| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.3 LAccepted-Finance | ₹35.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹35.4 L+₹5,615.11 (0.16%)Rejected-Finance | ₹35.4 L+₹5,615.11 (0.16%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Bharathi L2 | KRISHNAKUMAR S L1 |
|---|---|---|---|---|---|
| 1.01 | PLAY AREA-Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in Gravelly soil but inclusive of shoring strutting and requiring the sides of foundation. | 12.91 | M3 | 247 ₹3,188.77 | 246 ₹3,175.86 Lowest |
| 1.02 | Supplying and Filling of sand to foundation and basement with good M.sand in layers not more than 15cm including all labour charge for etc complete | 53.85 | M3 | 1,643 ₹88,475.55 | 1,642.5 ₹88,448.63 Lowest |
| 1.03 | Supplying and filling of conveyed earth with a lead of 1Km for basement filling including all cost and conveyance of all materials and all labour charges etc., complete. | 120.5 | M3 | 410 ₹49,405 | 405 ₹48,802.5 Lowest |
| 1.04 | Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete. | 121.02 | M2 | 516.5 ₹62,506.83 | 516 ₹62,446.32 Lowest |
| 1.05 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 13.1 | M3 | 5,998 ₹78,573.8 | 5,997 ₹78,560.7 Lowest |
| 1.06 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 80.77 | M3 | 5,262 ₹4,25,011.74 | 5,261 ₹4,24,930.97 Lowest |
| 1.07 | Wearing coat Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 38.25 | M4 | 6,680 ₹2,55,510 | 6,679 ₹2,55,471.75 Lowest |
| 1.08 | Providing Multi Sports Flooring with Synthetic Acrylic (8 Layers) including cost and all charges etc complete.., | 510 | M2 | 1,725 ₹8,79,750 | 1,722 ₹8,78,220 Lowest |
| 1.09 | Supplying and erection of Portable Basket Ball Post including cost and all charges | 1 | each | 1,25,000 ₹1,25,000 Lowest | 1,25,000 ₹1,25,000 Lowest |
| 1.10 | Supplying and erection of Portable Volley Ball Post including cost and all charges | 1 | each | 25,000 ₹25,000 Lowest | 25,000 ₹25,000 Lowest |
Tender Value
₹35.6 L
EMD Value
₹35,700
Closing Date
23 Jun 2025, 3:00 pmClosed
Block development officer (B.Pt)
Block development officer (B.Pt), Mangalur.
Construction of Multipurpose Sports Ground in Ramanatham Panchayat at Mangalore Block
2025_RDTN_572045_1
A4/0959/2025
Open Tender
Civil Works
Item Wise
180 days
Mangalur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹35,700
Yes
25 Nov 2025
21 Jun 2025
23 Jun 2025
21 Jun 2025
23 Jun 2025
21 Jun 2025
Amount
PLAY AREA-Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in Gravelly soil but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling of sand to foundation and basement with good M.sand in layers not more than 15cm including all labour charge for etc complete
Supplying and filling of conveyed earth with a lead of 1Km for basement filling including all cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Wearing coat Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Multi Sports Flooring with Synthetic Acrylic (8 Layers) including cost and all charges etc complete..,
Supplying and erection of Portable Basket Ball Post including cost and all charges
Supplying and erection of Portable Volley Ball Post including cost and all charges
Supplying and erection of Portable Ball Badminton Post including cost and all charges
Construction of Dressing Room - Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in Gravelly soil but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling of sand to foundation and basement with good M.sand in layers not more than 15cm including all labour charge for etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
RCC 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete.
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Painting two coats with approved emulsion painting including cost and conveyance etc,.Complete.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, including all labour charge for etc complete
Painting New iron works of Fencing post including cost of brushes and scaffolding charges etc., complete complying with standard specification
Supply of Steel Door
Supply of Steel Window
Electrical Arrangements
Fencing - Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in Gravelly soil but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling of sand to foundation and basement with good M.sand in layers not more than 15cm including all labour charge for etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete. B.GL
Centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete. A.GL
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply of 50 mm GI pipe inculding cost and conveyance of all materails to site including all labour charges completed.
Supply of 50x25x3mm GI pipe inculding cost and conveyance of all materails to site including all labour charges completed.
Supply of chain Link-2"X2" using 10 Gauge Galvanised Iron Wire inculding cost and conveyance of all materails to site including etc.
Painting with Emulsion Paint including all charges etc., complete complying with standard specification
Fixing charges of G.I Pipe and Fencing Mesh including all labour Charges
Supplying and fixing of steel Grill Gate including cost and conveyance of all materials to site and all labour charges etc complete 1 No
Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc.,
Provision for Lamp Post
Paver Block road - Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and Laying of Interlocking Concrete Block (Surface Textured) Pavements having thickness 80mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504.
Photographic Charges
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Bharathi (BID ID -1376730)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .