any other ESC of Meerut Discom to JE Store and from JE store to various points site of work including loading and unloading at both ends : - | - | - | - | - |
| - | PCC Pole 8.5 Mtr Long | - | NO | - | - |
| - | PCC Pole 9 Mtr Long | - | NO | - | - |
| - | PCC Pole 11 Mtr Long | - | NO | - | - |
| - | STP Pole 9 Mtr Long | - | NO | - | - |
| - | STP Pole 11 Mtr Long | - | NO | - | - |
| - | STP Pole 13 Mtr Long | - | NO | - | - |
| - | 25 KVA NEW TRANSFORMER | - | NO | - | - |
| - | 63 KVA NEW TRANSFORMER | - | NO | - | - |
| - | 100 KVA NEW TRANSFORMER | - | NO | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_2105563.xls
BOQ • 0.35 MB
DOC.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .