Loading…
Loading…
Tender Value
₹3.6 Cr
EMD Value
₹1.9 L
Closing Date
28 Jul 2026, 3:00 pm
Office of the Superintending Engineer PWD Building
Office of the Superintending Engineer PWD Buildings Construction and Maintenance Circle 2, Chepauk Chennai 5
Special repair works to A and B Block in 240 MLA Quarters at Omandurar Government Estate, Chennai-2
2026_PWD_684645_1
TNPWD/01-1BCM/2026-27
Open Tender
Civil Works
Government Estate
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.9 L
9 Jul 2026
9 Jul 2026
28 Jul 2026
9 Jul 2026
28 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the damaged floor finish and dadooing walls in cement mortar with mosaic tiles / Glazed tiles/cuddapah slab and clearing away with carefully stacking the material useful for reuse for any thickness etc., complete complying with standard specification and as directed by the Departmental officers. | 381.73 | m2 | - | - |
| 2Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of speicals such on large plate, shoe, carcher, coupling, bolt and nut transportation charges and handling charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base as per the standard specification and as directed by the departmental officers. | |||||
| 2.01 | Initial Height of 3.00m | 180 | RM | - | - |
| 2.02 | Additional Height of 2.50m | 2,020 | RM | - | - |
| 3 | Manufacturing, supplying and fixing in positon of RCC Jally of 5cm thick in cement concrete 1:2:4 using 20mm machine crushed stone jelly (excluding cost of reinforcement steel) including cost of mould, finishing, curing, lifting, fixing in position etc., complete complying with standard specification and as directed by the departmental officers. | 64 | m2 | - | - |
| 4 | Providing and Applying high strength, hybrid polyurethane Waterproofing coating which is two component, cold applied, water based acrylic and UV resistant water proofing treatment to the Existing Roof screed surface applied @ 1.6 L/m2 in 3 coats to achieve 1mm DFT, having tensile strength with 45 gsm glass fibre mesh 10N/mm2 , Elongation ≥ 200%, confirming to ASTM D2370; Abrasion resistance 15mg confirming to ASTM D 4060 and Crack bridging ability up to 3 mm, including surface preparation, ensure surface in SSD condition for first coat and spreading 45 gsm glass fibre mesh of 2.5 mm x 2.5 mm sandwiched between the first and second coat completely as per specification. The finished cost to include surface preparation, making coving at Junction, treatment of cracks completely as per specification. | 1,520 | m2 | - | - |
| 5 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 50 | m2 | - | - |
| 6 | Providing, mixing, laying polymer based water proofing treatment for the Sunken toilet by applying cement based, flexible, water proofing compound confirming to IS:2645, to a thickness of 1mm of the prepared surface of the roof slab/floor slab as per specifications mentioned above providing cement mortar 1:3, water proofing cover plaster to a thickness of 12mm over the membrane coating with admixture of approved make. Rate quoted is inclusive of preparation of surface, which includes cleaning of surface polymer mortar curing, labour, tools and equipment, etc. Rate inclusive of cement and sand required for the treatment, the cost and labour charges for fixing 25mm dia pressure pipes 15kg/cm2 to a length of 45cm for drip pipes, etc. complete. | 795.6 | m2 | - | - |
| 7 | Flooring with ceramic tiles of following size and variety conforming to IS 15622 laid over cement mortar bed of 20 mm thick in cement mortar 1:3 (One Cement and Three crushed stone Sand) with required Cement Slurry and Mortar Plasticizer including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with Water Resistant Tile Epoxy Grout at the rate of 0.27 Kg. / sq.m. etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) | 395.35 | m2 | - | - |
| 8 | Pointing with Water Resistant Tile Epoxy Grout at the rate of 0.27 Kg. / sq.m. etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the Materials should be got approved by Executive Engineer before use on works) | 224.65 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
conditios.pdf
Tender Documents • 0.46 MB
BOQ_823012.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid