| 1 | 1₹2.6 CrAccepted-AOC | ₹2.6 Cr | 1 | Accepted-AOC Bidder quoted value is less than the put tender value |
| 2 | 2₹2.7 Cr+₹3.3 L (1.24%)Rejected-AOC NO 33 PILLAYAR KOIL ST PULIYAMBEDU CHENNAI 77 | CHENNAI | ₹2.7 Cr+₹3.3 L (1.24%) | 2 | Rejected-AOC Bidder quoted value is high than the put tender value |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
2 Nov 2023, 3:00 pmClosed
Executive officer
Arulmigu Samayeeswarar Temple,Pazhaverkadu, Ponneri Taluk,Thiruvallur District
Conservation Work in Temple at Arulmigu Samayeeswarar Temple,Pazhaverkadu, Ponneri Taluk,Thiruvallur District
2023_HRCE_379971_1
72332/2022/Q1
Open Tender
Civil Works - Others
Lump-sum
270 days
Arulmigu Samayeeswarar Temple, Pazhaverkadu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.4 L
Yes
7 Mar 2024
17 Oct 2023
2 Nov 2023
17 Oct 2023
2 Nov 2023
17 Oct 2023
Amount
Removing in the existing cement flooring from the sannathi and removing all debris from the site of work as directed by the departmental officers etc., complete
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with non Flammable Shaded coverings, proving with non Flammable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc., complete hire charges only for erection, maintenance and removing the same on completion of the work (A)-Vimanam/Gopuram upto 15'-0" Height
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with non Flammable Shaded coverings, proving with non Flammable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc., complete hire charges only for erection, maintenance and removing the same on completion of the work (B)Vimanam/Gopuram upto 25'-0" Height
Removing undulated stone flooring and paavukkal from the sannathi and stacking it for relay including cost of conveyance, labour, handling etc., Complete as directed by the departmental officers etc., Complete (A)-Pavukkal
Removing undulated stone flooring and paavukkal from the sannathi and stacking it for relay including cost of conveyeance, labour, handling etc., Complete as directed by the departmental officers etc., Complete (B)-Flooring
Removing the door shutter from the temple and including the cost of removing all debris from the site of work as directed by the departmental officers etc.. Complete
Supplying and filling in foundation and basement with M. sand in layers of 150mm thickness well watered rammed and consolidated complying with relevant std specification including cost of supply of filling M-sand
Providing Water Washing in the granite portion by using appropriate equipments with all its accessories after throughly removing all dirts oil coating etc., from the granite surface and making it into original surface including cost of final clearing with water wash etc., completed complying with standard specifications.
supply of cutstone for carrying out Garpagraham, Artha mandapam, Mahamandapam and other temple structures of pillar, uththiram, pavukkal, nilaikkal upto 10 feet length complying with standard specifications.
Dressing and fixing charges for new cut stones for thoon, bothiyal, uthiram, pavukkal, nilaikkal, stone steps and stone handrail… excuding the cost of cut stones but including cost of labour and all complete.(A)-Thoon
Dressing and fixing charges for new cut stones for thoon, bothiyal, uthiram, pavukkal, nilaikkal, stone steps and stone handrail… excuding the cost of cut stones but including cost of labour and all complete.(B)-Vazhaipoo bothiyal
Dressing and fixing charges for new cut stones for thoon, bothiyal, uthiram, pavukkal, nilaikkal, stone steps and stone handrail… excuding the cost of cut stones but including cost of labour and all complete.(C)-Uthiram
Dressing and fixing charges for new cut stones for thoon, bothiyal, uthiram, pavukkal, nilaikkal, stone steps and stone handrail… excuding the cost of cut stones but including cost of labour and all complete.(D)-Pavukkal
Dressing and fixing charges for new cut stones for thoon, bothiyal, uthiram, pavukkal, nilaikkal, stone steps and stone handrail… excuding the cost of cut stones but including cost of labour and all complete.(E)-Nilaikkal
Dressing and fixing charges for new cut stones for thoon, bothiyal, uthiram, pavukkal, nilaikkal, stone steps and stone handrail… excuding the cost of cut stones but including cost of labour and all complete.(F)-Stone steps
Dressing and fixing charges for new cut stones for thoon, bothiyal, uthiram, pavukkal, nilaikkal, stone steps and stone handrail… excuding the cost of cut stones but including cost of labour and all complete.(G)-Stone handrail
Refixing the removed stone flooring from the Sannathi as same as it exists that's including labour charges for fixing, handling and etc., all complete. With three time dressing and pointing complying with standard specifications.
Plastering with Lime Mortor 1:1.5, (one lime and one and half sand), 20mm thick including cost and conveyance of all materials and all labour charges, curing etc., complete complying with standard specifications.
Supplying of best teak wood elements for wood column, wood beam, wood slabs and wood rafters Beams, Temple Wooden Uttarams with minimum 9" thick to 18". In temple, including required materials., all complete . Complying with standard specations as directed by the deparmental officers.
Labour charge for wrought and put up of wooden members in temple complex.(A)- Labour wrought and put up in position of wooden elements such as wood rafters wooden door frame etc., complying with standard specifications as directed by the deparmentl officers..
Labour charge for wrought and put up of wooden members in temple complex.(B)- Labour wrought and put up in position of ornamental wooden elements such as wood rafters wood capitals, Kodungai etc. complying with standard specifications as directed by the deparmentl officers.
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc., complete with std. Specifications.(A)- Mahadwaram door
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc., complete with std. Specifications.(B)-Temple Doors
Varnishing the new wood work with two coats of Varnish of good quality and color over one coat of primer over new wood word include costs of all materials, brushes charges etc, complete complying with standard specifications.
Labour charges for Pointing the Cut stone masonary work with lime mortar 1:1.5 (one part of lime and one and half part of sand) excluding cost of cut stone but including all labour charges, scaffolding etc., complete with standard specifications.
Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the suface curing in all floors including brushes etc., complete as per specification.
Flooring with cut stone slab of size 600mm X 600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and pointing with lime mortar 1:1.5 ctc., complete
Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications
Finishing the top of roof with one course of machine pressed tiles 20cmX 20cmX20m of approved quality laid in Lime mortar 1:1.5 12mm tk mixed with water proofing compound 2 % by weight of cement used etc, complete with standard specfication.
Dismantling the existing damaged brick compound wall from temple, including removing all debris from the site of work etc, complete with standard specification.,
Earth work excavation for foundation in all soil except hard rock requiring blasting to a full depth with initial lead of 10m and lift of 2m etc., complete (SS 20B) as directed by the Dept,Officers.
Lime concrete 1: 4: 8 (One part of lime, four part of sand and eight part of brick jelly) using 40mm gauge hard broken brick jelly for foundation including dewatering wherever necessary and laid in layer of not more htan 15cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Random Rubble masonry work in L.M 1:2 (One of lime and two of M sand) using hard rough stones and bond stones in foundation and basement including dewatering wherever necessary proper setting,curing etc., complete in all respects complying with relevant standard specifications.
Brick work in Lime Mortar 1: 2 using Special Bricks 8" X 4"X 2" for Heritage Works including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specificaton.
Brick work in Lime Mortar 1: 2 using Special Bricks 9" X 43/8" X 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc., complete complying with standard specificaton.
Supplying and fixing mild steel grill gate including cost conveyance of all materials and fixing in postion including priming coat etc., complete with standard specification.
Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over one coat of zinc chromite over existing red oxide primer in all floor etc., complete complying with standard specification.
Supplying and filling with gravel including cost and conveyance of gravel and all labour charges for filling ramming etc., complete complying with standard specfification
Ornamental brick masonry in lime mortar 1:2 (One part of lime and two part of sand) using II class Ground Moulded Chamber Burnt Bricks of size 9" X 43/8" X 23/4" including all varivargams, moulds, sathambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus etc., forming core walls of Rajagopuram/ vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in height etc., complete 100cft for vimanam/ gopuram - 15 feet height.
Plastering with lime Mortor 1:1.5 (One part of lime and one point five part of sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc., complete complying with standard specification. The lime used should be sourced from Pollachi which is hightly iron fortified and suitable for structural and masonry works.
Providing Vargapoochu over the corewalls of vimanams / Gopurams, with lime mortar 1:1.5 (One part of lime and one point five part of mortar) complete including shaping the mukhapathram, mahanasi, koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with lime mortar 1:1.5 (One part of lime and one point five part of mortar) and finishing with final ornamental plastering and nayam theervani incluidng cost and conveynance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc., complete including all extra for folding and including clearing from the vimanams/gopurams tc all complete complying with standard specification upto 15 feet height
Pointing the pressed tile of roof in Lime mortar 1:1.5 (One part of lime and one point five part of sand), 12mm thick mixed with water proofing compound two percent by weight of lime used etc., complete complying with standard specification.
Supplying and fixing in postion best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg./sq.cm including cost of necessary PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe lime in addition to those for more than 3.0 metre pipe lenght, etc., complete complying with standard specification.
Sub Total
M/s. New Mohana Constructions
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .