Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹51,886.76Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹53,517.49+₹1,630.73 (3.14%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹57,075.44+₹5,188.68 (10.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹62,449.42+₹10,562.66 (20.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹74,100
EMD Value
₹1,482
Closing Date
5 Aug 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
RDDDC2627110230 CO Culvert NHO Ab salam Shah and others at Peertakya hdpora
2026_RDPR_317645_30
e- NIT No. 64/2026-27 Dated 24-07-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹1,482
7 Aug 2026
24 Jul 2026
6 Aug 2026
24 Jul 2026
5 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | site clearence by engaging labours removal of mulabai/c dismanteling of damaged walls | 1 | no | - | - |
| 0.0 | earth work in excavation manual means over areas (exceeding 30 cm in depth 1.5 mtr in width as well as 10 sqm in plan i/c disposal of excavated soil upto 50 mtr | 6 | Cum | - | - |
| 0.0 | P/L of stone soling of tightly hand packed including carriage lead of 5Km by Mt | 1.5 | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.4 | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: ( 1:3:6 ) mix | 5 | Cum | - | - |
| 0.0 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level, upto floor five level including curing but excluding cost of centering, shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.31 | Cum | - | - |
| 0.0 | centering / shuttering i/c strutting propping i/c all carriages | 16 | SQM | - | - |
| 0.0 | centering / shuttering i/c strutting propping i/c all carriages | 8.52 | SQM | - | - |
| 0.0 | Reinforcement for Rcc i/c straightening, cutting bending placing in position tmt bars i/c all carriages | 111.7 | kgs | - | - |
| 0.0 | Sand /Bajri Lead 15 km lead | 7.1 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1042006.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .