Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-AOC | L1 | Accepted-AOC work order issued | |
| 2 | Not Admitted-Fee/PreQual/Technical NO 11 91 KAMARAJ STREET THIRUVALLUVAR NAGAR AYYANAVARAM CHENNAI 600 023 | CHENNAI | CHENNAI | TAMIL NADU | 600023 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
11 Sept 2020, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Commissioner, OM
II cross, Jawahar Nagar Puducherry-5
Conversion of de-funct electrical furnace into Liquefied Petroleum Gas Fired Furnace in the Crematorium at Karuvadikuppam in Oulgaret Municipality (2nd call).
2020_DLA_6617_1
OM/e-tenders/395/2020-21
Open Tender
Miscellaneous Works
Works
20 days
Samipillaithottam
Please refer Tender documents
3 documents required · 3 mandatory
₹525
The Commissioner
₹50,000
27 Oct 2020
5 Sept 2020
11 Sept 2020
5 Sept 2020
11 Sept 2020
5 Sept 2020
90 days
Amount
A. FOR CONVERSION OF ELECTRIC FURNACE TO LPG FIRED FURNACE. Supply and installation of manual LPG burner with control of low and flame control systems. The manual high pressure tube burners with the manifold controls with non return valves and copper tubes, hoses, butterfly valves, pipe lines etc., all the items conforming the ISI standards only to be used and also follow the safety procedure for storing LPG cylinder.
LPG burner system including burners hoses, valves pipe lines arrangements etc., the burner will be the fully automatic systems and controlled with the temperature controller. The burner in build with blower and ignition transformer flame sensor, solenoid valve and sequence controller to control the LPG flow for the cremation chamber. All the items conforming the ISI standards only to be used and also follow the safety procedure storing LPG cylinder.
Supply and fixing of manifold suitable for 10 Nos. of cylinders connection.
Supply and fixing of non-return Valve for the LPG cylinders.
Supply and fixing of high pressure hoses to connect between the regulator and manifold
Supply and fixing of regulator suitable for LPG cylinders.
Supply and fixing of high pressure regulator to control the pressure of the LPG.
Supply and laying of pipe lines from the manifold to burners.
Supply and fixing of 3 Nos. High pressure leak proof stainless steel shut of valves.
Supply and fixing of high pressure leak proof flow control butterfly brass valves.
The existing damaged inner most cremation chamber will be removed and relined with the inner most refractory, and the re-construction of ash chamber in the existing cremation chamber.
Replacement of body resting cast Iron shaped bricks.
Design, fabrication and supply of manual body charging trolley to suit the existing rails made up of MS channels (100mm x 50mm x 8mm) and cover sheet of 3mm thick. The overall size of the trolley shall be not less than 5 mtr.x1mtr.x0.5mtr. which would be sliding on fixed rail of size 4”x2”x1/4” with 4 Nos. of moving wheels and hand operated cam mechanism for up and down action etc., complete.
Servicing of existing flue gas cleaning system (scrubbing system).
Supplying fixing and commissioning of Suguna/ Texmo / Sharp 2 HP mono block pump set slow speed single phase motor. The rate include the cost of pump set , pump set fixing in position and test run etc. complete.
The existing flue duct full line gets jammed the same must be removed, cleaned and re-fitted the same with new gaskets.
Electrical panel board, back, electrical cables, wiring etc., as directed by the departmental officers. The panel board will be provided with the door operation, blower and pump ON/OFF controls and burner control operations. The total number of 4 burners will have individual control switch for Ignition and the common switch for the Blower controls. The control panel will be Neatly wired with idienty marked numbers and the cables for the door will be the 1.5sqmm. 3 core wire for the suitable length from the control panel of motor, the 4 Nos. burner cable will the 1.5sqmm 3 core suitable length from the control panel to burners and the motor will control the limit with limit switches. The FD and ID Blower cable will be the 2.5sqmm 3 core cable from control panel to motor.
Servicing of various capacity of induce draft and forced draft fan motors and blowers including replacing the worn-out parts removing and re-fixing etc, complete.
Any other items required for the successful commissioning of the converted furnace.
B).Cost of operation and maintenance of the Liquefied Petroleum Gas fired furnace for the first year.
C).Cost of operation and maintenance of the Liquefied Petroleum Gas fired furnace for the second year.
D).Cost of operation and maintenance of the Liquefied Petroleum Gas fired furnace for the third year.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .