| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC | ₹3.3 Cr Quoted ₹3.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 Cr+₹5.6 L (1.63%)Rejected-AOC | ₹3.5 Cr+₹5.6 L (1.63%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not responsive |
Tender Value
₹3.3 Cr
EMD Value
₹1.7 L
Closing Date
20 Dec 2023, 3:30 pmClosed
Superintending engineer
SIPCOT Head office egmore Chennai
Functional Improvement and Facelift to Nallah Odai in SIPCOT Industrial Park, Perundurai B) Removal of old sewer line, HDPE Pipeline and Providing concrete to unused manhole chambers in Phase I roads at SIPCOT Industrial Park, Perundurai
2023_SIPCT_392808_2
NIT.No.42/CD/T.No.42/2023-24
Open Tender
Civil Works
Lump-sum
180 days
SIPCOT Industrial Park Perundurai
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹1.7 L
1 Mar 2024
13 Dec 2023
21 Dec 2023
13 Dec 2023
20 Dec 2023
13 Dec 2023
Amount
Nallah Canal
Clearing Scrub Jungle and removal of the Rubbish (Clearing grass and removal of rubbish upto a distance of 50m outside the periphery of the area etc., complete complying with standard specification and as directed by SIPCOT officers
Excavation in all kinds of soil including required depth for constructing brick wall to act as retaining wall on both sides of the canal bottom etc., The rate including cost of all materials, machinery, labour, dressing bed and slope sides to required level and profile with an initial lead of 10mts and initial lift of 2mts and clearing and levelling the site etc., complete complying with standard specification and as directed by SIPCOT officers
Refilling with excavated/ available earth other than sand upto 1km and depositing the earth as shown by SIPCOTofficers in layers of approved thickness well rammed, watered and consoildated etc. complete complying with standard specification and as directed by SIPCOT officers
Supplying and filling in foundation and basement with Gravel in layers of thickness well rammed watered and consolidated etc., complete complying with standard specification and as directed by SIPCOT officers
Supplying and filling in foundation and basement with Stone Dust etc.,complete complying with standard specification and as directed by SIPCOT officers
Supplying and Laying of Plain Cement Concrete 1:2:4 (one cement, two sand and four aggregate) using 40mm size HBG stone jelly including dewatering if found necessary and laid in layers of thickness well rammed, consolidated and curing etc., complete complying with standard specification and as directed by SIPCOT officers
Supplying and Laying of Plain Cement Concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm size HBG stone jelly including dewatering if found necessary and laid in layers of thickness well rammed, consolidated and curing, weep holes shall be provided etc., complete complying with standard specification and as directed by SIPCOT officers
Brick work in Cement Mortar 1:5 (one cement and five sand), using fly ash bricks of size 9"x4 1/2"x 3" including curing etc., complete complying with standard specification and as directed by SIPCOT officers
Plastering with Cement Mortar 1:3 (one cement and three sand), 12mm thick in all floors including curing etc., complete complying with standard specification and as directed by SIPCOT officers
Supply, delivery and fixing of Bitumen Felt 15mm thick pad at every 30 metre intervals etc., complete complying with standard specification and as directed by SIPCOT officers
Dewatering using 20 HP diesel engine pumpset including hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete complying with standard specification and as directed by SIPCOT officers
Check Dam
Excavation in all kinds of soil including required depth for canal, filter drains / catch water drains etc., and placing the excavated earth neatly in dump area or for formation of embankments as directed. The rate including cost of all matereials, machinery, labour, dressing bed and slope sides to requried level and profile with an initial lead of 10mts and intial lift of 2mts and clearing and levelling the site etc., complete complying with standard specification and as directed by SIPCOT officers
Refilling with excavated/ available earth other than sand upto 1km and depositing the earth as shown by SIPCOT Officers in layers of approved thickness well rammed, watered and consolidated, etc., complete complying with standard specification and as directed by SIPCOT officers.
Supplying anf filling in foundation and basement with Quarry Dust etc., complete complying with standard specification and as directed by SIPCOT officers.
Providing & Filling of Pebbles varies size in natural colour along the canal. The rate is inclusive of loading, unloading, carriage etc., etc., complete complying with standard specification and as directed by SIPCOT officers.
Supplying and filling in foundation and basement with Gravel in layers of thickness well rammed watered and consolidated etc., complete complying with standard specification and as directed by SIPCOT officers.
Supplying and Laying of Plain Cement Concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm size HBG stone jelly including dewatering if found necessary and laid in layers thickness , well rammed, consolidated and curing etc., complete complying with standard specification and as directed by SIPCOT officers
Construction of RR Masonry in CM 1:4 (one cement and four sand), using new stones including cost and conveyance of all required materials at site and labour charges for finishing work etc., complete complying with standard specification and as directed by SIPCOT officers
Plastering with Cement Mortar 1:3 (one cement and three sand), 20mm thick in all floors including curing etc., complete complying with standard specification and as directed by SIPCOT officers
Supply and Fixing of Precast RCC rings 100mm thick using hand boreset to a hole of 1.50m dia upto 3.00 m depth and except pebble filling upto depth including refilling, material, labour charges, transportation etc., all shall be complete complying with standard specification and as directed by SIPCOT officers
Old Sewer Pipe Line work
Earth work excavation and depositing on bank with on initial lead and initial lift in hard stiff clay, stiff black cotton soil, hard red earth, SS 20B for foundation - for Removing the Old Sewer and HDPE Pipes, etc., complete complying with standard specification and as directed by SIPCOT officers
Refilling with excavated/ available earth other than sand upto 1km and depositing the earth as shown by SIPCOT Officers in layers of approved thickness well rammed, watered and consolidated, etc., complete complying with standard specification and as directed by SIPCOT officers
Dewatering using 3HP diesel engine pumpset including hire charges, cost of Diesel, Engine oil, pump operator, labour charge, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete complying with standard specification and as directed by SIPCOT officers
Supplying and laying of Plain Cement Concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm size HBG stone jelly including dewatering if found necessary and laid in layer thickness , well rammed, consolidated and curing etc., complete complying with standard specification and as directed by SIPCOT officers. Inside the manhole chambers of unused Sewage pipeline and ETP pipeline alround the Phase - I roads.
Dismantling, clearing away Brick / Stone Masonry in Cement Mortar walls under 3m high etc., complete complying with standard specification and as directed by SIPCOT officers. Dismantling of unused manhole chambers in Phase-I roads.
Sub Total of Total Amount in Column BA (ie. Qty x Unit Rate)
Added GST of 18%
D.Shanmugavel
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .