Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance SURVEY NO 236 HISSA NO 7 SURVEY NO 237 TALUKA MUSLHI HINJEWADI PHASE 1 PUNE MAHARASHTRA 27 HINJEWADI PHASE 1 PUNE MAHARASHTRA 411057 UDYAM DL 08 0001091 27AAGCC5131K1ZN B R MII STATUS AS VERIFIED | PUNE | MAHARASHTRA | 411057 | ₹4.5 L | L1 | Admitted-Finance |
| 2 | L2₹5.7 LAdmitted-Finance SHOP NO 4 GULATI MARKET KRISHNA NAGAR NEHRU GARDEN ROAD JALANDHAR PUNJAB 144001 | JALANDHAR | PUNJAB | 144001 | ₹5.7 L | L2 | Admitted-Finance |
| 3 | L3₹5.8 LAdmitted-Finance | ₹5.8 L | L3 | Admitted-Finance |
| 4 | L4₹5.8 LAdmitted-Finance | ₹5.8 L | L4 | Admitted-Finance |
| 5 | L5₹5.9 LAdmitted-Finance | ₹5.9 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AXIS SALES L4 | SHREE BALAJI HANDLOOMS L3 | MANAT ENTERPRISES L6 | EMM PEE TRADERS L7 | SHREE BALA JI ENTERPRISES L10 | BLUE LINE ENTERPRISES L5 | Chakr Innovation Private Limited L1 | SANTOSH TRADERS L8 | FRIENDS ENGINEERS L2 | Allied International L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Job Work | |||||||||||||
| 1.01 | EFFLUENT WATER QUALITY MONITORING SYSTEM
(In-Situ Type)
Make: NIESModel No: NIESPL--WA-321
Parameters:
* COD Standard Range: 0-500 Mg/Lcod Accuracy :+5%
* BOD Standard Range: 0-500 Mg/L Accurancy:+5%
* PH Standard Range: 0-14 ph Accuracy:+5%
* TSS Standard Range:0-500 Mg/L Accuracy:+5%
* TDS Standard Range:0-2000 Mg/L Accuracy:+5%
Specifications:
* Supply:220-240 VAC, 50/60 Hz 40VA, Screen: Color, HMI., Size:7" inch Resolution:800 x 400 Pixels, LED Backligh Memory:5000 Lines of Measurements Capacitive Touch Screen, (upto 16Channels)With Date & Time, Accuracy :+10%, Enclosure: Stainless Steel With Epoxy Coating, IP68 . Micro controller-based circuit , Voltage protection, RS485 output,Real time data sampling, Automatic wiper For Turbidity, No Acid Dosing Required, Friendly interval, Easy to install, Rigid body, Durable sensors
Data Connectivity to CPCB & PPCB
* Data Logger, Sim Card & Recharge for One Year
* Real Time Data Logging on Local server
* Data Formats: CSV, EXCEL
* Data Processing as per CPCB prescribed format
Istallation & Commissioning:
1. Ensure the site is ready for installation, including necessary infrastructure and utilities.
2 .Follow the recommended installation sequence to ensure proper integration.
3 .Conduct initial testing and inspectrion to ensure installation meets specifications.Supervision only. | 1 | Each Job | 4,72,000 ₹5.8 L | 4,75,000 ₹5.8 L | 4,79,000 ₹5.9 L | 4,80,000 ₹5.9 L | 5,10,000 ₹6.4 L | 4,75,000 ₹5.9 L | 3,66,950 ₹4.5 L | 5,00,000 ₹6.1 L | 4,73,500 ₹5.7 L | 5,05,000 ₹6.3 L |
Tender Value
Refer Docs
Closing Date
28 Jan 2026, 9:00 amClosed
Lt Col ASHUTOSH KUMAR, GE (East) Jalandhar Cantt
Garrison Engineer (East) Jalandhar Cantt
Replacement of UNSV OCEMS Unit by New OCEMS device for monitoring of parameters of Sewage after treatment of Effluent through STP under GE (E) JRC
2026_MES_748202_1
3061/A/07/E3
Open Limited
Job Works
30 days
GE (E) JRC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
29 Jan 2026
13 Jan 2026
29 Jan 2026
13 Jan 2026
28 Jan 2026
13 Jan 2026
EFFLUENT WATER QUALITY MONITORING SYSTEM (In-Situ Type) Make: NIESModel No: NIESPL--WA-321 Parameters: * COD Standard Range: 0-500 Mg/Lcod Accuracy :+5% * BOD Standard Range: 0-500 Mg/L Accurancy:+5% * PH Standard Range: 0-14 ph Accuracy:+5% * TSS Standard Range:0-500 Mg/L Accuracy:+5% * TDS Standard Range:0-2000 Mg/L Accuracy:+5% Specifications: * Supply:220-240 VAC, 50/60 Hz 40VA, Screen: Color, HMI., Size:7" inch Resolution:800 x 400 Pixels, LED Backligh Memory:5000 Lines of Measurements Capacitive Touch Screen, (upto 16Channels)With Date & Time, Accuracy :+10%, Enclosure: Stainless Steel With Epoxy Coating, IP68 . Micro controller-based circuit , Voltage protection, RS485 output,Real time data sampling, Automatic wiper For Turbidity, No Acid Dosing Required, Friendly interval, Easy to install, Rigid body, Durable sensors Data Connectivity to CPCB & PPCB * Data Logger, Sim Card & Recharge for One Year * Real Time Data Logging on Local server * Data Formats: CSV, EXCEL * Data Processing as per CPCB prescribed format Istallation & Commissioning: 1. Ensure the site is ready for installation, including necessary infrastructure and utilities. 2 .Follow the recommended installation sequence to ensure proper integration. 3 .Conduct initial testing and inspectrion to ensure installation meets specifications.Supervision only.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_837890.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid