Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹61.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹61.5 L+₹30,910.60 (0.51%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical Technicaly Disualified | ||
| 4 | Rejected-Technical H 88 ARGORA HOUSING COLONY RANCHI 834002 | RANCHI | RANCHI | JHARKHAND | 834002 | - | Rejected-Technical Technicaly Disqualified | ||
| 5 | Rejected-Technical FLAT NO 401 C ASTRO GREEN APARTMENT CHANDNI CHOWK KANKE ROAD MORABADI RANCHI 834008 | RANCHI | RANCHI | JHARKHAND | 834008 | - | Rejected-Technical Technicaly Disualified |
Tender Value
₹62.2 L
EMD Value
₹12.5 L
Closing Date
23 Mar 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE DW and S Division Latehar
EE DW and S Division Latehar
Construction of Boundary Wall at Inspection Bungallow Neterhat under D W and S Div Latehar for Yr 2025-26
2026_DWSD_111670_1
DWSD/LTR/NET-IB-31/2025-26 (1st Call)
Open Tender
Civil Construction Goods
Percentage
60 days
EE DW and S Division Latehar
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
₹12.5 L
Yes
29 Jun 2026
16 Mar 2026
25 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Earthwork in excavation in foundation soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, leveling.. ramming the foundation trenches. removing roots of trees, shrubs all complete as per approved design. building specification and direction of E/I. | 252.72 | M3 | 151.82 | ₹38,367.95 |
| 1.02 | Extra for earthwork in hard soil as per specification and direction of E/I(vide classification of soil item-B) | 168.48 | M3 | 15.51 | ₹2,613.12 |
| 1.03 | Earth filling in foundation trenches and plinth in layers not exceeding 150m thick well watered, rammed, fully compacted and fine dressed with earth obtained from 'excavation foundation trenches within a lead of 50m and lift of 1.5m all complete as per building specification and direction of E/I (Mode of measurement complacted volume) | 168.48 | M3 | 55.28 | ₹9,313.57 |
| 1.04 | Providing coarse clean sand in foundation trenches or in plinth including ramming and wateringin layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour. royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement complacted volume). | 16.84 | M3 | 589.51 | ₹9,927.35 |
| 1.05 | Providing designation 75 B One brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 168.48 | M2 | 330.34 | ₹55,655.68 |
| 1.06 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:4:8 (one cement: 4 coarse sand: 8 graded stone aggregate) | 12.63 | M3 | 3,751.64 | ₹47,383.21 |
| 1.07 | Providing and laying in position specified of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement. All work upto plinth level 1:1.5:3 (1 cement: 1.5 coarse sand (zone-111):3 graded stone aggregate 20mm nominal size. | 63.08 | M3 | 5,218 | ₹3,29,151.44 |
| 1.08 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses,plinth ,and string courses,fillets,columns,pillars,abutments, posts and struts etc above plinth level excluding the cost of shuttering finishing and reinforcement 1:1.5:3(1cement: 1.5clean course sand:3graded stone aggregates 20mm nominal size. | 45.19 | M3 | 6,082.45 | ₹2,74,865.92 |
| 1.09 | Providing and laying in position specified of reinforced cement concrete excluding the cost of centering shuttering, finishing and reinforcement. All work up to plinth level 1:1.5:3 (1 cement: 1.5 coarse sand (zone-111):3 graded stone aggregate 20mm nominal size. | 33 | M3 | 5,218 | ₹1,72,194 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
ITB_IB.pdf
Tender Documents • 1.49 MB
BOQ_150788.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .