Executive Engineer PWD
Executive Engineer PWD
Completion of road from Main road Dhundak Marhote to Mohalla Mahiran,Surankote Km 1st RD 0 to Km 3rd RD 1000 by way of Balance Earth Work in cutting, Walling , X-Drainage 75 mm thick Grade III , 25mm thick SDBC. Under State Plan Projectaization Lan
2020_PWDJK_112394_1
e-NIT No.95/2020-21 dated 26-12-2020
Open Tender
Civil Works
Item Rate
180 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
Executive Engineer PWD Poonch
₹90,000
Yes
20 Feb 2021
26 Dec 2020
12 Jan 2021
26 Dec 2020
11 Jan 2021
26 Dec 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. ( Not exceeding 1.5 mtr in width ) and for shafts , wells, cesspits and the like not exceeding 10sqm on plan, depth upto1.5 mtr including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level . 1:5:10 ( 1 cement :5 coarse sand :10 graded stone crushed aggregate 40 mm nominal size ) using crushed stone aggregate including curing , all leads /lifts & carriages (Complete job)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work up to plinth level 1:3:6 with ( 1 cement :3coarse sand :6 graded crushed stone aggregate 20 mm nominal size) using 20% stones) including curing , all leads /lifts & carriages (Complete job)
Providing and laying cement concrete in retaining walls, return walls (any thickness) including attached pilasters, columns , piers , posts, struts butteresses , string or laces , courses , parapets , coping , bed blocks , anchorblocks , plain window sills ,sunken,floors , fillets etc. upto floor five level , excluding the cost of centring , shuttering and finishing.1:3:6 ( 1 cement :3coarse sand :6 graded crushed stone aggregate 20 mm nominal size) using 20% stones..including curing , all leads /lifts & carriages (Complete job)
Stone filling including cost of stones. In horizontal on level .including , all leads /lifts & carriages (Complete job)
Centring and shuttering including strutting propping etc. and removal of form for :-
Foundations, footings, bases of columns etc for mass concrete
Walls ( any thickness ) including attached pilasters , butteresses , plinth and string course
Filling available excavated earth (excluding rock) in trenches plinth, sides of foundation etc. Layers not exceeding 20 cm in depth,consolidating each deposited layer by ramming and watering lead up to 50 m and lift upto 1.5 M (Behind R-Walls , Culverts , Abutments,Wing Wall,Cushion Over Hume Pipes) including , all leads /lifts & carriages (Complete job)
Providing and laying non-pressure NP2 class ( light duty) 900 mm dia R.C.C H.P with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement :2 fine sand ) including testing of joints ,Cost of pipes etc complete ( Recovery rate of 8'-0" length pipe @ Rs.13500+ Taxes ) supplied by the department
Providing and laying WBM-GR- III 75 mm thick with broken Nallah /Crusher stone aggregate of 53 to 22.4mm size including screening of 11.2 mm size and usingcrusher dust as binding material sorting, spreading to template and consolidation with Power Road Roller of 8-10 Tonne capacity including carriage all lead and lift for complete job.
Providing,& laying semi dense bituminous concrete of 25 mm average compacted thickness with bitumen of 80/100(VG-10) grade @ 5%(percentage by weight of total mix) on prepared surface with specified graded crushed stone aggregates for wearing course including loading of aggregate with F.E loader and hot mixing of bitumen with filler and stone aggregates in hot mix plant , transporting the mixed material by tippers to paver and laying the mixed material with mechanical paver finisher fitted with electronic sensing device to the required level and grade and rolling with road rollers as per MORTH specifications and direction of Engineer-in-Charge to achieve the desire density and compaction including the cost of brooming , primer/tack coat , all leads/lifts , carriages , loading & unloading ( Complete job)
MS BHAT ROAD AND ROOF BUILDERS
MOHD IKHLAQ
MOHD AKRAM CONTRACTOR
ZAFFAR AHMED
Asif Iqbal
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .