Tender Value
₹61.8 L
EMD Value
₹1.2 L
Closing Date
21 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
JAGDISH SINGH DAHIYA
ENGG.CELL, MDU, ROHTAK
Providing water proofing treatment on roofs of various buildings i.e. IMSAR, LAW. Old Bio-Science, Chemistry, Pharmacy, Genetics, DDE, University Press, Squash Court, Engg. Cell, Uni. Health Centre, Law Library and Dr. B.R. Ambedkar Hall, MDU, Rohtak
2026_HRY_552239_1
2026AA72B68C B992 405E A75B AA1AC85A852B817MDU
Open Tender
Civil Works
Works
120 days
Rohtak
Providing water proofing treatment on roofs of various buildings i.e. IMSAR, LAW. Old Bio-Science, Chemistry, Pharmacy, Genetics, DDE, University Press, Squash Court, Engg. Cell, Uni. Health Centre, Law Library and Dr. B.R. Ambedkar Hall, MDU, Rohtak
2 documents required · 2 mandatory
₹5,000
₹1.2 L
Yes
5 Oct 2026
5 Oct 2026
22 Oct 2026
5 Oct 2026
21 Oct 2026
5 Oct 2026
5 Oct 2026 - 7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [28.16]Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying:
(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm
(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.
(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken up to 30 cm on parapet wall and tucked into groove in parapet all around.
(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately).
For the purpose of measurement the entire treated surface will be measured. [Through Rate] | 13,323.86 | Sqm | - | - |
| 2 | [31.7.1]Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. 1. 12 mm average thickness. [Through Rate] | 13,323.86 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
AD0181493.pdf
Additional Documents • 2.39 MB
BOQ_632085.xls
BOQ • 1.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .