Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.8 LAccepted-AOC | ₹35.8 L | L1 | Accepted-AOC LER |
| 2 | L2₹35.8 LRejected-Finance 1831 18 9 606 604 | TIRUVANNAMALAI | TAMIL NADU | 606604 | ₹35.8 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | K A Kumar L1 | IRC Constructions L2 |
|---|---|---|---|---|---|
| 1.00Part I : Upgradation of Mangalam - Kilpalanandhal road to MGR nagar road Km 0/200 - 0/780 R124 | |||||
| 1.01Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 1.02 | Km 0/200 - 0/780 | 696 | Sq.m | - | - |
| 1.03Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | |||||
| 1.04 | Km 0/200 - 0/780 | 313.2 | Cu.m | - | - |
| 1.05Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | |||||
| 1.06 | Km 0/200 - 0/780 | 174 | Cu.m | - | - |
| 1.07Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms | |||||
| 1.08 | Km 0/200 - 0/780 | 78.3 | Cu.m | - | - |
| 1.09Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
Tender Value
₹36.1 L
EMD Value
₹36,200
Closing Date
18 Dec 2018, 3:00 pmClosed
Block Development Officer (V.Pt)
Panchayat Union Office, Thurinjapuram
Upgradation/ Strengthening of Roads 4 Nos in Package No. 02 Thurinjapuram Block of Tiruvannamalai District under 14th Finance Commission Grant 2018-19
2018_RDTN_113967_1
A11/11075/2018 Dt.08.11.2018 thu2
Open Tender
Civil Works - Roads
180 days
Thurinjapuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹36,200
30 Mar 2026
3 Dec 2018
18 Dec 2018
3 Dec 2018
18 Dec 2018
3 Dec 2018
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Technical_Document_thj2.pdf
Tender Documents • 0.54 MB
BOQ_139738.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid