Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical 314 SECTOR 21 RAJYA SAMPATTI AWASIYA COLONY INDIRA NAGAR LUCKNOW U P | LUCKNOW | LUCKNOW | UTTAR PRADESH | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 2 | Not Admitted-Finance | Not Admitted-Finance Others-Technical Issue |
| 3 | Not Admitted-Finance | Not Admitted-Finance Others-Technical Issue |
| 4 | Not Admitted-Finance | Not Admitted-Finance Others-Technical Issue |
| 5 | Not Admitted-Finance | Not Admitted-Finance Others-Technical Issue |
Tender Value
₹8.9 Cr
EMD Value
₹17.8 L
Closing Date
24 Mar 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
CONSTRUCTION DIVISION VARANASI-01 UPAVP VARANASI
CONSTRUCTION OF SYNTHETIC HOCKEY FILED AND RENOVATION OF MULTIPURPOSE SPORTS HALL AND OTHER BUILDINGS AT GAURA BAZAR STADIUM, DISTRICT-GHAZIPUR
2026_UPHDB_1118264_1
347/M-11/106, Date 16.02.2026
Open Tender
Civil Works
Fixed-rate
GHAZIPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,850
Yes
CONSTRUCTION DIVISION VARANASI-01 UPAVP VARANASI
₹17.8 L
Yes
16 Apr 2026
23 Feb 2026
24 Mar 2026
23 Feb 2026
24 Mar 2026
23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil | 2,472.35 | CUM | 133.11 | ₹3,29,094.51 |
| 2 | Extra for every additional lift of 1.5 m or part there of in excavation /
banking excavated or stacked materials. All kinds of soil | 78.94 | CUM | 95.09 | ₹7,506.4 |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 6,186.76 | CUM | 525.32 | ₹32,50,028.76 |
| 4 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. | 6,388.2 | SQM. | 164.16 | ₹10,48,686.91 |
| 5 | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). | 958.23 | CUM. | 18.64 | ₹17,861.41 |
| 6 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin-Charge.With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 | 1,147.45 | CUM | 2,193.42 | ₹25,16,839.78 |
| 7 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts,
laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per
specifications and directions of Engineer-in-Charge. | 958.23 | CUM | 2,185.51 | ₹20,94,221.25 |
| 8 | Surface dressing on new surface with paving bitumen of grade VG - 10 of approved quality using 2.25 kg of bitumen per sqm with 1.65 cum of stone chippings 13.2 mm nominal size per 100 sqm of road surface, including
consolidation with road roller of 6 to 8 tonne capacity etc. complete | 6,388.2 | SQM | 169 | ₹10,79,605.8 |
| 9 | PREMIX CARPET-Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :16.30.1 On W.B.M. @ 0.75 Kg / sqm | 6,388.2 | SQM | 45.37 | ₹2,89,832.63 |
| 10 | Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder
and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and
alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 319.41 | CUM | 8,346.33 | ₹26,65,901.27 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.02 MB
TP.pdf
Tender Documents • 15.71 MB
BOQ_2078399.xls
BOQ • 0.43 MB
FP.pdf
Tender Documents • 4.34 MB
525.pdf
PDF • 1.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].