Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹17.7 LAdmitted-Finance | ₹17.7 L | Admitted-Finance |
| 2 | ₹23.2 LAdmitted-Finance | ₹23.2 L | Admitted-Finance |
| 3 | ₹24.4 LAdmitted-Finance | ₹24.4 L | Admitted-Finance |
| 4 | ₹24.6 LAdmitted-Finance | ₹24.6 L | Admitted-Finance |
| 5 | ₹24.6 LAdmitted-Finance | ₹24.6 L | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rama Industrial Corporation | D K CONSTRUCTION | DOUBLE AAR Contractors and Builders | M/s Somesh Enterprises | M/S MOHIT CONSTRUCTION | M/S A M construction | SHRI BIHARI JI CONTRACTOR | m/s VANSH CONSTRUCTIONS | M/S V. N. CONSTRUCTION | M/S ALIYA CONSTRUCTION | M/S ABHISHEK SHARMA | M/S PRAVESH CONSTRUCTION | M/S P R AND COMPANY | M/S UNIFY TRENDZ | SAHAY INFRASTRUCTURE | A G CONSTURCTION CORPORATION | M/S MATA PRASAD | M/s, Sri Madhav Ji Constaction | M/S S S G CONSTRUCTION | M/S MANU CONSTRUCTION CO, | SUBHASH CHAND SHARMA | M/s Saksham Construction | AMS Construction | M/S A.K. CONSTRUCTION | AGRA CONSTRUCTION AND SUPPLIERS | M/S SUNIL KUMAR JAIN | M/S BHAGWATI ENTERPRISES | M/s RAMA ENTERPRISES | M/S ASHISH CONSTRUCTION | Lavanya and co. | MATA DURGA CONSTRUCTIONS | M/S SHISHANT AGARWAL | M/S YASH CONSTRUCTION | KUSHAGRA CONSTRUCTIONS AND ENERGY | M/S SHREE RAM CONSTRUCTION | M/S BALAJI CONTRUCTION | SATISH CHAND | M/S SHREE RAM CONSTRUCTION | VED BUILDERS | M/S AKSHAT CONSTRUCTION | RAA Builders and Developers | TIRUPATI BUILDERS | M/S SUNIL CONSTRUCTION COMPANY | M/S KUMAR CONSTRUCTION | Shri Balaji Enterprises | OM ENTERPRISES | KESHAV DEV SHARMA CONTRACTOR AND SUPPLIERS | RADHEY RADHEY CONSTRUCTION AND SUPPLIERS | SHRI RADHA CONSTRUCTION | M/S RAM SHAKTI CONSTRUCTION | M/S KHUSHI CONSTRUCTION | A K ENTERPRISES | M/s VED ENTERPRISES | M/S G.G. INFRATECH | SOMENDRA CONSTRUCTION | AHA CONSTRUCTION | Kunal Infratech | ADITI RIDDHI INFRATECH | JAINTI PRASAD JAIN | REDHIKA INFRA | M/S DAKSH AND COMPANY | CHARU INTERNATIONAL | PMV CONSRUCION | ONN INFRATECH | SHRI MAHAKAL CONTRACTOR | M/S PRIYA BUILDERS | M/S PAWAR ASSOCIATE | OK TRADERS | M/S MAHADEV CONSTRUTION | S.S. ENTERPRISES | SHREE RADHEY CONSTRUCTION | Ram Sahay JI CONSTRUCTION | M/S MAHAVEERA CONSTRUCTION | BAKE BIHARI TRADERS | SHER SINGH CONTRACTOR | M/S KRISHNA ENTERPRISES | M/S TRIVANI CONSTRUCTION | DAYAN BUILDER | PULKIT CONSTRUCTION COMPANY | M/S RACHIT CONSTRUCTION | M/S SWASTI CONSTRUCTION | A S CONSTRUCTION | KAPOOR SINGH CONTRACTOR | M/S SRI RAM ENGINEERING WORKS | M/S VIJAY CONSTRUCTION CO. | M/S M K CONTRACTOR | M/s Parth Enterprises | RAJESH KAUSHAL | M/S SHANTI ASSOCIATES | M S CONSTRUCTION & SUPPLIERS | M/S TAJ CONSTRUCTION | G S INFRATECH | M/S DAKSH CONSTRUCTION | RABEE INFRATECH | SHYAM BALAJI ASSOCIATES | S S CONSTRUCTION | A k Trading.com | SHRI JI CONSTRUCTION | M/S LAVANAYA CONSTRUCTION | M/S P M Infrastructure | GEETA ENTERPRISES | SHIVANSH CONSTRUCTION | SHRI JI BUILDERS | JAI SHREE BALAJI CONSTRUCTION AND ENERGY | M/S SHREE RADHEY CONSTRUCTION | M/S SHARMA CONSTRUCTION | C N CORPORATION | AARNA CONSTRUCTIONS | UV INFRA ASSOCIATES | RBGINFRA | M/S NITYA PAVING AND CONSTRUCTION COMPANY | M/S RABEE EXPERT INFRATECH | NARWAR KHAD BHANDAR | GOPAL ENTERPRISES | Arya Infratech | shyam constructions | SANJANA CONSTRUCTION | KAANHA WINES | J P S INFRATECH | M/S A P CONTRACTOR AND CONSTRUCTION | NITIN CONSTRUCTION | M/S AARU ENTERPRISES | Maa Kalka Construction and Energy | RISHABH AND COMPANY | NAKSH CONSTRUCTION & DEVELOPMENT COMPANY | M/S SANJAY AND COMPANY | M/S YOGESH ENTERPRISES | Guru Vakyam Construction | M/S RAM JI ASSOCIATES | M/S S. K. VIRANI C/O NEERAJ KUMAR VIRANI | M/S SHRI BALAJI CONSTRUCTION | M/S G J INFRA | M/S VIKAS CONSTRUCTION | M/S J.M. ENTERPRISES | M/S Maa gayatri construction | M/S GURU JI ENTERPRISES | M/S V I P INFRATECH | K C CONSTRUCTION AND SUPPLIER |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) | 1 | Cum | - | 207.09 ₹207.09 Lowest | 230 ₹230 | 230.1 ₹230.1 | 230 ₹230 | 220 ₹220 | 229 ₹229 | 230 ₹230 | 228 ₹228 | 230 ₹230 | 230.05 ₹230.05 | 290 ₹290 | 229 ₹229 | 225 ₹225 | 235 ₹235 | 225.27 ₹225.27 | 230.05 ₹230.05 | 228 ₹228 | 229 ₹229 | 230.1 ₹230.1 | 230 ₹230 | 230 ₹230 | 225.5 ₹225.5 | 230.05 ₹230.05 | 230.05 ₹230.05 | 229 ₹229 | 229 ₹229 | 229 ₹229 | 228 ₹228 | 229 ₹229 | 230 ₹230 | 230 ₹230 | 230 ₹230 | 233.2 ₹233.2 | 220.1 ₹220.1 | 225 ₹225 | 230.05 ₹230.05 | 225 ₹225 | 230 ₹230 | 230 ₹230 | 230.05 ₹230.05 | 229.86 ₹229.86 | 230 ₹230 | 229 ₹229 | 230 ₹230 | 230.07 ₹230.07 | 229 ₹229 | 229.98 ₹229.98 | 225.5 ₹225.5 | 225 ₹225 | 280 ₹280 | 225.5 ₹225.5 | 229 ₹229 | 230.1 ₹230.1 | 230.04 ₹230.04 | 227.05 ₹227.05 | 230 ₹230 | 229 ₹229 | 229 ₹229 | 230.05 ₹230.05 | 228.5 ₹228.5 | 230.05 ₹230.05 | 260 ₹260 | 220.1 ₹220.1 | 229.5 ₹229.5 | 230 ₹230 | 229.1 ₹229.1 | 229 ₹229 | 225.5 ₹225.5 | 230.05 ₹230.05 | 230 ₹230 | 230.05 ₹230.05 | 227.8 ₹227.8 | 227.7 ₹227.7 | 228 ₹228 | 230 ₹230 | 230 ₹230 | 230.07 ₹230.07 | 229.86 ₹229.86 | 275 ₹275 | 230 ₹230 | 230 ₹230 | 229 ₹229 | 230.05 ₹230.05 | 225.5 ₹225.5 | 229 ₹229 | 230 ₹230 | 229 ₹229 | 230.05 ₹230.05 | 230 ₹230 | 230.07 ₹230.07 | 230.1 ₹230.1 | 230 ₹230 | 230 ₹230 | 229.1 ₹229.1 | 230.1 ₹230.1 | 228.5 ₹228.5 | 230.1 ₹230.1 | 228.6 ₹228.6 | 229 ₹229 | 228.6 ₹228.6 | 229 ₹229 | 227.8 ₹227.8 | 230 ₹230 | 229.5 ₹229.5 | 230.05 ₹230.05 | 229.1 ₹229.1 | 228 ₹228 | 225 ₹225 | 225 ₹225 | 230 ₹230 | 230 ₹230 | 229 ₹229 | 230.1 ₹230.1 | 230 ₹230 | 229 ₹229 | 229 ₹229 | 229.1 ₹229.1 | 228 ₹228 | 229.5 ₹229.5 | 229 ₹229 | 225 ₹225 | 230.07 ₹230.07 | 230.5 ₹230.5 | 228.95 ₹228.95 | 224.34 ₹224.34 | 229 ₹229 | 229.1 ₹229.1 | 227.8 ₹227.8 | 229.1 ₹229.1 | 225.5 ₹225.5 | 224.83 ₹224.83 | 230 ₹230 | 228 ₹228 | 229 ₹229 | 224 ₹224 | 229.6 ₹229.6 | 230 ₹230 |
| 2.00 | Cartage of Earth/Malva up to 90 meters by head load (1 Chain only) including loading & unloading etc. all Complete. (3-Chapter Sr..No.234) | 1 | Cum | - | 31.5 ₹31.5 | 35 ₹35 | 35 ₹35 | 35 ₹35 | 35 ₹35 | 34.5 ₹34.5 | 24 ₹24 Lowest | 33 ₹33 | 34.9 ₹34.9 | 34.99 ₹34.99 | 100 ₹100 | 35 ₹35 | 34 ₹34 | 50 ₹50 | 34.27 ₹34.27 | 34.99 ₹34.99 | 33 ₹33 | 34.5 ₹34.5 | 35 ₹35 | 35 ₹35 | 34.9 ₹34.9 | 34.3 ₹34.3 | 34.99 ₹34.99 | 34.99 ₹34.99 | 35 ₹35 | 26 ₹26 | 26 ₹26 | 34.6 ₹34.6 | 34 ₹34 | 34 ₹34 | 34.9 ₹34.9 | 34.9 ₹34.9 | 34 ₹34 | 33 ₹33 | 34 ₹34 | 34.99 ₹34.99 | 34 ₹34 | 34.9 ₹34.9 | 34 ₹34 | 34.95 ₹34.95 | 34.96 ₹34.96 | 35 ₹35 | 34 ₹34 | 35 ₹35 | 34.99 ₹34.99 | 34.5 ₹34.5 | 34.88 ₹34.88 | 34.3 ₹34.3 | 34 ₹34 | 75 ₹75 | 34.3 ₹34.3 | 34 ₹34 | 35 ₹35 | 34.98 ₹34.98 | 34 ₹34 | 34.5 ₹34.5 | 35 ₹35 | 35 ₹35 | 34.99 ₹34.99 | 34 ₹34 | 34.99 ₹34.99 | 55 ₹55 | 33 ₹33 | 34.5 ₹34.5 | 34 ₹34 | 34 ₹34 | 34.5 ₹34.5 | 34.5 ₹34.5 | 34.99 ₹34.99 | 35 ₹35 | 34.99 ₹34.99 | 34.3 ₹34.3 | 34.65 ₹34.65 | 35 ₹35 | 24 ₹24 Lowest | 34 ₹34 | 34.99 ₹34.99 | 34.96 ₹34.96 | 95 ₹95 | 24 ₹24 Lowest | 35 ₹35 | 35 ₹35 | 34.99 ₹34.99 | 34.5 ₹34.5 | 34 ₹34 | 35 ₹35 | 35 ₹35 | 34.99 ₹34.99 | 35 ₹35 | 34.99 ₹34.99 | 35 ₹35 | 35 ₹35 | 34 ₹34 | 34 ₹34 | 35 ₹35 | 35 ₹35 | 35 ₹35 | 34 ₹34 | 34.5 ₹34.5 | 34 ₹34 | 34 ₹34 | 34.65 ₹34.65 | 34.9 ₹34.9 | 34.5 ₹34.5 | 34.99 ₹34.99 | 34 ₹34 | 33 ₹33 | 33 ₹33 | 34 ₹34 | 34 ₹34 | 34 ₹34 | 35 ₹35 | 35 ₹35 | 35 ₹35 | 34 ₹34 | 35 ₹35 | 34 ₹34 | 35 ₹35 | 34 ₹34 | 35 ₹35 | 35 ₹35 | 34.99 ₹34.99 | 65 ₹65 | 34.83 ₹34.83 | 33.95 ₹33.95 | 26 ₹26 | 34 ₹34 | 34.65 ₹34.65 | 34 ₹34 | 34.5 ₹34.5 | 34.2 ₹34.2 | 24 ₹24 Lowest | 35 ₹35 | 26 ₹26 | 35 ₹35 | 34 ₹34 | 34 ₹34 |
| 3.00 | Cartage of Earth/Malva up to 90 meters by head load (2 Chain only) including loading & unloading etc. all Complete. (3-Chapter Sr..No.234) | 1 | Cum | - | 63 ₹63 | 70 ₹70 | 70 ₹70 | 70 ₹70 | 70 ₹70 | 69.5 ₹69.5 | 69 ₹69 | 6 ₹6 Lowest | 69.9 ₹69.9 | 69.95 ₹69.95 | 90 ₹90 | 70 ₹70 | 69.5 ₹69.5 | 75 ₹75 | 68.53 ₹68.53 | 69.8 ₹69.8 | 68 ₹68 | 71 ₹71 | 70 ₹70 | 70 ₹70 | 69.7 ₹69.7 | 68.6 ₹68.6 | 69.95 ₹69.95 | 69.95 ₹69.95 | 70 ₹70 | 69 ₹69 | 69 ₹69 | 68 ₹68 | 68 ₹68 | 69 ₹69 | 69.7 ₹69.7 | 69.7 ₹69.7 | 67 ₹67 | 66 ₹66 | 68 ₹68 | 69.95 ₹69.95 | 69.5 ₹69.5 | 69.5 ₹69.5 | 69 ₹69 | 69.95 ₹69.95 | 69.93 ₹69.93 | 71 ₹71 | 69 ₹69 | 70 ₹70 | 69.95 ₹69.95 | 69.5 ₹69.5 | 69.88 ₹69.88 | 68.6 ₹68.6 | 68 ₹68 | 100 ₹100 | 68.6 ₹68.6 | 69 ₹69 | 70 ₹70 | 69.97 ₹69.97 | 67 ₹67 | 69.5 ₹69.5 | 70 ₹70 | 70 ₹70 | 69.95 ₹69.95 | 67 ₹67 | 69.95 ₹69.95 | 90 ₹90 | 66 ₹66 | 69.5 ₹69.5 | 69 ₹69 | 69 ₹69 | 69 ₹69 | 68.5 ₹68.5 | 69.95 ₹69.95 | 69 ₹69 | 69.95 ₹69.95 | 69.3 ₹69.3 | 69.3 ₹69.3 | 70 ₹70 | 69 ₹69 | 67 ₹67 | 69.95 ₹69.95 | 69.93 ₹69.93 | 100 ₹100 | 69 ₹69 | 70 ₹70 | 70 ₹70 | 69.95 ₹69.95 | 68.5 ₹68.5 | 69 ₹69 | 70 ₹70 | 70 ₹70 | 69.95 ₹69.95 | 70 ₹70 | 69.95 ₹69.95 | 70 ₹70 | 70 ₹70 | 69 ₹69 | 69 ₹69 | 70 ₹70 | 70 ₹70 | 70 ₹70 | 67 ₹67 | 69.8 ₹69.8 | 67 ₹67 | 69 ₹69 | 69.3 ₹69.3 | 69.9 ₹69.9 | 69.5 ₹69.5 | 69.95 ₹69.95 | 67 ₹67 | 68 ₹68 | 68 ₹68 | 68 ₹68 | 69 ₹69 | 69 ₹69 | 70 ₹70 | 70 ₹70 | 70 ₹70 | 69 ₹69 | 70 ₹70 | 69 ₹69 | 70 ₹70 | 67 ₹67 | 70 ₹70 | 65 ₹65 | 69.95 ₹69.95 | 90 ₹90 | 69.65 ₹69.65 | 68.25 ₹68.25 | 69 ₹69 | 69 ₹69 | 69.3 ₹69.3 | 69 ₹69 | 68.5 ₹68.5 | 68.4 ₹68.4 | 69 ₹69 | 70 ₹70 | 69 ₹69 | 65 ₹65 | 67 ₹67 | 69 ₹69 |
| 4.00 | Cartage of Earth/Malva up to 90 meters by head load (3 Chain only) including loading & unloading etc. all Complete. (3-Chapter Sr..No.234) | 1 | Cum | - | 94.5 ₹94.5 Lowest | 105 ₹105 | 105 ₹105 | 105 ₹105 | 105 ₹105 | 104 ₹104 | 100 ₹100 | 103 ₹103 | 104.9 ₹104.9 | 104.99 ₹104.99 | 120 ₹120 | 105 ₹105 | 104 ₹104 | 106 ₹106 | 102.8 ₹102.8 | 104 ₹104 | 102 ₹102 | 103 ₹103 | 105 ₹105 | 105 ₹105 | 104 ₹104 | 102.9 ₹102.9 | 104.99 ₹104.99 | 104.99 ₹104.99 | 104 ₹104 | 101 ₹101 | 101 ₹101 | 103 ₹103 | 101 ₹101 | 104 ₹104 | 104 ₹104 | 104 ₹104 | 102.2 ₹102.2 | 99 ₹99 | 104 ₹104 | 104.99 ₹104.99 | 104 ₹104 | 104.5 ₹104.5 | 104 ₹104 | 104.95 ₹104.95 | 104.89 ₹104.89 | 104 ₹104 | 104 ₹104 | 105 ₹105 | 104.99 ₹104.99 | 104 ₹104 | 104.88 ₹104.88 | 102.9 ₹102.9 | 104 ₹104 | 140 ₹140 | 102.9 ₹102.9 | 104 ₹104 | 105 ₹105 | 104.96 ₹104.96 | 102.2 ₹102.2 | 104 ₹104 | 105 ₹105 | 104 ₹104 | 104.99 ₹104.99 | 102.2 ₹102.2 | 104.99 ₹104.99 | 120 ₹120 | 99 ₹99 | 104.9 ₹104.9 | 104 ₹104 | 104 ₹104 | 104 ₹104 | 104.9 ₹104.9 | 104.99 ₹104.99 | 105 ₹105 | 104.99 ₹104.99 | 103.95 ₹103.95 | 103.95 ₹103.95 | 105 ₹105 | 100 ₹100 | 102.2 ₹102.2 | 104.99 ₹104.99 | 104.89 ₹104.89 | 125 ₹125 | 100 ₹100 | 105 ₹105 | 105 ₹105 | 104.99 ₹104.99 | 104.9 ₹104.9 | 104 ₹104 | 105 ₹105 | 105 ₹105 | 104.99 ₹104.99 | 105 ₹105 | 104.99 ₹104.99 | 105 ₹105 | 105 ₹105 | 104 ₹104 | 104 ₹104 | 105 ₹105 | 104.5 ₹104.5 | 105 ₹105 | 102.2 ₹102.2 | 104 ₹104 | 102.2 ₹102.2 | 104 ₹104 | 103.95 ₹103.95 | 104.9 ₹104.9 | 104.9 ₹104.9 | 104.99 ₹104.99 | 102.2 ₹102.2 | 103 ₹103 | 103 ₹103 | 104 ₹104 | 104 ₹104 | 104 ₹104 | 105 ₹105 | 105 ₹105 | 105 ₹105 | 104 ₹104 | 105 ₹105 | 104 ₹104 | 105 ₹105 | 102.2 ₹102.2 | 105 ₹105 | 98 ₹98 | 104.99 ₹104.99 | 120 ₹120 | 104.48 ₹104.48 | 101.85 ₹101.85 | 101 ₹101 | 104 ₹104 | 103.95 ₹103.95 | 104 ₹104 | 104.9 ₹104.9 | 102.6 ₹102.6 | 100 ₹100 | 105 ₹105 | 101 ₹101 | 98 ₹98 | 102.2 ₹102.2 | 104 ₹104 |
| 5.00 | Earth work in Filling in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 8km. form the foundation trenches including royalty@ 9.00 per cum. (Chapter No.4 PWD.SCH.-253(a)+ CPTR No. 3 1 to 8 Km.) | 1 | Cum | - | 291.15 ₹291.15 Lowest | 323 ₹323 | 323.5 ₹323.5 | 323 ₹323 | 323 ₹323 | 323 ₹323 | 320 ₹320 | 321 ₹321 | 323.4 ₹323.4 | 323.45 ₹323.45 | 370 ₹370 | 323 ₹323 | 323 ₹323 | 324 ₹324 | 316.71 ₹316.71 | 323 ₹323 | 320 ₹320 | 325 ₹325 | 323 ₹323 | 323 ₹323 | 323 ₹323 | 317.03 ₹317.03 | 323.45 ₹323.45 | 323.45 ₹323.45 | 322 ₹322 | 322 ₹322 | 322 ₹322 | 320 ₹320 | 321 ₹321 | 322 ₹322 | 323 ₹323 | 323 ₹323 | 319.5 ₹319.5 | 319.08 ₹319.08 | 320 ₹320 | 323.45 ₹323.45 | 323 ₹323 | 323 ₹323 | 322 ₹322 | 323.45 ₹323.45 | 323.17 ₹323.17 | 325 ₹325 | 322 ₹322 | 323 ₹323 | 323.45 ₹323.45 | 323 ₹323 | 323.38 ₹323.38 | 317.03 ₹317.03 | 320 ₹320 | 380 ₹380 | 317.03 ₹317.03 | 322 ₹322 | 323 ₹323 | 323.4 ₹323.4 | 319.5 ₹319.5 | 323.4 ₹323.4 | 323 ₹323 | 322 ₹322 | 323.45 ₹323.45 | 319.5 ₹319.5 | 323.45 ₹323.45 | 400 ₹400 | 319.08 ₹319.08 | 323 ₹323 | 322 ₹322 | 322.5 ₹322.5 | 323 ₹323 | 323 ₹323 | 323.45 ₹323.45 | 320 ₹320 | 323.45 ₹323.45 | 317.03 ₹317.03 | 320.26 ₹320.26 | 323 ₹323 | 320 ₹320 | 319.5 ₹319.5 | 323.45 ₹323.45 | 323.17 ₹323.17 | 365 ₹365 | 320 ₹320 | 323 ₹323 | 323 ₹323 | 323.45 ₹323.45 | 323 ₹323 | 322 ₹322 | 323 ₹323 | 323 ₹323 | 323.45 ₹323.45 | 323 ₹323 | 323.45 ₹323.45 | 323.5 ₹323.5 | 323 ₹323 | 322 ₹322 | 322.5 ₹322.5 | 323.5 ₹323.5 | 322 ₹322 | 323.5 ₹323.5 | 319.5 ₹319.5 | 321 ₹321 | 319.5 ₹319.5 | 322 ₹322 | 320.27 ₹320.27 | 323 ₹323 | 323 ₹323 | 323.45 ₹323.45 | 319.5 ₹319.5 | 321 ₹321 | 318.15 ₹318.15 | 320 ₹320 | 322 ₹322 | 322 ₹322 | 323 ₹323 | 323.5 ₹323.5 | 323 ₹323 | 322 ₹322 | 323 ₹323 | 322.5 ₹322.5 | 323 ₹323 | 319.5 ₹319.5 | 323 ₹323 | 300 ₹300 | 323.45 ₹323.45 | 370 ₹370 | 321.88 ₹321.88 | 315.41 ₹315.41 | 322 ₹322 | 322.5 ₹322.5 | 320.27 ₹320.27 | 322.5 ₹322.5 | 323 ₹323 | 316.09 ₹316.09 | 320 ₹320 | 323 ₹323 | 322 ₹322 | 300 ₹300 | 319.5 ₹319.5 | 322 ₹322 |
| 6.00 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) | 1 | Cum | - | 135 ₹135 | 150 ₹150 | 150 ₹150 | 150 ₹150 | 150 ₹150 | 149 ₹149 | 150 ₹150 | 149 ₹149 | 149.9 ₹149.9 | 149.99 ₹149.99 | 190 ₹190 | 150 ₹150 | 149 ₹149 | 151 ₹151 | 146.85 ₹146.85 | 149 ₹149 | 150 ₹150 | 149 ₹149 | 148 ₹148 | 150 ₹150 | 149 ₹149 | 147 ₹147 | 149.99 ₹149.99 | 149.99 ₹149.99 | 149.5 ₹149.5 | 150 ₹150 | 150 ₹150 | 148 ₹148 | 145 ₹145 | 149 ₹149 | 149 ₹149 | 149 ₹149 | 148 ₹148 | 145 ₹145 | 148 ₹148 | 149.99 ₹149.99 | 149 ₹149 | 149 ₹149 | 149 ₹149 | 149.95 ₹149.95 | 149.85 ₹149.85 | 149 ₹149 | 149 ₹149 | 150 ₹150 | 149.99 ₹149.99 | 149 ₹149 | 149.88 ₹149.88 | 147 ₹147 | 148 ₹148 | 180 ₹180 | 147 ₹147 | 149 ₹149 | 148 ₹148 | 149.95 ₹149.95 | 148 ₹148 | 149.5 ₹149.5 | 150 ₹150 | 149.5 ₹149.5 | 149.99 ₹149.99 | 148 ₹148 | 149.99 ₹149.99 | 127.5 ₹127.5 Lowest | 145 ₹145 | 149 ₹149 | 149 ₹149 | 149 ₹149 | 149 ₹149 | 149 ₹149 | 149.99 ₹149.99 | 149 ₹149 | 149.99 ₹149.99 | 148.5 ₹148.5 | 148.5 ₹148.5 | 150 ₹150 | 150 ₹150 | 148 ₹148 | 149.99 ₹149.99 | 149.85 ₹149.85 | 170 ₹170 | 150 ₹150 | 150 ₹150 | 150 ₹150 | 149.99 ₹149.99 | 149 ₹149 | 149 ₹149 | 150 ₹150 | 150 ₹150 | 149.99 ₹149.99 | 150 ₹150 | 149.99 ₹149.99 | 150 ₹150 | 150 ₹150 | 149 ₹149 | 140 ₹140 | 150 ₹150 | 148 ₹148 | 150 ₹150 | 148 ₹148 | 149 ₹149 | 148 ₹148 | 149 ₹149 | 148.5 ₹148.5 | 149.9 ₹149.9 | 149 ₹149 | 149.99 ₹149.99 | 148 ₹148 | 148 ₹148 | 147 ₹147 | 148 ₹148 | 149 ₹149 | 149 ₹149 | 150 ₹150 | 150 ₹150 | 150 ₹150 | 149 ₹149 | 150 ₹150 | 149 ₹149 | 150 ₹150 | 148 ₹148 | 150 ₹150 | 148 ₹148 | 149.99 ₹149.99 | 190 ₹190 | 149.25 ₹149.25 | 146.25 ₹146.25 | 150 ₹150 | 149 ₹149 | 148.5 ₹148.5 | 140 ₹140 | 149 ₹149 | 146.57 ₹146.57 | 150 ₹150 | 150 ₹150 | 150 ₹150 | 148 ₹148 | 148 ₹148 | 149 ₹149 |
| 7.00 | Earth work in Excavation in foundation in ordinary soil mixed with moorum shingle kankar requiring the use of special tools and Plants such a pick axes subbals etc. including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) | 1 | Cum | - | 139.5 ₹139.5 | 155 ₹155 | 155 ₹155 | 155 ₹155 | 155 ₹155 | 154 ₹154 | 150 ₹150 | 154 ₹154 | 154.9 ₹154.9 | 154.95 ₹154.95 | 190 ₹190 | 155 ₹155 | 153 ₹153 | 156 ₹156 | 151.75 ₹151.75 | 154 ₹154 | 153 ₹153 | 154 ₹154 | 155 ₹155 | 155 ₹155 | 154 ₹154 | 151.9 ₹151.9 | 154.95 ₹154.95 | 154.95 ₹154.95 | 152 ₹152 | 152 ₹152 | 152 ₹152 | 153 ₹153 | 152 ₹152 | 154 ₹154 | 154 ₹154 | 154 ₹154 | 147.5 ₹147.5 | 150 ₹150 | 150 ₹150 | 154.95 ₹154.95 | 153 ₹153 | 154 ₹154 | 154 ₹154 | 154.95 ₹154.95 | 154.85 ₹154.85 | 154 ₹154 | 154 ₹154 | 152 ₹152 | 154.95 ₹154.95 | 154 ₹154 | 154.88 ₹154.88 | 151.9 ₹151.9 | 150 ₹150 | 200 ₹200 | 151.9 ₹151.9 | 154 ₹154 | 155 ₹155 | 154.96 ₹154.96 | 147.5 ₹147.5 | 154.8 ₹154.8 | 152 ₹152 | 152 ₹152 | 154.95 ₹154.95 | 147.5 ₹147.5 | 154.95 ₹154.95 | 131.75 ₹131.75 Lowest | 150 ₹150 | 154 ₹154 | 154 ₹154 | 154 ₹154 | 154 ₹154 | 154 ₹154 | 154.95 ₹154.95 | 150 ₹150 | 154.95 ₹154.95 | 151.9 ₹151.9 | 153.45 ₹153.45 | 152 ₹152 | 150 ₹150 | 147.5 ₹147.5 | 154.95 ₹154.95 | 154.85 ₹154.85 | 180 ₹180 | 150 ₹150 | 152 ₹152 | 152 ₹152 | 154.95 ₹154.95 | 154 ₹154 | 154 ₹154 | 152 ₹152 | 152 ₹152 | 154.95 ₹154.95 | 152 ₹152 | 154.95 ₹154.95 | 155 ₹155 | 155 ₹155 | 154 ₹154 | 154 ₹154 | 155 ₹155 | 154 ₹154 | 155 ₹155 | 147.5 ₹147.5 | 153 ₹153 | 147.5 ₹147.5 | 154 ₹154 | 153.45 ₹153.45 | 154.9 ₹154.9 | 154 ₹154 | 154.95 ₹154.95 | 147.5 ₹147.5 | 153 ₹153 | 148 ₹148 | 150 ₹150 | 154 ₹154 | 154 ₹154 | 152 ₹152 | 155 ₹155 | 155 ₹155 | 154 ₹154 | 152 ₹152 | 154 ₹154 | 152 ₹152 | 147.5 ₹147.5 | 152 ₹152 | 150 ₹150 | 154.95 ₹154.95 | 170 ₹170 | 154.23 ₹154.23 | 150.35 ₹150.35 | 152 ₹152 | 154 ₹154 | 153.45 ₹153.45 | 154 ₹154 | 154 ₹154 | 151.45 ₹151.45 | 150 ₹150 | 152 ₹152 | 152 ₹152 | 150 ₹150 | 147.5 ₹147.5 | 154 ₹154 |
| 8.00 | Extra for Earth work in embankment mechanically compacted to 98% proctor density ln ordinary soil, excavation to be done form of regular pits not exceeding 0.5mtr in depth and work in embankment to be in 20cm layer including ramming and dressing pulverization surfacing including Supply of Labour, T&P, Roller and water sprinkle | 1 | Cum | - | 36 ₹36 | 40 ₹40 | 40 ₹40 | 40 ₹40 | 40 ₹40 | 39.5 ₹39.5 | 40 ₹40 | 39 ₹39 | 39.9 ₹39.9 | 39.99 ₹39.99 | 55 ₹55 | 40 ₹40 | 39.5 ₹39.5 | 45 ₹45 | 39.16 ₹39.16 | 39.8 ₹39.8 | 38 ₹38 | 38.6 ₹38.6 | 40 ₹40 | 40 ₹40 | 39.7 ₹39.7 | 39.2 ₹39.2 | 39.99 ₹39.99 | 39.99 ₹39.99 | 40 ₹40 | 40 ₹40 | 40 ₹40 | 39 ₹39 | 39 ₹39 | 39 ₹39 | 39.7 ₹39.7 | 39.7 ₹39.7 | 38.1 ₹38.1 | 38 ₹38 | 38 ₹38 | 39.99 ₹39.99 | 39.5 ₹39.5 | 39 ₹39 | 39 ₹39 | 39.95 ₹39.95 | 39.96 ₹39.96 | 41 ₹41 | 39 ₹39 | 40 ₹40 | 39.99 ₹39.99 | 39 ₹39 | 39.88 ₹39.88 | 39.2 ₹39.2 | 38 ₹38 | 60 ₹60 | 39.2 ₹39.2 | 39 ₹39 | 40 ₹40 | 39.98 ₹39.98 | 38.1 ₹38.1 | 40 ₹40 | 40 ₹40 | 40 ₹40 | 39.99 ₹39.99 | 38.1 ₹38.1 | 39.99 ₹39.99 | 34 ₹34 Lowest | 38 ₹38 | 39 ₹39 | 39 ₹39 | 39 ₹39 | 39 ₹39 | 39 ₹39 | 39.99 ₹39.99 | 39 ₹39 | 39.99 ₹39.99 | 39.6 ₹39.6 | 39.6 ₹39.6 | 40 ₹40 | 40 ₹40 | 38.1 ₹38.1 | 39.99 ₹39.99 | 39.96 ₹39.96 | 60 ₹60 | 40 ₹40 | 40 ₹40 | 40 ₹40 | 39.99 ₹39.99 | 39 ₹39 | 39 ₹39 | 40 ₹40 | 40 ₹40 | 39.99 ₹39.99 | 40 ₹40 | 39.99 ₹39.99 | 40 ₹40 | 40 ₹40 | 39 ₹39 | 39 ₹39 | 40 ₹40 | 40 ₹40 | 40 ₹40 | 38.1 ₹38.1 | 39.5 ₹39.5 | 38.1 ₹38.1 | 39 ₹39 | 39.6 ₹39.6 | 39.9 ₹39.9 | 39 ₹39 | 39.99 ₹39.99 | 38.1 ₹38.1 | 38 ₹38 | 38 ₹38 | 38 ₹38 | 39 ₹39 | 39 ₹39 | 40 ₹40 | 40 ₹40 | 40 ₹40 | 39 ₹39 | 40 ₹40 | 39 ₹39 | 40 ₹40 | 38.1 ₹38.1 | 40 ₹40 | 40 ₹40 | 39.99 ₹39.99 | 55 ₹55 | 39.8 ₹39.8 | 39 ₹39 | 40 ₹40 | 41 ₹41 | 39.6 ₹39.6 | 39 ₹39 | 39 ₹39 | 39.08 ₹39.08 | 40 ₹40 | 40 ₹40 | 40 ₹40 | 40 ₹40 | 38.1 ₹38.1 | 39 ₹39 |
| 9.00 | Back filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5 m incl. cost of all labor complete as per specifications | 1 | Cum | - | 165.67 ₹165.67 | 184 ₹184 | 184 ₹184 | 184 ₹184 | 184 ₹184 | 183.8 ₹183.8 | 180 ₹180 | 180 ₹180 | 184 ₹184 | 184.06 ₹184.06 | 255 ₹255 | 184 ₹184 | 184 ₹184 | 185 ₹185 | 180.21 ₹180.21 | 184 ₹184 | 182 ₹182 | 184 ₹184 | 184 ₹184 | 184 ₹184 | 184 ₹184 | 180.4 ₹180.4 | 184.06 ₹184.06 | 184.06 ₹184.06 | 180 ₹180 | 182 ₹182 | 182 ₹182 | 182 ₹182 | 182 ₹182 | 180 ₹180 | 184 ₹184 | 184 ₹184 | 181.6 ₹181.6 | 183.08 ₹183.08 | 180 ₹180 | 184.06 ₹184.06 | 184 ₹184 | 183 ₹183 | 180 ₹180 | 184.03 ₹184.03 | 183.89 ₹183.89 | 184 ₹184 | 183 ₹183 | 180 ₹180 | 184.06 ₹184.06 | 184 ₹184 | 183.96 ₹183.96 | 180.4 ₹180.4 | 180 ₹180 | 250 ₹250 | 180.4 ₹180.4 | 183 ₹183 | 184 ₹184 | 184.05 ₹184.05 | 181.6 ₹181.6 | 184 ₹184 | 180 ₹180 | 180 ₹180 | 184.06 ₹184.06 | 181.6 ₹181.6 | 184.06 ₹184.06 | 156.47 ₹156.47 Lowest | 183.08 ₹183.08 | 183.8 ₹183.8 | 180 ₹180 | 183.08 ₹183.08 | 183 ₹183 | 183.8 ₹183.8 | 184.06 ₹184.06 | 183 ₹183 | 184.06 ₹184.06 | 182.24 ₹182.24 | 182.23 ₹182.23 | 180 ₹180 | 180 ₹180 | 181.6 ₹181.6 | 184.06 ₹184.06 | 183.89 ₹183.89 | 240 ₹240 | 180 ₹180 | 180 ₹180 | 180 ₹180 | 184.06 ₹184.06 | 183.8 ₹183.8 | 183 ₹183 | 180 ₹180 | 180 ₹180 | 184.06 ₹184.06 | 180 ₹180 | 184.06 ₹184.06 | 184.08 ₹184.08 | 184 ₹184 | 180 ₹180 | 183.08 ₹183.08 | 184 ₹184 | 182 ₹182 | 184 ₹184 | 181.6 ₹181.6 | 183 ₹183 | 181.6 ₹181.6 | 183 ₹183 | 182.24 ₹182.24 | 184 ₹184 | 183.8 ₹183.8 | 184.06 ₹184.06 | 181.6 ₹181.6 | 182 ₹182 | 181 ₹181 | 180 ₹180 | 180 ₹180 | 180 ₹180 | 180 ₹180 | 184 ₹184 | 184 ₹184 | 182 ₹182 | 180 ₹180 | 183.08 ₹183.08 | 180 ₹180 | 181.6 ₹181.6 | 180 ₹180 | 180 ₹180 | 184.06 ₹184.06 | 220 ₹220 | 183.16 ₹183.16 | 182.2 ₹182.2 | 182 ₹182 | 183.08 ₹183.08 | 182.24 ₹182.24 | 183.08 ₹183.08 | 183.8 ₹183.8 | 179.87 ₹179.87 | 180 ₹180 | 180 ₹180 | 182 ₹182 | 180 ₹180 | 181.6 ₹181.6 | 180 ₹180 |
| 10.00 | Earth work in Excavation in ordinary soil with manually/hydrolic excavater in foundation/Trench or drains. (a) Lift up 1.50m to 3m. | 1 | Cum | - | 153 ₹153 | 170 ₹170 | 170 ₹170 | 170 ₹170 | 170 ₹170 | 169 ₹169 | 169 ₹169 | 169 ₹169 | 169.9 ₹169.9 | 169.99 ₹169.99 | 200 ₹200 | 170 ₹170 | 169 ₹169 | 171 ₹171 | 166.43 ₹166.43 | 168 ₹168 | 168 ₹168 | 169 ₹169 | 170 ₹170 | 170 ₹170 | 170 ₹170 | 166.6 ₹166.6 | 169.99 ₹169.99 | 169.99 ₹169.99 | 170 ₹170 | 169 ₹169 | 169 ₹169 | 165 ₹165 | 166 ₹166 | 169 ₹169 | 170 ₹170 | 170 ₹170 | 165.9 ₹165.9 | 165 ₹165 | 168 ₹168 | 169.99 ₹169.99 | 169 ₹169 | 165 ₹165 | 169 ₹169 | 169.95 ₹169.95 | 169.83 ₹169.83 | 172 ₹172 | 169 ₹169 | 170 ₹170 | 169.99 ₹169.99 | 169 ₹169 | 169.88 ₹169.88 | 166.6 ₹166.6 | 168 ₹168 | 210 ₹210 | 166.6 ₹166.6 | 169 ₹169 | 170 ₹170 | 169.98 ₹169.98 | 165.9 ₹165.9 | 169.5 ₹169.5 | 170 ₹170 | 170 ₹170 | 169.99 ₹169.99 | 165.9 ₹165.9 | 169.99 ₹169.99 | 144.5 ₹144.5 Lowest | 165 ₹165 | 169 ₹169 | 169 ₹169 | 169 ₹169 | 169 ₹169 | 169 ₹169 | 169.99 ₹169.99 | 168 ₹168 | 169.99 ₹169.99 | 166.6 ₹166.6 | 168.3 ₹168.3 | 170 ₹170 | 169 ₹169 | 165.9 ₹165.9 | 169.99 ₹169.99 | 169.83 ₹169.83 | 220 ₹220 | 169 ₹169 | 170 ₹170 | 170 ₹170 | 169.99 ₹169.99 | 169 ₹169 | 169 ₹169 | 170 ₹170 | 170 ₹170 | 169.99 ₹169.99 | 170 ₹170 | 169.99 ₹169.99 | 170 ₹170 | 170 ₹170 | 169 ₹169 | 169 ₹169 | 170 ₹170 | 168 ₹168 | 170 ₹170 | 165.9 ₹165.9 | 169 ₹169 | 165.9 ₹165.9 | 169 ₹169 | 168.3 ₹168.3 | 169.9 ₹169.9 | 169 ₹169 | 169.99 ₹169.99 | 165.9 ₹165.9 | 168 ₹168 | 168 ₹168 | 168 ₹168 | 169 ₹169 | 169 ₹169 | 170 ₹170 | 170 ₹170 | 170 ₹170 | 168 ₹168 | 170 ₹170 | 169 ₹169 | 170 ₹170 | 165.9 ₹165.9 | 170 ₹170 | 168 ₹168 | 169.99 ₹169.99 | 205 ₹205 | 169.15 ₹169.15 | 167.45 ₹167.45 | 169 ₹169 | 169 ₹169 | 168.3 ₹168.3 | 169 ₹169 | 169 ₹169 | 166.11 ₹166.11 | 169 ₹169 | 170 ₹170 | 169 ₹169 | 168 ₹168 | 165.9 ₹165.9 | 169 ₹169 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
6 May 2026, 12:00 pmClosed
CHIEF ENGINEER
nagar nigam agra
Obtaining Item-wise Rates for Execution of Construction Works
2026_DOLBU_1139302_1
16-04-2026/NAGAR NIGAM AGRA/06-05-2026/123
Open Tender
Construction Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NAGAR NIGAM
₹1 L
16 Jun 2026
25 Apr 2026
6 May 2026
25 Apr 2026
6 May 2026
25 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) | 1 | Cum | 230.1 | ₹230.1 |
| 2 | Cartage of Earth/Malva up to 90 meters by head load (1 Chain only) including loading & unloading etc. all Complete. (3-Chapter Sr..No.234) | 1 | Cum | 35 | ₹35 |
| 3 | Cartage of Earth/Malva up to 90 meters by head load (2 Chain only) including loading & unloading etc. all Complete. (3-Chapter Sr..No.234) | 1 | Cum | 70 | ₹70 |
| 4 | Cartage of Earth/Malva up to 90 meters by head load (3 Chain only) including loading & unloading etc. all Complete. (3-Chapter Sr..No.234) | 1 | Cum | 105 | ₹105 |
| 5 | Earth work in Filling in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 8km. form the foundation trenches including royalty@ 9.00 per cum. (Chapter No.4 PWD.SCH.-253(a)+ CPTR No. 3 1 to 8 Km.) | 1 | Cum | 323.5 | ₹323.5 |
| 6 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) | 1 | Cum | 150 | ₹150 |
| 7 | Earth work in Excavation in foundation in ordinary soil mixed with moorum shingle kankar requiring the use of special tools and Plants such a pick axes subbals etc. including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter Si.No.1) | 1 | Cum | 155 | ₹155 |
| 8 | Extra for Earth work in embankment mechanically compacted to 98% proctor density ln ordinary soil, excavation to be done form of regular pits not exceeding 0.5mtr in depth and work in embankment to be in 20cm layer including ramming and dressing pulverization surfacing including Supply of Labour, T&P, Roller and water sprinkle | 1 | Cum | 40 | ₹40 |
| 9 | Back filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5 m incl. cost of all labor complete as per specifications | 1 | Cum | 184.08 | ₹184.08 |
| 10 | Earth work in Excavation in ordinary soil with manually/hydrolic excavater in foundation/Trench or drains. (a) Lift up 1.50m to 3m. | 1 | Cum | 170 | ₹170 |
stage.html
html • 0.30 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.59 MB
BOQ_2132709.xls
BOQ • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .