Tender Value
₹3.8 Cr
EMD Value
₹3.4 L
Closing Date
20 Jan 2026, 12:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
ELTD
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or "V" Crores whichever is less; where V=Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Ref: Railway Board letterno:2022/CE-I/GCC-2022/Policy, dated: 14.07.2022.India Railways Standard General Conditions of Contract, April-2022(Advance Correction Slip No.1)Absence of any documents supporting eligibility criteria, offer may be summarily rejected. NOTE: a)For Para 1.1 of, part-I (Special Conditions of Contract), mentioned above, the criteria for completed works shall be as under: - i. Entire work has to be completed in all respects as per contract agreement. Part completed work shall not be considered. ii. The value of completed work shall be reckoned from the total payment received by the tenderer from the organization mentioned above. b) Para 1.2 (i) is self-explanatory. Certificate issued by Chartered Accountants will also be accepted. Conditional tenders are liable to be rejected straight away. Railway reserves the right to reject such tenders summarily without assigning any reasons whatsoever. NOTE: i. Any false certificate submitted by tenderer shall lead to forfeiture of EMD and further action will be taken .ii. No post tender submission of documents shall be permitted in respect of item mentioned above. Clarification only can, however, be called for by Railway in respect of any part /document submitted by the tenderer which shall be responded to by the tenderer within 02 working days of the date of issue of such.
Technical Eligibility Criteria: (a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07(seven) years, ending last day of month previous to the one in which the tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered.
Defination of Similar Work :-"Repair/Overhauling/Supply, Installation, Testing & Commissioning (SITC) of HT/LT Transformer, HT/LT Switchgear, HT/LT Cables/ HT/LT Panels, 33/11 kV Substations "
5 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Partnership Deed (i)As per AGM/WR's instruction circulated by DGM's Law's office vide letter no. G350/Misc (Legal vetting) dated-13 .02.2024, the Partnership deed should be authenticated before the Notary Public/ Magistrate in addition to attested by the Notary Public. "BEFORE ME stamp, Seal & Signature of Notary Public/ Magistrate must on the Partnership Deed". OR the Registration Certificate and the latest true extract showing the details of the partners issued by the Registrar of Partnership Firms should be submitted. (ii)The initials of all the partners should be obtained on all pages of the Partnership D e e d . (iii)The partnership deed is deemed to have been executed from the date from which it has been notarized. (iv)It should be on 500 rupees stamp paper as per the Stamp Act applicable in the Maharashtra State. (v)The residential address of the partner should be mentioned on the partnership deed. (vi)The firm shall make all the corrections on the original partnership deed which is submitted along with the tender.
Power of Attorney (POA) (i)It should be on 500 rupees stamp paper as per the Stamp Act applicable in the Maharashtra State. (ii)The POA should be authenticated before the Notary Public/ Magistrate in addition to attested by the Notary Public. "BEFORE ME stamp, Seal & Signature of Notary Public/ Magistrate must on the POA". (iii)The initials of all the partners/directors/Executants should be obtained on all pages of the POA. (iv)The firm shall make all the corrections on the original POA which is submitted along with the tender. (v)Powers given to the Attorney Holder in POA should be sufficient to fulfill the terms and conditions of the tender /contract condition. (vi)Tender /LOA numbers and other factual aspects should be correctly mentioned in POA.
UPGRADATION OF POWER SUPPLY INFRASTRUCTURE FOR MAINTENANCE FACILITIES AT LOWER PAREL WORKSHOP
EL-WA-PL-2025-26-30~WR
EL-WA-PL-2025-26-30
Open
Works - General
12 Months
Mumbai, Maharashtra
₹0
₹3.4 L
20 Jan 2026
22 Dec 2025
6 Jan 2026
86 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 3,48,53,510.4 | ||
| — | 4.00 | — | — | ||
| Supply of 22 KV / 415 V 2 nos. 250 KVA Compact substation comprising of 2 nos. Incoming and 2 nos. outgoing HT switchgear and LT switchgears including foundation. | — | — | — | 1,62,25,990.4 | |
| — | 4.00 | — | — | ||
| Erection, testing and commissioning of 22 KV / 415 V 2 nos. 250 KVA Compact substation comprising of 2 nos. Incoming and 2nos. outgoing HT switchgear and LT switchgears including foundation. | — | — | — | 1,63,871.84 | |
| — | 2000.00 | — | — | ||
| Supply of 22 KV HT cable of size 3 core 240 sq.mm | — | — | — | 27,16,180 | |
| — | 2000.00 | — | — | ||
| Erection, testing and commissioning of 22 KV HT cable of size 3 core 240 sq.mm. | — | — | — | 2,17,380 | |
| — | 8.00 | — | — | ||
| Supply of heat shrinkable straight through joints. | — | — | — | 4,03,518.24 | |
| — | 8.00 | — | — | ||
| Erection, testing and commissioning of heat shrinkable straight through joints. | — | — | — | 878.32 | |
| — | 8.00 | — | — | ||
| Supply of heat shrinkable end termination | — | — | — | 1,35,386.4 | |
| — | 8.00 | — | — | ||
| Erection, testing and commissioning of heat shrinkable end termination | — | — | — | 5,959.2 | |
| — | 2500.00 | — | — | ||
| Supply of XLPE insulated, PVC sheathed, 1.1 KV grade cables as per IS. ( 4 C 300 sq.mm AL Conductor) | — | — | — | 30,62,500 | |
| — | 2500.00 | — | — | ||
| Laying, running, fixing of XLPE insulated, PVC sheathed, 1.1 KV grade cables as per IS. (4 C 300 sq.mm AL Conductor) | — | — | — | 2,00,725 | |
| — | 2000.00 | — | — | ||
| Excavation of HT / LT cable in all types of soil | — | — | — | 4,40,200 | |
| — | 2000.00 | — | — | ||
| Laying of cable through trenchless method by HDPE pipe of l60mm Dia. | — | — | — | 22,53,020 | |
| — | 1000.00 | — | — | ||
| Supply and laying of RCC pipe of size 4/6" dia 2 meter long. | — | — | — | 2,66,940 | |
| — | 4.00 | — | — | ||
| Supply for Upgradation of existing HT panel with indoor RMU, 1 VCB panel including protective devices, meters, and accessories | — | — | — | 36,91,210 | |
| — | 4.00 | — | — | ||
| Erection for Upgradation of existing HT panel with indoor RMU, 1 VCB panel including protective devices, meters, and accessories | — | — | — | 3,93,941 | |
| — | 4.00 | — | — | ||
| Design, supply of Auto power factor correction panel board | — | — | — | 3,67,999.68 | |
| — | 4.00 | — | — | ||
| Erection, testing and commissioning of Auto power factor correction panel board | — | — | — | 40,890.24 | |
| — | 16.00 | — | — | ||
| Supply and construct earth pits per IS 3043:1987, with CI pipes, GI strips, backfill, and masonry chamber with CI cover. | — | — | — | 1,28,175.36 | |
| — | 300.00 | — | — | ||
| Supply of GI earthing strip 50 mm x 6 mm | — | — | — | 1,08,792 | |
| — | 300.00 | — | — | ||
| Erection, testing and commissioning of GI earthing strip 50 mm x 6mm | — | — | — | 10,881 | |
| — | 8.00 | — | — | ||
| Supply of 600 x 600 x 3 mm copper plate earthing with enclosure, cover, watering pipe, and backfill. | — | — | — | 77,631.04 | |
| — | 8.00 | — | — | ||
| Erection of 600 x 600 x 3 mm copper plate earthing with enclosure, cover, watering pipe, and backfill. | — | — | — | 8,625.68 | |
| — | 2.00 | — | — | ||
| Design, supply, and install LT panel with (ACB- incoming & MCCB-Outgoing), digital instruments, bus-bar arrangement, conforming to IEC 60947-2/IS 13947:2008, and site requirements | — | — | — | 34,44,554 | |
| — | 40.00 | — | — | ||
| Supply, lay, fix, test, and commission LT straight-through joints (240-400 Sq.mm) as per IS, IE rules, and site requirements, with make Denson, Raychem, or equivalent. | — | — | — | 1,81,180.4 | |
| — | 40.00 | — | — | ||
| Supply of cable termination for 4 core x 120 - 400 Sq. mm. Al. Armoured LT XLPE cable. | — | — | — | 8,868.4 | |
| — | 40.00 | — | — | ||
| Erection of cable termination for 4 core x 120 - 400 Sq. mm. Al. Armoured LT XLPE cable. | — | — | — | 1,824.8 | |
| — | 120.00 | — | — | ||
| Supply of cable gland of size up to 185 - 400 sq. mm. | — | — | — | 53,430 | |
| — | 120.00 | — | — | ||
| Fixing of cable gland of size up to 185 - 400 sqmm as per specification | — | — | — | 5,912.4 | |
| — | 105.00 | — | — | ||
| Supply, erection of HT / LT cable route marker | — | — | — | 35,805 | |
| — | 4.00 | — | — | ||
| Dismantling of existing LT panel and deposit in store depot. | — | — | — | 2,01,240 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .