| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹8.0 L (6.79%)Admitted-Finance NO 25 OTTHAVADA STREET NEAR NEW BUS STAND ARAKKONAM 631 001 | ARAKKONAM | RANIPET | TAMIL NADU | 631001 | ₹1.3 Cr+₹8.0 L (6.79%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹18.5 L (15.7%)Admitted-Finance | ₹1.4 Cr+₹18.5 L (15.7%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹22.3 L (19.0%)Admitted-Finance | ₹1.4 Cr+₹22.3 L (19.0%) | L4 | Admitted-Finance |
| 5 | L5₹1.5 Cr+₹34.9 L (29.7%)Admitted-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹1.5 Cr+₹34.9 L (29.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Dillibabu L1 | D RAVI L2 | A.H.CONSTRUCTIONS L3 | JAI ENGINEERING L4 | K S CONSTRUCTION L5 | JD ENTERPRISES L6 | Ashok.S L7 | ULTRAPOWER BUILDERS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and laying spreading and compacting graded stone aggregates to wet mix macadum 250mm thick specification inlcuding premixing the materials with water at OMC in mechanical mix plant carriage of mixed materials by tipper to site laying in uniform layers with pavers in sub/base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of materials, labour charges rentals for machinery fuel and all other incidental charges etc., complete as per clause 406 of MORTH. Rev.5. | 1,040 | cum | - | - | - | - | - | - | - | - |
| 2.00 | Plain cement concrete 1:3:6, using 12-20 mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 551 | cum | - | - | - | - | - | - | - | - |
| 3.00 | RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. For column concrete) with form work | 1,102 | cum | - | - | - | - | - | - | - | - |
| 4.00 | Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete. | 23 | M.T | - | - | - | - | - | - | - | - |
| 5.00GST for bidders within TamilNadu | |||||||||||
| 5.01 | SGST | 1 | percentage | - | - | - | - | - | - | - | - |
| 5.02 | CGST | 1 | percentage | - | - | - | - | - | - | - | - |
| 6.00 | GST for bidders outside TamilNadu (IGST) | 1 | percentage | - | - | - | - | - | - | - | - |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
19 Dec 2019, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru-Vi-Ka Indl Estate, Guindy, Chennai-32
Providing RCC road work for the proposed Vembakkam 230/110 KV SS in the premises of the existing Vembakkam 110 KV SS
2019_EB_148476_1
TP1-077/2019-20
Open Tender
Civil Works
Works
120 days
Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.4 L
Yes
19 Feb 2020
22 Nov 2019
20 Dec 2019
22 Nov 2019
19 Dec 2019
22 Nov 2019
Amount
Providing and laying spreading and compacting graded stone aggregates to wet mix macadum 250mm thick specification inlcuding premixing the materials with water at OMC in mechanical mix plant carriage of mixed materials by tipper to site laying in uniform layers with pavers in sub/base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of materials, labour charges rentals for machinery fuel and all other incidental charges etc., complete as per clause 406 of MORTH. Rev.5.
Plain cement concrete 1:3:6, using 12-20 mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement. For column concrete) with form work
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
D RAVI
A.H.CONSTRUCTIONS
JAI ENGINEERING
K S CONSTRUCTION
JD ENTERPRISES
Ashok.S
ULTRAPOWER BUILDERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_178832.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .