Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 LAccepted-AOC MANNI MOUNTA COMPLEX NEAR SGPGI RAEBARELI ROAD LUCKNOW 226014 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226014 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹44.1 L+₹5.8 L (15.1%)Rejected-Finance | L2 | Rejected-Finance other than lowest |
| Sl No | Description | Qty | Unit | COOLING CENTRE L1 | JASPREET SINGH COOLING CORP. L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling existing air washer system removing the existing header nozzle, air filter and all connected items and cleaning of all pipings and brass spring nozzle assembly and air filter complete and replacing unserviceable parts of air washer , scraping and removing of old paint and applying two coat of synthetic enamel paints over one coat of red oxide primer to all parts of air washer system , cleaning of UG sump , removing sludge/sand/dirt by means of mannual/sludge removing pump, cleaning the sump with bleached water and washing with sodium Hypochloride liquid,drying and applying one coat of lime wash internally including testing complete all as specified and as directed. | 6 | Each Job | 10,000 ₹60,000 | 1,500 ₹9,000 Lowest |
| 2.00 | Taking out with Supply and fix Brass Nozzle of existing size complete all as specified and as directed. | 252 | Each Job | 150 ₹37,800 Lowest | 250 ₹63,000 |
| 3.00 | S&F in replacement of 3 Pole power contactor type MNX 70 suitable for 3 phase motor complete all as specified and directed.Make L&T/SIEMENS/GE | 4 | Each | 4,200 ₹16,800 | 2,000 ₹8,000 Lowest |
| 4.00 | S&F in replacement of 3 Pole power contactor type MNX 25 suitable for 3 phase motor complete all as specified and directed.Make L&T/SIEMENS/GE | 5 | Each | 2,200 ₹11,000 | 2,000 ₹10,000 Lowest |
| 5.00 | S&F in replacement of over load relay range 36-60 complete all as specified and directed. | 5 | Each | 1,100 ₹5,500 Lowest | 2,000 ₹10,000 |
| 6.00 | S&F in replacement of over load relay range 9-15 complete all as specified and directed. | 5 | Each | 1,000 ₹5,000 Lowest | 2,000 ₹10,000 |
| 7.00 | Disconnecting electic motor, transporting to workshop and M&L for opening of motor, cutting/removing old burnt winding coils, cleaning filling the stator slots . Rewinding of electric Induction motor upto 15 HP including damaged stator of any make & type of pump or blower motor with suitable gauge of super enamelled copper conductor including winding with fibre cloth/PVC insulated winding paper, superior quality varnishing, servicing of ball bearings and applying two coats of synthetic enamel spray paint to exterior surface of electric motor , suitable main connections from coil to terminal box, , necessary mechanical works for shaft/bearing housing, preparing and inserting coils running/starting winding, interconnecting, fixing, soldering, jointing, heating, drying up coils, connection at site, to and fro transportation, testing at site, replacing new connection terminal plate of appropriate sizes satisfactorily running all specified and as directed. | 4 | Each Job | 12,000 ₹48,000 Lowest | 14,000 ₹56,000 |
| 8.00 | All as per Srl ItemNo.7 above but 40 HP Electric Motor Induction complete all as specified and as directed. | 2 | Each Job | 18,000 ₹36,000 Lowest | 40,000 ₹80,000 |
| 9.00 | Supply & fix in repair of Timer 5-30 seconds Make:- GIC/L&T | 5 | Each Job | 1,100 ₹5,500 | 500 ₹2,500 Lowest |
| 10.00 | Supply & fix in repair single phase preventer VSP 2 Make:- Minilec/L&T | 5 | Each Job | 1,100 ₹5,500 | 500 ₹2,500 Lowest |
Tender Value
₹60 L
EMD Value
₹1.1 L
Closing Date
26 Feb 2026, 6:00 pmClosed
Col Manav Pant, CWE
HQ CWE (AF) Chakeri, Kanpur - 208008
REPAIR MAINT OF EVAPORATIVE PLANT AT PAINT SHOP EP SHOP AND SARANG AUDITORIUM CENTRAL AC PLANT AND VRF TYPE AND WATER COOLED AIR CONDITIONER PLANTS AT AFS CHAKERI KANPUR AND REPAIR MAINT OF EARTHING LT PANEL AND CONNECTED ELECTRIC WORK OF AC PLANT A
2026_MES_750151_1
CWE(AF)/CHK/EM/T-22 OF 2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE (AF) E/M Chakeri
Please refer tender documents
8 documents required · 8 mandatory
₹1,000
GE (AF) E/M Chakeri
₹1.1 L
12 Jun 2026
27 Jan 2026
6 Mar 2026
27 Jan 2026
26 Feb 2026
18 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling existing air washer system removing the existing header nozzle, air filter and all connected items and cleaning of all pipings and brass spring nozzle assembly and air filter complete and replacing unserviceable parts of air washer , scraping and removing of old paint and applying two coat of synthetic enamel paints over one coat of red oxide primer to all parts of air washer system , cleaning of UG sump , removing sludge/sand/dirt by means of mannual/sludge removing pump, cleaning the sump with bleached water and washing with sodium Hypochloride liquid,drying and applying one coat of lime wash internally including testing complete all as specified and as directed. | 6 | Each Job | - | - |
| 2 | Taking out with Supply and fix Brass Nozzle of existing size complete all as specified and as directed. | 252 | Each Job | - | - |
| 3 | S&F in replacement of 3 Pole power contactor type MNX 70 suitable for 3 phase motor complete all as specified and directed.Make L&T/SIEMENS/GE | 4 | Each | - | - |
| 4 | S&F in replacement of 3 Pole power contactor type MNX 25 suitable for 3 phase motor complete all as specified and directed.Make L&T/SIEMENS/GE | 5 | Each | - | - |
| 5 | S&F in replacement of over load relay range 36-60 complete all as specified and directed. | 5 | Each | - | - |
| 6 | S&F in replacement of over load relay range 9-15 complete all as specified and directed. | 5 | Each | - | - |
| 7 | Disconnecting electic motor, transporting to workshop and M&L for opening of motor, cutting/removing old burnt winding coils, cleaning filling the stator slots . Rewinding of electric Induction motor upto 15 HP including damaged stator of any make & type of pump or blower motor with suitable gauge of super enamelled copper conductor including winding with fibre cloth/PVC insulated winding paper, superior quality varnishing, servicing of ball bearings and applying two coats of synthetic enamel spray paint to exterior surface of electric motor , suitable main connections from coil to terminal box, , necessary mechanical works for shaft/bearing housing, preparing and inserting coils running/starting winding, interconnecting, fixing, soldering, jointing, heating, drying up coils, connection at site, to and fro transportation, testing at site, replacing new connection terminal plate of appropriate sizes satisfactorily running all specified and as directed. | 4 | Each Job | - | - |
| 8 | All as per Srl ItemNo.7 above but 40 HP Electric Motor Induction complete all as specified and as directed. | 2 | Each Job | - | - |
| 9 | Supply & fix in repair of Timer 5-30 seconds Make:- GIC/L&T | 5 | Each Job | - | - |
| 10 | Supply & fix in repair single phase preventer VSP 2 Make:- Minilec/L&T | 5 | Each Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_840167.xls
BOQ • 1.13 MB
TENDERT2282448.pdf
Tender Documents • 1.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .