Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SINGLE₹2.4 LAccepted-AOC JAYANT NEAR JAI HIND SCHOOL LAXMI MARKET SINGRAULI 486890 MADHYA PRADESH INDIA | SINGRAULI | MADHYA PRADESH | 486890 | ₹2.4 L | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE QUALIFIED BIDDER |
| Sl No | Description | Qty | Unit | SARWESHWARI ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc per ER Shovels : 1. Cleaning of all HV & LV Ring collector assemblies (HT Shoes, Insulator, Rings etc.), Swivel assembly along with their surroundings. 2. Machine is to be cleaned Twice in a month per year. Note: The maximum deployment of manpower for the above job will be as 1. Semi-skilled for 48 nos. manshifts and 2. Un-Skilled for 48 nos. manshifts. | ||||
| 2.00 | Labour charges for Cleaning of all HV & LV Ring collector assemblies (HT Shoes, Insulator, Rings etc.), Swivel assembly along with their surroundings per machine for 365 days including contractor's profit. | 3 | Nos. | 67,000 ₹2,01,000 Lowest |
| 3.00 | Charges forTools & Tackles for (12 months) 365 days. | 3 | Nos. | 1,500 ₹4,500 Lowest |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | No. | - |
Tender Value
₹2.4 L
EMD Value
₹3,100
Closing Date
1 Dec 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U P -231222
Cleaning of HV and LV Ring collectors, swivel assembly, HT Cables of 03 nos. ER Shovels (1 no. P and H 1900AL and 02 nos BE 195B Shovel) for 365days
2025_NCL_347593_1
KHD/G.M. (Excv)/E-Tender/25-26/825
Open Tender
Excavation Department Work
Item Rate
365 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,100
2 May 2026
17 Nov 2025
2 Dec 2025
17 Nov 2025
1 Dec 2025
18 Nov 2025
17 Nov 2025 - 25 Nov 2025
Amount
Scope of Work/Technical Specifications etc per ER Shovels : 1. Cleaning of all HV & LV Ring collector assemblies (HT Shoes, Insulator, Rings etc.), Swivel assembly along with their surroundings. 2. Machine is to be cleaned Twice in a month per year. Note: The maximum deployment of manpower for the above job will be as 1. Semi-skilled for 48 nos. manshifts and 2. Un-Skilled for 48 nos. manshifts.
Labour charges for Cleaning of all HV & LV Ring collector assemblies (HT Shoes, Insulator, Rings etc.), Swivel assembly along with their surroundings per machine for 365 days including contractor's profit.
Charges forTools & Tackles for (12 months) 365 days.
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_360300.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_360300.xls
BOQ • 0.33 MB
COC_ATC.pdf
Tender Documents • 0.75 MB
Annexures.pdf
Tender Documents • 0.89 MB
ITB.pdf
Tender Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .