Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 CrAccepted-AOC 701 HEADQUARTERS SANT DNYANESHWAR MARG CHETANA COLLEGE ADJUNCT BANDRA EAST MUMBAI 400051 | MUMBAI SUBURBAN | MAHARASHTRA | 400051 | ₹18.6 Cr Quoted ₹24.4 Cr | L1 | Accepted-AOC AOC |
| 2 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | N A CONSTRUCTION PVT. LTD. L1 |
|---|---|---|---|---|
| 1.00 | Item No 01: | 1 | Number | 2,50,000 ₹2,50,000 Lowest |
| 2.00Cleaning the site before commencement and after completion of work. | ||||
| 3.00 | Item No 02 : | 1 | Number | 2,75,000 ₹2,75,000 Lowest |
| 4.00Providing neccesary equipments and carrying out necessary survey for establishment and marking out of the flyover / bridge position of piles, pier, abutments and various other components structures and approach center line with lines and levels with theodolite, establishing and fixing necessary temporary bench marks related to GTS datum including maintaining the same till the end of the work, making and supplying 6 copies of site survey record plan etc.complete. | ||||
| 5.00 | Item No 03: | 770 | Running Metre | 620 ₹4,77,400 Lowest |
| 6.00Providing and removing barricading with the help of portable fencing along the running track where the work is to be done in close vicinity of the track. Fencing shall consist of self supporting steel angles of size 50 x50x6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23x0.23x0.23M placed at c/c distance of 2.0 M along the track. 12 mm dia rods in three horizontal layers tack welded with the angle posts including providing Retro-reflective tapes in Horizontal & vertical direction / & painting in yellow & black bands with synthetic enamel paints as per traffic norms & as per direction of Engineer Incharge. Note : Released material will be the property of the contractor after the completion of work. | ||||
| 7.00 | Item No 04: | 36 | Square Metre | 1,850 ₹66,600 Lowest |
| 8.00Providing and constructing temporary Site office and Field laboratory with UCR masonry in foundation, brick masonry in superstructure , doors and windows, plastering, rough shahabad flooring, GI / AC sheet roofing inclusive of bath and WC for site office with required accessories etc. complete. | ||||
| 9.00 | Item No 05 : | 161.5 | Running Metre | 2,215 ₹3,57,722.5 Lowest |
| 10.00Taking trial bores 75 to 100 mm for 53.0 to 88.9 mm core dia over burden ( by diamond drilling machine ) such as soil of all sorts, soft murum,hard murum and boulders and in soft rock including all materials such as casing pipes and accessories oil, grease, steel, rods, and such other materials as required (including conveying the material to site of work) . Preserving the loose sample in glass jar and core sample serially on site of work and conveying the same to HQ of concernring office as directed. a) over burden 0 to 50 meter. | ||||
Tender Value
₹18.0 Cr
EMD Value
₹9.0 L
Closing Date
12 Mar 2025, 5:30 pmClosed
Executive Engineer, P.W. Division Thane No 1
Executive Engineer, PW Division, Thane no 1 , PWD Compound, Station Road, Thane (West)- 400601
Construction of Flyover Bridge at Sonarpada junction Km 1/700 on Dombivali Railway Station Sagaon Manpada road MDR-73 in Kalyan Taluka Dist Thane
2025_PWR_1152946_1
NIT_NO_81_FOR_2024_25 Second Call
Open Tender
Civil Works
Item Rate
365 days
Thane
As Per Tender Documents
2 documents required · 2 mandatory
₹3,540
₹9.0 L
Chief Engineer, Public Works Region, Konkan
10 Sept 2026
21 Feb 2025
13 Mar 2025
21 Feb 2025
12 Mar 2025
21 Feb 2025
21 Feb 2025 - 27 Feb 2025
27 Feb 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No 01: | 1 | Number | 107 | ₹107 |
| 2 | Cleaning the site before commencement and after completion of work. | - | - | - | - |
| 3 | Item No 02 : | 1 | Number | 107 | ₹107 |
| 4 | Providing neccesary equipments and carrying out necessary survey for establishment and marking out of the flyover / bridge position of piles, pier, abutments and various other components structures and approach center line with lines and levels with theodolite, establishing and fixing necessary temporary bench marks related to GTS datum including maintaining the same till the end of the work, making and supplying 6 copies of site survey record plan etc.complete. | - | - | - | - |
| 5 | Item No 03: | 770 | Running Metre | 107 | ₹82,390 |
| 6 | Providing and removing barricading with the help of portable fencing along the running track where the work is to be done in close vicinity of the track. Fencing shall consist of self supporting steel angles of size 50 x50x6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23x0.23x0.23M placed at c/c distance of 2.0 M along the track. 12 mm dia rods in three horizontal layers tack welded with the angle posts including providing Retro-reflective tapes in Horizontal & vertical direction / & painting in yellow & black bands with synthetic enamel paints as per traffic norms & as per direction of Engineer Incharge. Note : Released material will be the property of the contractor after the completion of work. | - | - | - | - |
| 7 | Item No 04: | 36 | Square Metre | 107 | ₹3,852 |
| 8 | Providing and constructing temporary Site office and Field laboratory with UCR masonry in foundation, brick masonry in superstructure , doors and windows, plastering, rough shahabad flooring, GI / AC sheet roofing inclusive of bath and WC for site office with required accessories etc. complete. | - | - | - | - |
| 9 | Item No 05 : | 161.5 | Running Metre | 107 | ₹17,280.5 |
| 10 | Taking trial bores 75 to 100 mm for 53.0 to 88.9 mm core dia over burden ( by diamond drilling machine ) such as soil of all sorts, soft murum,hard murum and boulders and in soft rock including all materials such as casing pipes and accessories oil, grease, steel, rods, and such other materials as required (including conveying the material to site of work) . Preserving the loose sample in glass jar and core sample serially on site of work and conveying the same to HQ of concernring office as directed. a) over burden 0 to 50 meter. | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
E-81-01.pdf
Tender Documents • 2.93 MB
BOQ_2005835.xls
BOQ • 0.35 MB
Tenderdocument.pdf
Tender Documents • 2.93 MB
BOQ.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .