Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.5 LAccepted-AOC BAID COMPLEX R K CHOUDHURY ROAD KUMAR PARA GUWAHATI 781001 ASSAM | GUWAHATI | KAMRUP METRO | ASSAM | 781001 | ₹44.5 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹49.7 L+₹5.2 L (11.6%)Rejected-AOC | ₹49.7 L+₹5.2 L (11.6%) | L2 | Rejected-AOC Not Being L1 |
| Sl No | Description | Qty | Unit | KUNDAN ENGINEERS AND BUILDERS L2 | R K ENGINEERING ASSEMBLE L1 |
|---|---|---|---|---|---|
| 0.00NOTE:- (i) Schedule 'A' Part I to VII are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. (ii) Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. | |||||
| 1.00 | Total amount of Sch 'A' Part I (BUILDING & STRUCTURAL WORK OF AC PLANT ROOM & OPERATOR REST ROOM)
Note : Details of prepriced schedule are given in tender documents. | 1 | Lump sum | 8,78,000 ₹8,78,000 | 8,00,000 ₹8,00,000 Lowest |
| 2.00 | Total amount of Sch 'A' Part-II (SITE CLEARANCE AND EARTH WORK).
Note: Details of prepriced schedule are given in tender documents. | 1 | Lump sum | 61,200 ₹61,200 | 53,000 ₹53,000 Lowest |
| 3.00 | Total amount of Sch 'A' Part-III (INTERNAL ELECTRIFICATION ).
Note: Details of prepriced schedule are given in tender documents. | 1 | Lump sum | 94,500 ₹94,500 | 82,000 ₹82,000 Lowest |
| 4.00 | Total amount of Sch 'A' Part-IV (INTERNAL WATER SUPPLY ).
Note: Details of prepriced schedule are given in tender documents. | 1 | Lump sum | 28,000 ₹28,000 | 25,000 ₹25,000 Lowest |
| 5.00 | Total amount of Sch 'A' Part-V (EXTERNAL ELECTRIC SUPPLY).
Note: Details of prepriced schedule are given in tender documents. | 1 | Lump sum | 5,78,000 ₹5,78,000 | 5,00,000 ₹5,00,000 Lowest |
| 6.00 | Total amount of Sch 'A' Part-VI (PACKAGE AC PLANT).
Note: Details of prepriced schedule are given in tender documents. | 1 | Lump sum | 16,23,000 ₹16,23,000 | 15,00,000 ₹15,00,000 Lowest |
| 7.00 | Total amount of Sch 'A' Part-VII (LIGHTING PROTECTION)
Note: Details of prepriced schedule are given in tender documents. | 1 | Lump sum | 53,000 ₹53,000 | 50,000 ₹50,000 Lowest |
| 8.00Sch 'A' Part-VIII (MISCELLANEOUS ITEMS) Note:- This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under Col 5 signifies this fact only. | |||||
| 8.01 | M&L brick sub class B locally available best quality laid in trenches above sand cushioning for cable protection complete all as specified and directed. | 2,400 | Each | 11 ₹26,400 | 9 ₹21,600 Lowest |
Tender Value
₹46.9 L
EMD Value
₹94,000
Closing Date
12 Dec 2025, 6:00 pmClosed
CWE AF Borjhar
HQ CWE AF Borjhar Military Engineer Services PO Airport Borjhar Guwahati Assam 781015
PROVN OF AC PLANT FOR EAX ROOM AT AF STN TEZPUR
2025_MES_732821_2
CWE(AF)/TEZ/TOKEN-21/ 2025-26
Open Tender
Civil Works
Lump-sum
180 days
Borjhar
As per tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) Tezpur
₹94,000
Yes
6 Feb 2026
28 Nov 2025
15 Dec 2025
28 Nov 2025
12 Dec 2025
5 Dec 2025
Amount
NOTE:- (i) Schedule 'A' Part I to VII are Prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. (ii) Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates.
Total amount of Sch 'A' Part I (BUILDING & STRUCTURAL WORK OF AC PLANT ROOM & OPERATOR REST ROOM) Note : Details of prepriced schedule are given in tender documents.
Total amount of Sch 'A' Part-II (SITE CLEARANCE AND EARTH WORK). Note: Details of prepriced schedule are given in tender documents.
Total amount of Sch 'A' Part-III (INTERNAL ELECTRIFICATION ). Note: Details of prepriced schedule are given in tender documents.
Total amount of Sch 'A' Part-IV (INTERNAL WATER SUPPLY ). Note: Details of prepriced schedule are given in tender documents.
Total amount of Sch 'A' Part-V (EXTERNAL ELECTRIC SUPPLY). Note: Details of prepriced schedule are given in tender documents.
Total amount of Sch 'A' Part-VI (PACKAGE AC PLANT). Note: Details of prepriced schedule are given in tender documents.
Total amount of Sch 'A' Part-VII (LIGHTING PROTECTION) Note: Details of prepriced schedule are given in tender documents.
Sch 'A' Part-VIII (MISCELLANEOUS ITEMS) Note:- This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under Col 5 signifies this fact only.
M&L brick sub class B locally available best quality laid in trenches above sand cushioning for cable protection complete all as specified and directed.
Boring mechanicall or manually in any type of soil of bore size 100mm to 25mm complete all as specified.
M&L for cutting the road/hard standing and making good disturbed surface by using PCC type C2 (1:3:6) by using 20 graded stone aggregate for the fixing the pipe complete all as specified.
Supply and fix switch fuse unit TPN 500 Volts, 3 phase with HRC fuses suitable for interior mounting in panel of capacity 63 Amp .
Horizontal boring for passing GI protection pipe upto 100mm bore (dia), under road / foot path, not exc, 10.00 metre in a single length, complete all as specified.
Supply,installation,testing and commissioning of cooling tower 10 TR, induced draft counter flow type, material FRP casing, virgin PVC fill, PVC eliminators, MS HDG supporting structures, FRP cold water basin, header pipe with PVC branch pipes, fan blade and hub of cast aluminium alloy material, length 1200mm, width 1200 mm, height 2400mm, fill depth 600mm, Static Weight of CT 570 kgs, design range 4.2o C, design approach 3.9o C, fill flute size 12mm, air inletall around, fan diameter 900 mm, fan air flow 7560 mm, fan rpm 960 rpm, having water flow rate 120 USGPM, designed for Hot water temperature 36.4o C and Cold water temperature 32.2o C, Design wet bulb temperature 28.3o C, 2 hp motor TEFC direct driven, 415V, 50 Hz, 3ph, 960 rpm suitable for AC plant as per OEM's specifications complete all as specified and directed.
Supply installation & commissioning of 3 Phase centrigugal monoblock pump set,5 HP,300-440V,cast iron motor body,insulation Class B,protection class IP44, suitable suction and delivery size 50 mm,Discharge Flow Rate 8.5-5.8 LPS (Litres Per Second) Head Range 20-36 Metres,speed 3000 RPM, capacity 10 CPM including necessary frame work and foundation complete all as specified.
Supply, installation of Nitrile Rubber thermal & accoustic insulation (not less than 75 sqmtrs) complete all as specified
Supply, installation, testing and balancing of Supply air Grill with AI. Damper of Aluminium constructed with powder coated finish complete all as specified and directed.
Supply and installation of GI perforated cable tray and GI trip with fixing arrangement complete all as specified and directed.
Supply and connection of weather proof copper armoured control cable termination of 1.1 KV grade, PVC insulated of size 6 Sqmm x 4 core alongwith gland and termination kit complete all as specified and directed.
Supply and installation of Heater arrangement with control panel and sensors for the humidity control system as per OEM Specification all as specified and directed.
Supply and installation of Fusible link type Automatic Flame Proof Fire Damper for each wall opening as per OEM Specification all as specified and directed.
Add Note (a) Contractor should visit the site before Quoting the rates to understand site conditions. (b) Contractor should reverify the design calculation from OEM and submit the design & drawing within 30 days of acceptance of Tender for approval of accepting officer before execution of the work. (c) Contractor/ bidder will be responsible for performance guarantee of complete AC plant to achieve the inside design conditions round the clock throughout the year with overall COP of the system not less than 3 from the date of completion. (d) Supply, installation, testing and commissioning of Water cooled Air conditioner shall be undertaken through Manufacturers/ Specialist Firms. (e) Quoted rates inclusive of all other connected items required (not catered in tender) for smooth functioning of the said AC Plant. (f) Testing of the AC Plant to be done for all three seasons (Summer, Winter & Monsoon) and submitted to accepting Officer for approval. (g) Rates quoted by the Contractor shall be complete finished work including cost of all labour, material, scaffolding, finishing as required with tools, plants, cartage, lift, taxes, tollage, octroi, royalties etc. All works shall be executed as per drawings and instructions of Site-in-charge and shall be include the supply and installation at site of all the equipment, ancillary materials as specified and all such items what-so-ever which may be required to fulfil the intent and purpose as laid down in the drawings. All materials shall be duly approved by Site-in-Charge before incorporating in the actual work. (h) Rates quoted by the Contractor shall deemed to be including for Manning and Operation of AC Plant during the period of 03 months of the date of completion and Ref mechanic for one shift. (j) Quoted rates including of all arrangement required for the above. (j) The AC plant is to maintain temperature of 300C+ 20 C and the retative humidity is not to exceed 70% inside the EAX room.
KUNDAN ENGINEERS AND BUILDERS (BID ID -3496163)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
9087tender.pdf
Tender Documents • 1.43 MB
4-7.pdf
Additional Documents • 0.89 MB
7-7.pdf
Additional Documents • 0.85 MB
BOQ_830913.xls
BOQ • 0.28 MB
5-7.pdf
Additional Documents • 0.75 MB
6-7.pdf
Additional Documents • 0.80 MB
LD.pdf
Additional Documents • 0.73 MB
2-7.pdf
Tender Documents • 0.88 MB
3-7.pdf
Additional Documents • 0.62 MB
1-7.pdf
Additional Documents • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .