Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC PUVALAY DHURA TINGLING T E P O SOURENI BAZAR DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | 734101 | ₹5.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 LRejected-AOC | ₹5.1 L | L2 | Rejected-AOC L2 |
| 3 | L3₹5.1 LRejected-AOC | ₹5.1 L | L3 | Rejected-AOC L3 |
Tender Value
₹5.0 L
EMD Value
₹9,997
Closing Date
20 Jan 2026, 5:55 pmClosed
Block Development Officer
Block Development Officer Kalimpong I Dev. Block
Construction of Protection wall at Dulal Play Ground at Yok Busty, Sansad-II under Seokbir G.P within Kalimpong-I Dev. Block area.
2026_DMK_983943_2
BDO/KPG-I/DEV./eNIT-45/2025-26
Open Tender
CIVIL WORKS
60 days
kalimpong
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,997
Yes
10 Mar 2026
6 Jan 2026
23 Jan 2026
6 Jan 2026
20 Jan 2026
6 Jan 2026
Compacting original ground supporting embankment Loosening, Leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Clause 305.3.4 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).. . .
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . .
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming..
Cost of stone boulder 150 mm size delivered ans stacked at site.
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
Added 18% GST
Added Labour Welfare Cess 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_2400757.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid