Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others- Not Submitted EMD & TENDER FEE |
Tender Value
₹82.7 L
EMD Value
₹82,710
Closing Date
11 Jan 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE (PT-I), IMC, Itanagar
Itanagar
Const. CC Drain from Upper Vivek Vihar Near water tank to Lower Vivek Vihar Approach Road, Ward No-04, 2. Const. Boundary Wall at upper Vivek Vihar Near DIG Official Resident, Itanagar, Ward No-04, 3. Const. CC Drain With CC Wall Near GHSS Arunadhaya
2023_IMCAP_987_1
IMC/EE(PT-I)/06/2022-23
Open Tender
Civil Works
Item Rate
183 days
Itanagar
Tender Fee, EMD and Documents as per NIT
4 documents required · 4 mandatory
₹5,000
EE(PT-I),IMC
₹82,710
11 Jan 2023
3 Jan 2023
11 Jan 2023
3 Jan 2023
11 Jan 2023
3 Jan 2023
Amount
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
d) Lintels, beams, girders, bressumers and cantilevers etc.
e) Column, pillars, posts and struts etc.
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : (b)1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement
(b)1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement.
(b)1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement of RCC work including bending, binding and placing in position complete.
b) Tar/ TMT steel
Half brick masonry (with best available local bricks) in cement mortar 1:3 (1 cement : 3 coarse sand) in foundation and plinth.
Extra for half brick masonry in superstructure above plinth level and up to floor two level.
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand).
White washing with whiting on new work (three or more coats) to give even shade.
Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work including priming coat of whiting to give an even shade.
Providing and fixing T-iron frames for doors, windows and ventilators of MS Tee sections joints mitred and welded with 15 x 3 mm legs, 10 cm long embedded in cement concrete block 15 cm x 10 cm x 10 cm size of 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded aggregate 20 mm nominal size) or with wooden plugs and screws or rawl plugs and screws or with fixing clips or bolt and nuts as required, including fixing of necessary butt hinges and screws and applying a priming coat of approved primer.
Painting two or more coats (excluding priming coat) with superior ready mixed paint for steel work of approved brand and manufacture in all shades on new work to give an even shade
Carriage of Material
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
b) For walls
Providing and laying in foundations and plinth cement concrete 1 : 2 : 4 (1cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand)
Neat cement punning.
Carriage of Material
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
d) Lintels, beams, girders, bressumers and cantilevers etc.
e) Column, pillars, posts and struts etc.
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : (b)1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement
(b)1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement.
(b)1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement of RCC work including bending, binding and placing in position complete.
b) Tar/ TMT steel
Half brick masonry (with best available local bricks) in cement mortar 1:3 (1 cement : 3 coarse sand) in foundation and plinth.
Extra for half brick masonry in superstructure above plinth level and up to floor two level.
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand).
White washing with whiting on new work (three or more coats) to give even shade.
Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work including priming coat of whiting to give an even shade.
Providing and fixing T-iron frames for doors, windows and ventilators of MS Tee sections joints mitred and welded with 15 x 3 mm legs, 10 cm long embedded in cement concrete block 15 cm x 10 cm x 10 cm size of 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded aggregate 20 mm nominal size) or with wooden plugs and screws or rawl plugs and screws or with fixing clips or bolt and nuts as required, including fixing of necessary butt hinges and screws and applying a priming coat of approved primer.
Painting two or more coats (excluding priming coat) with superior ready mixed paint for steel work of approved brand and manufacture in all shades on new work to give an even shade
Carriage of Material
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
b) For walls
Providing and laying in foundations and plinth cement concrete 1 : 2 : 4 (1cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand)
Neat cement punning.
Carriage of Material
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation ncluding provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Transportation cost for carriage of Engineering Materials.
Transportation cost for carriage of Forest products from quarry to site of work
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation ncluding provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Transportation cost for carriage of Engineering Materials.
Transportation cost for carriage of Forest products from quarry to site of work
Ground water exploration (Excavating earth by manuallyf approximately 1.5 mtr dia
Supplying and Fixing CC Ring Well with Cement Concrete 1:2:4
M/S SERA AGENCY
stage.html
html • 0.02 MB
finance_1098.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .