| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.8 CrAccepted-AOC AT COLLEGE ROAD KARADAPALI GOBARA TALCHER PO SOUTH BALANDA PS COLLIERY DIST ANGULA STATE ODISHA PIN 759116 | TALCHER | ANGULA | ODISHA | 759116 | ₹31.8 Cr | L1 | Accepted-AOC Selected as L1 bidder |
| 2 | L1₹31.8 CrRejected-AOC AT PO PS PANIKOILI DIST JAJPUR ODISHA PIN 755043 | PANIKOILI | JAJPUR | ODISHA | 755043 | ₹31.8 Cr | L1 | Rejected-AOC L1 bidder |
| 3 | L1₹31.8 CrRejected-AOC AT GANDAPADA PO CHARMPA PS BHADRAK DIST BHADRAK STATE ODISHA PIN 756163 | BHADRAK | BHADRAK | ODISHA | 756163 | ₹31.8 Cr | L1 | Rejected-AOC L1 bidder |
| 4 | L1₹31.8 CrRejected-AOC D 1 1 GILLANDER HOUSE 8 N S ROAD KOLKATA 700001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | ₹31.8 Cr | L1 | Rejected-AOC L1 bidder |
| 5 | L2₹33.5 Cr+₹1.7 Cr (5.27%)Rejected-AOC HOLDING NO 554 KHAPURIA MSIL MADHUPATNA VILLAGE TOWN NUAPADA CHHAK CITY CUTTACK CUTTACK ODISHA 753010 INDIA | CUTTACK | ODISHA | 753010 | ₹33.5 Cr+₹1.7 Cr (5.27%) | L2 | Rejected-AOC L2 bidder |
Tender Value
₹37.4 Cr
EMD Value
₹37.5 L
Closing Date
4 Nov 2024, 5:30 pmClosed
Chief Engineer, Roads-I, Odisha
O/o the E.I.C (Civil-Cum-Roads), Odisha, Nirman Soudha, New Building, Unit-V, Bhubaneswar
Improvement of Humma-Boirani road from 0/000 km to 39/420 km in the district of Ganjam under State Plan
2024_EICCL_105761_4
CE-ROADS-I-08/2024-25
Open Tender
Civil Works - Roads
Percentage
270 days
Ganjam-II
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹37.5 L
Yes
24 Mar 2025
18 Oct 2024
5 Nov 2024
18 Oct 2024
4 Nov 2024
18 Oct 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Unit - Sqm
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Sqm | 8.27 | - |
| 2 | Unit - Cum
Earth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. | - | Cum | 74.72 | - |
| 3 | Unit - Cum
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge. | 1 | Cum | 75.85 | ₹75.77 |
| 4 | Unit - Sqm
Scarifying and removing the existing bituminous road surface to the required depth as per approved drawing and technical specifications and disposal of scarified materials within all lifts and lead upto 1000mtr. complete in all respect as per Section 900, Clause 305.4.3, 305.8, 305.9.5, 501.8.3.2, 501.8.7.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Sqm | 6 | - |
| 5 | Unit - Cum
Providing, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 1 | Cum | 1,320.64 | ₹1,319.32 |
| 6 | Unit - Cum
Providing and laying Granular Sub-base with Grading-VI stone screening materials as per Table 400-1 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Cum | 1,928.09 | - |
| 7 | Unit - Cum
Providing Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 406 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Cum | 2,280.44 | - |
| 8 | Unit - Sqm
Providing and applying primer coat with slow setting bitumen emulsion on prepared surface of granular base, including clearing road surface and spraying primer using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | - | Sqm | 35 | - |
| 9 | Unit - Sqm
Providing and applying tack coat with rapid setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 0.29 | Sqm | 11.54 | ₹3.35 |
| 10 | Unit - Cum
Providing and laying dense graded bituminous macadam using crushed stone of Grade-II aggregate with batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 Grade by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respects as per clause No. 505 & Section 900 of specifications for road and bridge works of Ministry of Road Transport & Highways (5th Revision) &including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. . | 1 | Cum | 8,469.02 | ₹8,460.55 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_510053.xls
BOQ • 0.90 MB
154602102.pdf
Tender Documents • 0.22 MB
154602104.html
Tender Documents • 0.05 MB
DTCN_Humma_Boirani.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .