Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC | ₹14.7 L | L1 | Accepted-AOC AOC |
| 2 | L2₹15.0 L+₹30,981.93 (2.10%)Rejected-AOC | ₹15.0 L+₹30,981.93 (2.10%) | L2 | Rejected-AOC L2 |
| 3 | L3₹15.2 L+₹45,735.23 (3.10%)Rejected-AOC | ₹15.2 L+₹45,735.23 (3.10%) | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
Closing Date
9 Jul 2026, 5:00 pmClosed
Gramsevak Adhikari
Wakhari
ETENDAR/NSY/12/2026-27
2026_SOLAP_1314243_1
ETENDAR/NSY/12/2026-27
Open Tender
Civil Works
Percentage
120 days
Wakhari
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Exempted
12 Jul 2026
3 Jul 2026
11 Jul 2026
3 Jul 2026
9 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Picking the road surface including sectioning etc. complete (WBM surface.) | 1 | CuM | 31 | ₹30.97 |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means -Grading I (Using Screening Type B (11.2 mm) Aggregate) | - | CuM | 2,680.65 | - |
| 3 | Providing and laying in situ cement concrete M -20 with tremix treatment for 200 mm thickness for Concrete Road is including laying plastic sheet for 125 micron thickness with groove cutting of 4 mm wide and 20 mm deep with necessary refilling with bitumen ( excluding reinforcement) with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) etc. complete | - | CuM | 8,665.45 | - |
| 4 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | 23.38 | CuM | 655 | ₹15,313.9 |
| 5 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 23.38 | CuM | 79 | ₹1,847.02 |
| 6 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. | 77.93 | CuM | 21 | ₹1,636.53 |
| 7 | Providing and fixing Road junction / Information sign board | 1 | CuM | 7,814 | ₹7,814 |
| 8 | Test of Agregate Water Absorpation Compressive Strength ,Sp Gravity ,Imp[act Value,Crushing Value. | 2 | CuM | 2,730 | ₹5,460 |
| 9 | Test of sieve anylysis of hard murum | 1 | CuM | 725 | ₹725 |
| 10 | Test of M.20 C C Cube Compressive Strength | 1 | CuM | 725 | ₹725 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_2253651.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .