| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹1.3 Cr+₹4.8 L (3.92%)Rejected-Finance | ₹1.3 Cr+₹4.8 L (3.92%) | L2 | Rejected-Finance L2 Tender |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
3 Jul 2024, 3:00 pmClosed
The Additional Collector(D.) DRDA Chengalpattu
O/o The Additional Collector(D.) DRDA Chengalpattu
Periodic Renewal and Maintenance of MRL 16 BT Road from APK Road to CP Road via Ammanambakkam KM 0 0 to 6 700 in Chithamur Block Having PKG No.TN 34 13R
2024_RDTN_135130_1
Rc. No1791/2024/A14 Dated 18.06.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Chithamur Block
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.5 L
O/o The Additional Collector(D.) DRDA Chengalpattu
19 Sept 2024
27 Jun 2024
3 Jul 2024
27 Jun 2024
3 Jul 2024
27 Jun 2024
29 Jun 2024
Amount
Clearing Scrub Jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Collection and supply of US Gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete,
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying TACK COAT over the Bt surface using 3.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 13.20-11.20mm. 0.17cum of 6.7-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supplying and painting the walls with two coats of cement paint over one coat of cement primer as instructed by the departmental officers including preparation of surface
a. 60 cm Equilateral triangle cautionary signboard
Provision of Rumble Strips with Premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supplying and fixing of HM stone of size 0.75x 0.23x 0.10m
Provision for Speed Breaker
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km
For 1st year
For 2nd year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KCP CONSTRUCTIONS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .