Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.0 LAccepted-AOC A 3 257 JANAKPURI NEW DELHI 110058 | WEST DELHI | DELHI | 110058 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹33.9 L+₹3.2 L (10.3%)Rejected-Finance 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L2 | Rejected-Finance Other than Lowest | |
| 3 | L3₹62.8 L+₹32.1 L (104.3%)Rejected-Finance | L3 | Rejected-Finance Other than Lowest |
Tender Value
Refer Docs
EMD Value
₹97,100
Closing Date
24 Jun 2021, 6:00 pmClosed
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
GE UTILITY PLANT AND MACHINERY KIRBY PLACE DELHI CANTT-10
COMPREHENSIVE MAINTENANCE OF LIFTS INSTALLED AT ARJAN VIHAR BLOCK NO. 1 TO 10, 12A, 13A, 19A ENGR OFFICER MESS BLOCK NO.II (MAKE OF LIFTS M/S OTIS ELEVETOR CO. INDIA LTD.) ARJAN VIHAR BLOCK NO. 11A, 11B, 12B, 13B, 14, 34, 37 (MAKE OF LIFTS M/S JOHNS
2021_MES_444979_1
GE(U)/PM/D-03/2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
DELHI CANTT
MES contractor enlisted under class D category c(ii) having deposited standing security of Rs 100000 with department. Contractor not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category.
6 documents required · 6 mandatory
₹500
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
₹97,100
Yes
5 Jul 2021
22 May 2021
26 Jun 2021
22 May 2021
24 Jun 2021
5 Jun 2021
Amount
SECTION-I
Supply, installations, commissioning and testing of VVVF main drive alongwith all fixing accessories suitable for 08 passengers lift (make of lift M/s Otis Elevator/ Thyssenkrupp/ Johnson Lifts Pvt. Ltd.) including taking down old unserviceable one complete all as specified and directed. (Make:- As per OEM recommendation).
Supply, installations, commissioning and testing of Door drive alongwith all fixing accessories suitable for 08 passengers lift (make of lift M/s Otis Elevator/ Thyssenkrupp/ Johnson Lifts Pvt. Ltd.) including taking down old unserviceable one complete all as specified and directed. (Make:- As per OEM recommendation).
Supply, fixing, testing and commissioning Automatic Rescue Device (Inverter/ UPS System) 1.5KVA with panel and including necessary internal wiring work, suitable for M/s Thyssen Krupp make lifts at Tigris Moude including ARD batteries of capacity 12Volt, 18AH - 02 Nos each battery shall be minimum three rescue operation can be performed without recharging as per site position for the 13/08 passengers lifts complete all as specified and directed by Engr-in-Charge. (Make of ARD :- As per OEM recommendation) (Make of Battery:- EXIDE/ AMARON/ STANDARD FURKKAVA) .
Supply and fixing of hand rails of 40 mm dia stainless steel, medium grade pipe with curved ending including necessary fittings screwing for passenger/goods lifts including taking down old unserviceable hand rails complete all as specified and directed Engineer-in-Charge. (Make:- As per OEM recommendation)
M & L for aluminium chequered plate flooring 3 mm thick five bar pattern fixing with acssesories including necessary cutting bending, edeging, chamfering etc inside the car cabin of 8/13 passenger lifts etc complete all as specified and directed by Engineer-in-Charge (Make:- As per OEM recommendation)
Supply & fixing CI OSG pit pully as per sample suitable for 08/13 passenger lifts for Ground + Six Floor building of M/s Otis Elevator make lifts at Carriappa Vihar including taking down old unserviceable one complete all as specified and directed. (Make:- As per Otis Elevator recommendation)
M & L for fixing of mirror 4 mm thick inside the car cabin including all acessories for passenger/ goods lifts including taking down old unservicable one complete all as specified and directed by Engineer-in-Charge. (Make: MODIGUARD/ SAINT GOBIN/ PRAYAG/ CERA)
Supply & fixing aluminium car door sill for (Size :- 1700mm x 50mm x 30mm thick as per sample suitable for 13 passenger lifts of make Otis Elevator at Carriappa Vihar including taking diown old uncerviceable car door Sill complete all as specified and directed. (Make:- As per OEM recommendation)
Supply & fixing aluminium landing door sill for (Size :- 1700mm x 50mm x 30mm thick as per sample suitable for 13 passenger lifts of make Otis Elevator at Carriappa Vihar including taking diown old uncerviceable car door Sill complete all as specified and directed. (Make:- As per OEM recommendation)
Supply, installation,commissioning & testing of Landing Operating Panel (LOP) with latest technology with combination of touchless & touch along with all connected accessories complete suitable for 13 Passenger Otis Elevator Make lifts at Carriappa Vihar including taking down old unserviceable one complete all as specified and directed by Engr-in-charge. (Make:- As per OEM recomendation)
Supply, installation,commissioning & testing of PVC coated steel belt along with all connected accessories complete suitable for 13 Passenger Otis Elevator Make lifts at Carriappa Vihar including taking down old unserviceable one complete all as specified and directed by Engr-in-charge. (Make:- As per OEM recomendation)
Supply, installation,commissioning & testing of CE Guard Door Sensor 2100mm at Carriappa Vihar including taking down old unserviceable one complete all as specified and directed by Engr-in-charge. (Make:- As per OEM recomendation)
SECTION-II
Comprehensive maintenance of electrically operated 08 passenger lifts installed at Arjan Vihar, lift in reliable safe and efficient operating condition through MoU with OEM (Original Equipment Manufacturer of lift M/s OTIS Elevator Co. India Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Five floor i.e total Six landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. ARJAN VIHAR:- (a) Block/ Building No. 1 to 10, 12A, 13A & 19A = 13 Nos Lift Make of Lift:- M/s OTIS Elevator Co. India Ltd. Capacity of Lifts:- 08 Passengers = 13 Nos lift. Total Qty = 13 x 04 months = 52
Comprehensive maintenance of electrically operated 09 passenger lifts installed at ENGR Officer Mess, lift in reliable safe and efficient operating condition through MoU with OEM (Original Equipment Manufacturer of lift M/s OTIS Elevator Co. India Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Four floor i.e total Five landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. ENGR OFFICER MESS:- (a) Block/ Building No. II = 01 No Lift Make of Lift:- M/s OTIS Elevator Co. India Ltd. Capacity of Lifts:- 09 Passengers = 01 No lift. Total Qty = 01 x 04 months = 04
Comprehensive maintenance of electrically operated 08 passenger lifts installed at Arjan Vihar, lift in reliable safe and efficient operating condition through MoU with OEM (Original Equipment Manufacturer of lift M/s Johnson Lifts Pvt Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Five floor i.e total Six landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. ARJAN VIHAR:- (a) Block/ Building No. 11A, 11B, 12B, 13B, 14, 34 & 37 = 07 Nos Lift Make of Lift:- M/s Johnson Lifts Pvt. Ltd. Capacity of Lifts:- 08 Passengers = 07 Nos lift. Total Qty = 07 x 04 months = 28
Comprehensive maintenance of electrically operated 08 passenger lifts installed at Arjan Vihar, lift in reliable safe and efficient operating condition through MoU with OEM (Original Equipment Manufacturer of lift M/sThyssenkrupp Elevator India Pvt Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Five floors i.e total Six landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. ARJAN VIHAR:- (a) Block/ Building No. 15 to 17, 24 to 27, 29, 30, 32, 33 & 35 = 12 Nos Lift Make of Lift:- M/sThyssenkrupp Elevator India Pvt Ltd. Capacity of Lifts:- 08 Passengers = 12 Nos lift. Total Qty = 12 x 04 months = 48
Comprehensive maintenance of electrically operated 15 passenger lifts installed at 505 ABW, lift in reliable safe and efficient operating condition through MoU with OEM (Original Equipment Manufacturer of lift M/sThyssenkrupp Elevator India Pvt Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Two floors i.e total Three landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. 505 ABW:- (a) 505ABW Sansadhan Complex = 01 No Lift Make of Lift:- M/sThyssenkrupp Elevator India Pvt Ltd. Capacity of Lifts:- 15 Passengers = 01 No lift. Total Qty = 01 x 04 months = 04
Comprehensive maintenance of electrically operated 2000 Kgs goods lifts installed at 505 ABW, lift in reliable safe and efficient operating condition through MoU with OEM (Original Equipment Manufacturer of lift M/sThyssenkrupp Elevator India Pvt Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + One floors i.e total Two landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. 505 ABW:- (a) 505 ABW Logistic Complex = 02 Nos Lift Make of Lift:- M/sThyssenkrupp Elevator India Pvt Ltd. Capacity of Lifts:- 2000 Kgs Goods Lift = 02 Nos lift.Total Qty = 02 x 04 months = 08
Comprehensive maintenance of electrically operated 08 passenger lifts installed at Tigris Moude, lift in reliable safe and efficient operating condition through MoU with OEM (Original Equipment Manufacturer of lift M/sThyssenkrupp Elevator India Pvt Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Eight floors i.e total Nine landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. TIGRIS MOUDE:- (a) Building/Block No. 29 to 35 = 07 No Lifts Make of Lift:- M/sThyssenkrupp Elevator India Pvt Ltd. Capacity of Lifts:- 08 Passengers = 07 No lifts. Total Qty = 07 x 04 months = 28
Comprehensive maintenance of electrically operated 13 passenger lifts installed at Tigris Moude, lift in reliable safe and efficient operating condition through MoU with OEM (Original Equipment Manufacturer of lift M/sThyssenkrupp Elevator India Pvt Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Eight floors i.e total Nine landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. TIGRIS MOUDE:- (a) Building/Block No. 29 to 35 = 07 No Lifts Make of Lift:- M/sThyssenkrupp Elevator India Pvt Ltd. Capacity of Lifts:- 13 Passengers = 07 No lifts. Total Qty = 07 x 04 months = 28
Notes for Section-II (Item No. 15.00 to 22.00) :- (i) The comprehensive maintenance shall be done through respective OEM of existing lifts i.e. of M/s OTIS Elevator Co. India Ltd, M/s Johnson Lifts Pvt Ltd and M/s Thyssenkrupp Elevator India Pvt Ltd. (ii) The contractor will have to submit MOU on stamp paper of Rs 100/- duly notarized, as per specified Performa given on page No 107 to 109 from respective OEM of existing lifts i.e of M/s OTIS Elevator Co. India Ltd, M/s Johnson Lifts Pvt Ltd and M/s Thyssenkrupp Elevator India Pvt Ltd. within Twenty Eight days from date of Acceptance of tender, failing which the contract will be liable to be cancelled and further action to be taken as per policy in vogue of the contractors default. (iii) Contractor will conclude AMC with OEM and copy of the Agreement along with Tax Invoice will be submitted to Engineer-in-Charge and GE before commencement of AMC. No payment will be made to contractor without submission of valid AMC agreement. (iv) The above maintenance include complete maintenance of existing lift by regularly and systematically examining adjusting fabricating as and when required for smooth and efficient functioning of the equipment/lift. (v) The contract included for repair, replacement of machines, motors, generators, door ropes, inverter/ ARD system, controller parts, PCBs, belts, rollers, gears, bearings, solenoids, coils, chock break shoes, liners, contactors, relays, push bottons, coils, door operator VVF drive, VVVF main drive, car door, safety device limit switches, governor, hoistway door locks, indicators and minor mechanical spare parts. The cost of above materials are deemed to be included in the rates quoted by the contractor.
Notes for Section-II (Item No. 15.00 to 22.00) contd.../ :- (vi) The materials like replacement of car cabin, ceiling frames, panels, fixtures, hoist way door panels, door frames, sills, car floorings, floor covering, light fittings, bulbs, tubes, main line power swtiches, breakers, feeders to controller, hoist way wiring, hydralic jack outer casing, burried piping, alignment of elevator guide rails, smoke and fire sensors, communication devices, security systems, landing doors, sheave rim, hoist rope, ARD battery and ventilator fans are not included in the quoted rate. (vii) Light fittings including bulbs and tube lights, Cabin Fan and ARD Battery shall be issued under Schedule 'B' for 'free for fixing' only. (viii) Contractor to note that monthly service will not be paid for the building undergoing special repairs/ unoccupied buildings and no penalty shall be imposed upon contractor, or all as per direction of Engr-in-Charge. (ix) Contractor will prominently display his contact/ mobile number and OEM contact number inside and outside the lift on each lift for call in emergency. (x) All existing earthing of the lifts shall be maintained and made fully functional by the contractor to the entire satisfaction of the Engr-in-Charge. (xi) Contractor to be submit Safety Security Certificate of lifts from OEM in every month as per performa mentioned in Particular Specification here-in-after and also contractor to submit serviceability of lights and fans in lifts and machine room in every month in writing. (xii) The OEM will also detail one technician staff to inspect the lift every week regarding functioning of lifts or any other issues arising in the lift. The problem noticed if any to be informed immediately to JE E/M / Engr-in-Charge. Incase no technician detailed Rs. 500/- per week per lift will be deducted from conctractors dues. Technician should alaways carry service tools during site visit in every week. (xiii) Monthly maintenance check will be carried out by OEM as per monthly maintenance check list mentioned in Particular Specification here-in-after.
Notes for Section- I & II :- (i) The work shall be done throuhg respective OEM of existing lifts i.e. of M/s OTIS Elevator Co. India Ltd, M/s Johnson Lifts Pvt Ltd and M/s Thyssenkrupp Elevator India Pvt Ltd. (ii) The contractor will have to submit MOU on stamp paper of Rs 100/- duly notarized, as per specified Performa given on page No 107 to 109 from respective OEM of existing lifts i.e of M/s OTIS Elevator Co. India Ltd, M/s Johnson Lifts Pvt Ltd and M/s Thyssenkrupp Elevator India Pvt Ltd. within Twenty Eight days from date of Acceptance of tender, failing which the contract will be liable to be cancelled and further action to be taken as per policy in vogue of the contractors default. (iii) The cost of Setion -I is not included in Section -II. (iv) Completion period of Section-I & Section-II are 120 Days (4 Months)
SECTION-III
Comprehensive maintenance of electrically operated 13 passenger lifts installed at Carriappa Vihar, lift in reliable safe and efficient operating condition through MoU with OEM (Original Equipment Manufacturer of lift M/s OTIS Elevator Co. India Ltd.) by regularly examining, lubricating and adjusting the equipments and carry out planned maintenance in systematic and controlled manner suitable for serving Ground + Six floor i.e total Seven landings with electric power operated doors, auto electric levelling device complete all as specified and directed by Engr-in-Charge. CARRIAPPA VIHAR:- (a) Block/ Building No. 1 to 10 = 10 Nos Lift Make of Lift:- M/s OTIS Elevator Co. India Ltd. Capacity of Lifts:- 13 passenger Lift = 10 Nos lift. Total Qty =10 x 06 months = 60
Notes for Section-III (Item No. 27.00) :- (i) The comprehensive maintenance (GOLD AGREEMENT) shall be done through respective OEM of existing lifts i.e. of M/s OTIS Elevator Co. India Ltd. (ii) The contractor will have to submit MOU on stamp paper of Rs 100/- duly notarized, as per specified Performa given on page No 107 to 109 from respective OEM of existing lifts i.e of M/s OTIS Elevator Co. India Ltd. within Twenty Eight days from date of Acceptance of tender, failing which the contract will be liable to be cancelled and further action to be taken as per policy in vogue of the contractors default. (iii) Contractor will conclude AMC with OEM and copy of the Agreement along with Tax Invoice will be submitted to Engineer-in-Charge and GE before commencement of AMC. No payment will be made to contractor without submission of valid AMC agreement. (iv) The above maintenance include complete maintenance of existing lift by regularly and systematically examining adjusting fabricating as and when required for smooth and efficient functioning of the equipment/lift. (v) The contract included for repair, replacement of machines, motors, generators, door ropes, inverter/ ARD system, controller parts, PCBs, belts, rollers, gears, bearings, solenoids, coils, chock break shoes, liners, contactors, relays, push bottons, coils, door operator VVF drive, VVVF main drive, car door, safety device limit switches, governor, hoistway door locks, indicators and minor mechanical spare parts. The cost of above materials are deemed to be included in the rates quoted by the contractor. (vi) The materials like replacement of car cabin, ceiling frames, panels, fixtures, hoist way door panels, door frames, sills, car floorings, floor covering, light fittings, bulbs, tubes, main line power swtiches, breakers, feeders to controller, hoist way wiring, hydralic jack outer casing, burried piping, alignment of elevator guide rails, smoke and fire sensors, communication devices, security systems, landing doors, sheave rim, hoist rope, ARD battery and ventilator fans are not included in the quoted rate.
Notes for Section-III (Item No. 27.00) contd.../ :- (vii) Light fittings including bulbs and tube lights, Cabin Fan and ARD Battery shall be issued under Schedule 'B' for 'free for fixing' only. (viii) Contractor to note that monthly service will not be paid for the building undergoing special repairs/ unoccupied buildings and no penalty shall be imposed upon contractor, or all as per direction of Engr-in-Charge. (ix) Contractor will prominently display his contact/ mobile number and OEM contact number inside and outside the lift on each lift for call in emergency. (x) All existing earthing of the lifts shall be maintained and made fully functional by the contractor to the entire satisfaction of the Engr-in-Charge. (xi) Contractor to be submit Safety Security Certificate of lifts from OEM in every month as per performa mentioned in Particular Specification here-in-after and also contractor to submit serviceability of lights and fans in lifts and machine room in every month in writing. (xii) The OEM will also detail one technician staff to inspect the lift every week regarding functioning of lifts or any other issues arising in the lift. The problem noticed if any to be informed immediately to JE E/M / Engr-in-Charge. Incase no technician detailed Rs. 500/- per week per lift will be deducted from conctractors dues. Technician should alaways carry service tools during site visit in every week. (xiii) Monthly maintenance check will be carried out by OEM as per monthly maintenance check list mentioned in Particular Specification here-in-after. (xiv) Completion period of Section-III is 180 Days (6 Months)
M/s Dhapola Elevator and Engineering
CH. Ram Chander
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .